Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
WP077801 Bender Park Sediment Abatement
Work consists of dredging sediment from the Bender Park boat launch and relocating it within the designated area of Bender Park as indicated in the project bid documents. Additional work consists of dewatering, erosion control, grading, planting, and plant maintenance. A similar project was bid, though not awarded, in May of 2025. This project differs from that one in that there are alternatives for less dredged volume and a longer timeframe to complete the work. Pre-Bid Meeting (Optional): Wednesday June 18th, 2025 at 2:00PM. Meeting to be held virtually on Microsoft Teams. Please request an invite to this meeting by emailing Jack Sudar at jack.sudar@milwaukeecountywi.gov
07/02/2025 07:00 PM UTC
WS0149012 Clinton Rose Senior Center Renovation
Work of the project includes predominately interior renovations to the senior center. Scope generally includes demolition of selected existing conditions and construction of new kitchen, computer lab, health rooms, activity rooms, and office space. Finish updates (flooring, walls, cabinetry, ceilings) throughout. HVAC, electrical, and plumbing updates throughout. ADA updates and reconfiguration to restrooms and entryway. The project will also include installing new curb and concrete sidewalk for accessible route from parking lot and other related infrastructure improvements as specified in the bid documents. Optional Pre-Bid Meeting: June 17th at 10:30 - 11:30am. Meet in person at Clinton Rose Senior Center, 3045 N Dr Martin Luther King Jr Dr Milwaukee.
07/02/2025 07:00 PM UTC
WP037201 McKinley Park Flushing Channel
Replacement and rehabilitation of seawall along flushing channel near McKinley Marina. Includes installation of steel sheet piling, fiber reinforced polymer panels, grading, plumbing, electrical, landscaping, custom railing, and concrete seawall walkway. Optional Pre-Bid Meeting: Wednesday, June 11th, 2025, at 10AM. Meet outside at the Milwaukee Yacht Club Gate, McKinley Park, Milwaukee, WI. This onsite walkthrough and meeting is for contractors to visualize project. This meeting is to explain requirements and ask questions.
07/10/2025 07:00 PM UTC
WP0749 - Oak Leaf Trail Extension - Kohl Park Connection
Work of the project includes building a 10-foot-wide asphalt path approximately 2.36 miles long. Base Bid does not include the 69th St neighborhood connection 115+27 to 127+23 and 70th St neighborhood connection 500+57 to 507+88, which is future work by others. Total 10-foot-wide asphalt path length with future work by other is approximately 2.53 miles long. Optional Pre-Bid Meeting: Tuesday, June 24, 2025 at 1:00 PM. Meet outside at Mequon Nature Preserve near W. County Line Rd.
07/10/2025 07:00 PM UTC
5740-25000 2025 Countywide Time & Material: Asphalt Paving
Milwaukee County is seeking to create a centralized pool of contracts which any County department may draw from to complete maintenance and repair projects, as needed. Multiple awards per T&M contract type. Awarded contract does not guarantee work. Separate bid submittal in Bid Express for each T&M contract type. Milwaukee County and the contractor will negotiate the scope of each project on a case-by-case basis. Optional Pre-Bid Meeting: July 9th, 2025 at 3:00pm. Teams link to meeting to be posted on Bid Express or email michelle.johnson@milwaukeecountywi.gov
07/23/2025 07:00 PM UTC
5740-25000 2025 Countywide Time & Material: Native Plants Landscaping
Milwaukee County is seeking to create a centralized pool of contracts which any County department may draw from to complete maintenance and repair projects, as needed. Multiple awards per T&M contract type. Awarded contract does not guarantee work. Separate bid submittal in Bid Express for each T&M contract type. Milwaukee County and the contractor will negotiate the scope of each project on a case-by-case basis. Optional Pre-Bid Meeting: July 9th, 2025 at 3:00pm. Teams link to meeting to be posted on Bid Express or email michelle.johnson@milwaukeecountywi.gov
07/23/2025 07:00 PM UTC
5740-25000 2025 Countywide Time & Material: Landscaping
Milwaukee County is seeking to create a centralized pool of contracts which any County department may draw from to complete maintenance and repair projects, as needed. Multiple awards per T&M contract type. Awarded contract does not guarantee work. Separate bid submittal in Bid Express for each T&M contract type. Milwaukee County and the contractor will negotiate the scope of each project on a case-by-case basis. Optional Pre-Bid Meeting: July 9th, 2025 at 3:00pm. Teams link to meeting to be posted on Bid Express or email michelle.johnson@milwaukeecountywi.gov
07/23/2025 07:00 PM UTC
5740-25000 2025 Countywide Time & Material: Metal Fabrication
