32844200
City of Findlay HAN-Findlay Melrose & Broad Avenue, PID117615
This project consists of nearly 11,400 linear feet of curb removal and replacement and/or pavement planning (approximately 25,535 SY) and resurfacing (approximately 1,419 CY) on Melrose and Broad Avenue within the City of Findlay and Hancock County. Incidental items include necessary sidewalk or curb ramp replacement (approximately 6,145 SF), treatment of shoulders, adjustment catch basins, and grading and seeding. Other minor work is described in the details for each segment of pavement.
The 2023 Ohio Department of Transportation (ODOT) Construction and Materials Specifications shall be followed. Required modifications to the ODOT specifications are noted herein. City of Findlay Specifications and Standard Drawings shall also be adhered to where applicable and are available at the City of Findlay Engineering Department, 318 Dorney Plaza, Findlay, OH 45840. Federal prevailing wages shall apply.
The DBE goal for this project is 7%.
**SPECIAL NOTE FOR BIDDERS:
DBE UTILIZATION PLAN
All Bidders shall submit a DBE Utilization Plan at the time of bid setting forth specific information demonstrating how the Bidder will achieve the DBE goal. By submitting a DBE Utilization Plan, the Bidder is affirming that they will be using the DBE firms identified in the Utilization Plan to meet the DBE contract goal. The DBE Utilization Plan shall be submitted online at:
https://odot.formstack.com/forms/dbe_copy
Final Completion: on or before August 1, 2025
Engineering Estimate: $ 1,250,612.25
| 01/28/2025 07:00 PM UTC |
31943600
Project Name: 50 North Generator Replacement (CDBG RLF)
Project Description: This project consists of removing and disposing of the 150kW Generac generator located at the 50 North senior center in the City of Findlay, Ohio and installing a new 150kW generator (Generac or approved alternate). The new generator will be located in the same space as the unit being removed. The 50 North facility is located at 339 E Melrose Ave, Findlay, OH 45840.
This project is funded by Community Development Block Grant RLF funds. Bidders shall be aware of the required Federal and State Requirements, including Equal Employment Opportunity Requirements. In the event that installation costs meet or exceed 20 percent of the total project cost, Davis Bacon Wage rates will apply to this project.
Final Completion Date: July 1, 2025
Engineer’s Estimate: $90,500.00
| 01/23/2025 07:00 PM UTC |
35743400
The City of Findlay, Ohio, is inviting firms to submit a sealed Statement of Qualifications (SOQ) for the following:
CITY OF FINDLAY WATER MASTER PLAN
The City of Findlay is requesting statement of qualifications from engineering firms for services of creating the City's Water Master Plan. The intent is to conduct a holistic plan for the CITY’s Water Treatment Plant and distribution system that identifies deficiencies and improvements required by the City to address regulatory compliance, safety, technology improvements, process innovations, aging infrastructure, and anticipated future water demands. In particular, The City is seeking a firm with demonstrated expertise and competence in conventional water treatment process evaluation, design and construction.
Firms interested in being considered for selection should respond by submitting one original and four copies of the SOQ in a sealed envelope marked “CITY OF FINDLAY WATER MASTER PLAN” to City of Findlay Engineering Department, 318 Dorney Plaza, Room 304, Findlay, Ohio 45840 by 2:00 PM on January 15, 2025.
| 01/15/2025 07:00 PM UTC |
31942700
This project consists of replacing existing lights, fixtures, switches, etc. to finish the conversion of Municipal Building to all LED lighting. This is a rebid of a previously solicited project.
Engineering Estimate: $232,000
| 12/12/2024 07:00 PM UTC |
35611600
This project consists of the replacement of the gravity sanitary sewer system in the Spring Lake Subdivision. The project will include but not be limited to 5,365 LF of 8-inch sanitary sewer, 1,902 LF of 10-inch sanitary sewer, 720 LF of 12-inch sanitary sewer, 1,941 LF of 15-inch sanitary sewer, 37 sanitary manholes, 10-foot diameter wet well and pumps, 8-foot diameter valve box and valves and 1,719 LF of 8-inch forcemain. Abandoning of the existing system, removal of manholes, grading & seeding, maintenance of traffic and asphalt pavement repair, as required, are also included. The existing system must remain in service until the new pump station and forcemain are installed and operational or an alternative plan is approved. Estimated Cost: $3,237,000
| 11/26/2024 07:00 PM UTC |
31922300
This project consists of replacing existing lights, fixtures, switches, etc. to finish the conversion of Municipal Building to all LED lighting.
Engineering Estimate: $146,000
| 11/12/2024 07:00 PM UTC |
Hickory Lane
This project consists of the installation of a gravity sewer system to replace the grinder pump/forcemain system in the Eastgate Subdivision. The project runs the entirety of Hickory Lane and extends through private property to a gravity sewer on Beechwood Road. Included in the sanitary sewer improvement, but not limited to, is approximately 3,785 LF of 8-inch sanitary sewer, 17 sanitary manhole installations, and connections to approximately 15 residential force mains. Pavement trench repair as required and grading & seeding is also included. Service to the residences must be maintained during construction.
Construction Estimate $899,000.
| 10/31/2024 03:00 PM UTC |
35243500- Findlay Airport Master Plan
The City of Findlay, Ohio, is inviting firms to submit a sealed Statement of Qualifications (SOQ) for the following:
FINDLAY AIRPORT (FDY)-AIRPORT MASTER PLAN
The City of Findlay is seeking a qualified aviation consulting and engineering for the preparation of an Airport Master Plan. Qualified firms shall have extensive, recent and direct experience in all phase of a master plan development, including but not limited to, aviation planning, environmental planning, and permitting, aviation engineering, and financial planning for general aviation airports. This Request for Qualifications (RFQ) will result in an agreement with a consultant to development a comprehensive Airport Master Plan.
Firms interested in being considered for selection should respond by submitting one original and four copies of the SOQ in a sealed envelope marked “FINDLAY AIRPORT (FDY)- AIRPORT MASTER PLAN” to City of Findlay Engineering Department, 318 Dorney Plaza, Room 304, Findlay, Ohio 45840 by 3:00 PM on October 11, 2024.
| 10/11/2024 07:00 PM UTC |
68
Item #68 - Copper Sulfate Pentahydrate Liquid - The City of Findlay is accepting proposals for Copper Sulfate Pentahydrate Liquid for the period January 1, 2025 to December 31, 2025.
| 10/10/2024 06:00 PM UTC |
1
Item #1-Pebble Lime Bulk - The City of Findlay is accepting proposals for the period January 1, 2025 to December 31, 2025.
| 10/10/2024 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.