Item #13 - Asphalt Concrete - The City of Findlay is accepting proposals for Asphalt Concrete for the period January 1, 2027, to December 31, 2027.
| 11/12/2026 07:00 PM UTC |
|
35664600
This project consists of removing an existing 12” water line and a 15” sanitary line out of the existing 36” storm sewer. To remove the existing 12” water line from the storm sewer it will need to be lowered under the storm sewer. It will need to be lowered roughly 5 feet. To remove the existing 15” out of the storm sewer the manholes on both ends will need to be lowered. The existing manholes will be removed, and the new manholes will be roughly 3 feet lower than the existing ones. There will be a new 18” sanitary sewer that is ran from the two new manholes that goes under the existing storm sewer, that is 408 LF. This project will also include attaching all other existing lines to the new manholes. The south manhole will also need a 58 LF of 18” sanitary sewer to be attached to the existing pipe that is to southeast.
The work also includes all labor, equipment, traffic control, pavement saw cutting, incidental excavation, disposal of removed materials, pavement restoration immediately surrounding the structures, and all other work necessary to complete the adjustments. Upon completion, all manholes shall provide a smooth riding surface, be free from movement or rocking, and meet the required line and grade tolerances established by the Engineer.
Bidders are advised to pay close attention to the specific details of the Supplemental Specifications and Pay Item Descriptions. Item descriptions detail all that is included with each pay item as well as pay limits for certain items.
During construction, maintenance of traffic and access to local businesses and residences will be major concerns for the City, Contractor, and adjacent property owners.
This project is located within the City of Findlay corporation limits and is thereby eligible for City Income Tax collection. The project is funded by City of Findlay local funds. Bidders shall be aware of any required Equal Employment Opportunity requirements as well as the State prevailing wages that apply to this project. Domestic steel use requirements also apply to this project as specified in Section 153.011 of the Ohio Revised Code. A copy of Section 153.011 can be obtained from any office of the Ohio Department of Administrative Services.
After the bid date, contracts will be awarded as soon as possible in order to expedite securing materials and beginning construction.
Specific Notes:
1. Rock Elevation: 781.00’ +/-
2. Remove 12” Water line and 15” Sanitary Sewer from existing 36” Storm Sewer including existing vaults, Reestablish flow in 36” RCP.
FINAL COMPLETION DATE: May 28, 2027
ENGINEER’S ESTIMATE: $ 271,380
| 11/12/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
35681500
City of Findlay- Water Pollution Control Center Clarifier Rehab.
Projected Start Date: April 1, 2019
Substantial Completion: October 31, 2019
Engineers Estimate: $260,000
This project consists of blast cleaning all of the steel in an existing Clarifier Basin, apply a zinc urethane system to the existing catwalk support beams, apply zinc epoxy to the prepared surfaces, and perform miscellaneous repairs to interior sidewall expansion joints and spalling floors.
| 12/05/2018 07:00 PM UTC |
|
35741400
City of Findlay Stanford Parkway Waterline-
Engineer Estimate: $230,000
Completion Date: June 14, 2019
This project consists of constructing a 12-inch C909 waterline running along Stanford Parkway from Westfield Drive to River Road. From the Stanford Parkway/ River Road intersection the waterline will be continued to the east to tie into an existing waterline that feeds the City of Findlay Water Pollution Control Center. From the same intersection, the waterline will be bored under the Blanchard River, to tie into the existing 12-inch waterline that is located on Howard St. Majority of the waterline will be in the grass boulevard on the East side of Stanford Parkway crossing a few concrete and asphalt driveways; it will be placed in the roadway on River Road, requiring full depth trench repair in this location. North of the Blanchard River the waterline will be placed in the grass on the south side of Howard St. There will be 180 LF of the 12-inch waterline that will need to be jack and bored with a 24-inch casing pipe from River Road north under the Blanchard River to Howard Street. This project shall consist of, but not limited to, 1384 LF of 12-inch C909 waterline, 180 LF of 24-inch casing pipe jack and bore, concrete and asphalt drive replacement, waterline tie-ins, waterline abandonments, misc. fittings, seeding and mulching.
| 11/21/2018 07:00 PM UTC |
|
35681100
City of Findlay 2018 Annual Sewer Televising Program-This program consists of performing closed circuit television inspection on various storm and sanitary sewers located within the City of Findlay. This program will assess the condition of the selected sewer lines, and present the information to the City of Findlay so that the information can be used to make decisions regarding rehabilitation and/ or replacement. The sewers will be rated by using a standardized field investigation approach to efficiently utilize time and resources when evaluating the selected sewers. This project shall consist of, but not limited to, sewer cleaning as necessary for proper sewer evaluating, CCTV recordings, evaluating and rating of recorded sewers, and electronic format submission of recorded/ evaluated sewers.
Completion Date: May 10, 2019
Engineering Estimate (Base Bid Only): $145,000
| 11/21/2018 07:00 PM UTC |
|
City of Findlay Salt Barn Design-Build, 31972900
The proposed Design-Build Salt Barn Structure will be constructed at the City of Findlay Street Department located at 330 North Cory Street. Selected vendor will propose a building structure that is capable of holding 7000 to 8000 tons of salt within the structure. The vendor should provide all plans, permits, labor, equipment and materials to construct a structure suitable for salt storage at the proposed location.
| 10/30/2018 06:00 PM UTC |
|
35783300
Services for Water Meter System Replacement, Project No. 35783300 - The City of Findlay invites interested firms to submit Qualifications for an Advanced Metering Infrastructure (AMI) Full Service Implementation and Maintenance Program in order to improve the process of collecting monthly water utility meter data to enhance the level of service offered to customers.
The AMI Full Service Program will be implemented system wide in a short time frame, in order to maximize the benefits of the system. Interested parties are to submit qualifications for a turnkey deployment of approximately 20,000 metered accounts, followed by an ongoing maintenance program that includes network, AMI endpoints, and software maintenance as well as full service data hosting and delivery to the City.
| 10/29/2018 06:00 PM UTC |
|
32852900
City of Findlay, Lima Ave. and Western Ave. Intersection Upgrade.
This project consists of the reconstruction of the traffic signal, curb ramps, signing, pavement marking, interconnect and the installation of railroad preemption system at the intersection of Lima Avenue and Western Avenue in the City of Findlay.
Engineer Estimate: $261,000
Final Completion: 8/23/2019
| 10/25/2018 06:00 PM UTC |
|
13
Item #13 - Asphalt Concrete - The City of Findlay is accepting proposals for various quantities and types of asphalt concrete to be delivered for the period of January 1, 2019 to December 31, 2019.
| 10/17/2018 06:00 PM UTC |
|
1601
Item #1601 - Ready Mix Concrete - The City of Findlay is accepting proposals for supply and delivery of various types and quantities of ready mix concrete for the period of January 1, 2019 to December 31, 2019.
| 10/17/2018 06:00 PM UTC |
|
1602
Item #1602 - CDF - The City of Findlay is accepting proposals for supply and delivery an estimated quantity of 500 CY of 50# and 100# CDF for the period of January 1, 2019 to December 31, 2019.
| 10/17/2018 06:00 PM UTC |
|
1603
Item #1603 - Class C Concrete - The City of Findlay is accepting proposals for supply and delivery of an estimated quantity of 1,200 CY of Class C Concrete for the period of January 1, 2019 to December 31, 2019.
| 10/17/2018 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.