City of Findlay
318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121
318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
13
Item #13 - Asphalt Concrete - The City of Findlay is accepting proposals for Asphalt Concrete for the period January 1, 2027, to December 31, 2027.
| 11/12/2026 07:00 PM UTC |
|
35664600
This project consists of removing an existing 12” water line and a 15” sanitary line out of the existing 36” storm sewer. To remove the existing 12” water line from the storm sewer it will need to be lowered under the storm sewer. It will need to be lowered roughly 5 feet. To remove the existing 15” out of the storm sewer the manholes on both ends will need to be lowered. The existing manholes will be removed, and the new manholes will be roughly 3 feet lower than the existing ones. There will be a new 18” sanitary sewer that is ran from the two new manholes that goes under the existing storm sewer, that is 408 LF. This project will also include attaching all other existing lines to the new manholes. The south manhole will also need a 58 LF of 18” sanitary sewer to be attached to the existing pipe that is to southeast.
The work also includes all labor, equipment, traffic control, pavement saw cutting, incidental excavation, disposal of removed materials, pavement restoration immediately surrounding the structures, and all other work necessary to complete the adjustments. Upon completion, all manholes shall provide a smooth riding surface, be free from movement or rocking, and meet the required line and grade tolerances established by the Engineer.
Bidders are advised to pay close attention to the specific details of the Supplemental Specifications and Pay Item Descriptions. Item descriptions detail all that is included with each pay item as well as pay limits for certain items.
During construction, maintenance of traffic and access to local businesses and residences will be major concerns for the City, Contractor, and adjacent property owners.
This project is located within the City of Findlay corporation limits and is thereby eligible for City Income Tax collection. The project is funded by City of Findlay local funds. Bidders shall be aware of any required Equal Employment Opportunity requirements as well as the State prevailing wages that apply to this project. Domestic steel use requirements also apply to this project as specified in Section 153.011 of the Ohio Revised Code. A copy of Section 153.011 can be obtained from any office of the Ohio Department of Administrative Services.
After the bid date, contracts will be awarded as soon as possible in order to expedite securing materials and beginning construction.
Specific Notes:
1. Rock Elevation: 781.00’ +/-
2. Remove 12” Water line and 15” Sanitary Sewer from existing 36” Storm Sewer including existing vaults, Reestablish flow in 36” RCP.
FINAL COMPLETION DATE: May 28, 2027
ENGINEER’S ESTIMATE: $ 271,380
| 11/12/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
#34
Item #34 - Jet-A Turbine Aviation Fuel - The City of Findlay is accepting proposals for supply and delivery of an estimated 200,000 gallons of Jet-A Turbine Aviation Fuel, meeting latest ASTM D-1655 specifications, to the Findlay Airport at 1615 Gray Street, during the period of January 1, 2020 to December 31, 2020.
| 10/31/2019 06:00 PM UTC |
|
#61
Item #61 - Temporary Staffing Services - The City of Findlay is accepting proposals for temporary staffing services to fill various seasonal employee positions for the period of January 1, 2020 to December 31, 2020.
| 10/31/2019 06:00 PM UTC |
|
#63
Item #63 - C909 Plastic Pipe - The City of Findlay is accepting proposals for furnishing and delivery of C909 plastic pipe for the period January 1, 2020 to December 31, 2020.
| 10/31/2019 06:00 PM UTC |
|
31993700
City of Findlay- CUBE Parking Lot Resurfacing Phase One
This project consists of planning and resurfacing a section of the existing parking lots at the CUBE, located at 3430 North Main Street.
The 2019 Ohio Department of Transportation (ODOT) Construction and Materials Specifications shall be followed. Required modifications to the ODOT specifications are noted herein. City of Findlay Specifications and Standard Drawings shall also be adhered to where applicable and are available at the City of Findlay Engineering Department, 318 Dorney Plaza, Findlay, OH 45840.
The project is funded through the City of Findlay’s Capital Improvements Fund. State prevailing wages and the City of Findlay income taxes shall apply.
The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any accepted Alternates as selected by the City of Findlay.
Final Completion: November 15, 2019
Engineering Estimate: $ 115,000 (Base Bid)
| 09/17/2019 06:00 PM UTC |
|
35691300
City of Findlay 2019 Annual Sewer and Manhole Lining Program
Completion Date: April 5th, 2020
Engineering Estimate: $400,000
| 08/07/2019 06:00 PM UTC |
|
35691400
City of Findlay 2019 Annual Sewer Televising Program-This program consists of performing closed circuit television inspection on various storm and sanitary sewers located within the City of Findlay. This program will assess the condition of the selected sewer lines, and present the information to the City of Findlay so that the information can be used to make decisions regarding rehabilitation and/ or replacement. The sewers will be rated by using a standardized field investigation approach to efficiently utilize time and resources when evaluating the selected sewers. This project shall consist of, but not limited to, sewer cleaning as necessary for proper sewer evaluating, CCTV recordings, evaluating and rating of recorded sewers, and electronic format submission of recorded/ evaluated sewers.
Completion Date: April 10, 2020
Engineering Estimate (Base Bid Only): $300,000
| 07/31/2019 06:00 PM UTC |
|
Country Club Drive Slope Rehabilitation
The City of Findlay is requesting qualifications for a slope stabilization project located on the bank of the Blanchard River at Country Club Drive. This solicitation is for design of options, engineering plans, cost estimates and specifications.
| 07/10/2019 04:00 PM UTC |
|
35293200
City of Findlay Airport Crack Seal and Re-Mark Runway 7-25.
Pre-Bid Meeting will be held on Monday, June 17, 2019 at 11:00 AM at the Findlay Airport Terminal Building located at 1615 Gary Street, Findlay, OH 45840
Engineer's Estimate (Base Bid)- $176,000.00
| 06/27/2019 06:00 PM UTC |
|
35681200
City of Findlay WPCC UV Replacement & Improvements
This project consists of replacing the existing UV disinfection system and modification of the existing UV channel. The contract also includes, but not limited to; construction of new UV bypass pipe, replacing existing spray water pumps, replace existing process water pump and locate in a newly constructed process water pit, and replacement of effluent sampler.
Substantial Completion Date: April 20, 2020
Final Completion Date: May 31, 2020
Engineer’s Estimate: $2,570,000
| 06/19/2019 06:00 PM UTC |
|
35793300
City of Findlay Olive Street 8-inch Waterline Replacement.
This project consists of installing a new 8-inch C909 waterline on Olive Street., running along the south side of the roadway, in the center westbound lane of Olive Street., from S. Main Street to the west side of Fairmount Drive. The new waterline will need to be directional drilled under S. Main Street to the west side of the southbound curb, to tap onto the existing 6-inch line.
This project shall consist of, but not limited to, 960 LF of 8-inch C909 waterline, 100 LF of 8-inch directional drill (alternate), 100 LF of 6-inch waterline, full depth pavement repair, waterline tie-ins, waterline abandonments, fire hydrant removal, hydrant replacement, misc. fittings, seeding and mulching.
Substantial Completion Date: August 30, 2019
Final Completion Date: September 13, 2019
Engineer’s Estimate: $130,000.00
| 06/19/2019 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.