Milwaukee County is seeking to create a centralized pool of contracts which any County department may draw from to complete maintenance and repair projects, as needed. Multiple awards per T&M contract type. Awarded contract does not guarantee work. Separate bid submittal in Bid Express for each T&M contract type. Milwaukee County and the contractor will negotiate the scope of each project on a case-by-case basis. Optional Pre-Bid Meeting: July 9th, 2025 at 3:00pm. Teams link to meeting to be posted on Bid Express or email michelle.johnson@milwaukeecountywi.gov
07/23/2025 07:00 PM UTC
5740-25000 2025 Countywide Time & Material: Carpet and Flooring
Milwaukee County is seeking to create a centralized pool of contracts which any County department may draw from to complete maintenance and repair projects, as needed. Multiple awards per T&M contract type. Awarded contract does not guarantee work. Separate bid submittal in Bid Express for each T&M contract type. Milwaukee County and the contractor will negotiate the scope of each project on a case-by-case basis. Optional Pre-Bid Meeting: July 9th, 2025 at 3:00pm. Teams link to meeting to be posted on Bid Express or email michelle.johnson@milwaukeecountywi.gov
07/23/2025 07:00 PM UTC
5740-25000 2025 Countywide Time & Material: Electrical
Milwaukee County is seeking to create a centralized pool of contracts which any County department may draw from to complete maintenance and repair projects, as needed. Multiple awards per T&M contract type. Awarded contract does not guarantee work. Separate bid submittal in Bid Express for each T&M contract type. Milwaukee County and the contractor will negotiate the scope of each project on a case-by-case basis. Optional Pre-Bid Meeting: July 9th, 2025 at 3:00pm. Teams link to meeting to be posted on Bid Express or email michelle.johnson@milwaukeecountywi.gov
07/23/2025 07:00 PM UTC
5740-25000 2025 Countywide Time & Material: Heating and Ventilating
Milwaukee County is seeking to create a centralized pool of contracts which any County department may draw from to complete maintenance and repair projects, as needed. Multiple awards per T&M contract type. Awarded contract does not guarantee work. Separate bid submittal in Bid Express for each T&M contract type. Milwaukee County and the contractor will negotiate the scope of each project on a case-by-case basis. Optional Pre-Bid Meeting: July 9th, 2025 at 3:00pm. Teams link to meeting to be posted on Bid Express or email michelle.johnson@milwaukeecountywi.gov
07/23/2025 07:00 PM UTC
5740-25000 2025 Countywide Time & Material: Plumbing
Milwaukee County is seeking to create a centralized pool of contracts which any County department may draw from to complete maintenance and repair projects, as needed. Multiple awards per T&M contract type. Awarded contract does not guarantee work. Separate bid submittal in Bid Express for each T&M contract type. Milwaukee County and the contractor will negotiate the scope of each project on a case-by-case basis. Optional Pre-Bid Meeting: July 9th, 2025 at 3:00pm. Teams link to meeting to be posted on Bid Express or email michelle.johnson@milwaukeecountywi.gov
07/23/2025 07:00 PM UTC
5740-25000 2025 Countywide Time & Material: General Construction
Milwaukee County is seeking to create a centralized pool of contracts which any County department may draw from to complete maintenance and repair projects, as needed. Multiple awards per T&M contract type. Awarded contract does not guarantee work. Separate bid submittal in Bid Express for each T&M contract type. Milwaukee County and the contractor will negotiate the scope of each project on a case-by-case basis. Optional Pre-Bid Meeting: July 9th, 2025 at 3:00pm. Teams link to meeting to be posted on Bid Express or email michelle.johnson@milwaukeecountywi.gov
07/23/2025 07:00 PM UTC
13 Solicitations

Closed Solicitations

Number Deadline
9420-20580 - Little Menomonee River Parkway Habitat Restoration: Sections 4 and 5
Habitat restoration within the Little Menomonee River Parkway including reforestation, invasive species removal, grassland restoration and management, forest stand improvement, wetland restoration and sedge meadow restoration. Project is funded by a Great Lakes Restoration Initiative Grant sub-granted through the Department of Natural Resources to Milwaukee County Parks. Pre-Bid Meeting: One Pre-bid meeting will take place on October 13, 2021 at 1:00PM. Meeting will be held virtually via Microsoft Teams. Email Project Manager, Natalie Dutack at Natalie.Dutack@milwaukeecountywi.govfor a link to the meeting. CONTRACTOR SHALL PROVIDE WRITTEN PROJECT BID SUBMITTAL OF COVID-19 SAFETY PROTOCOL WHEN NOTIFIED AS APPARENT LOW BIDDER. SEE REFERENCE DOCUMENTS LISTED IN INSTRUCTIONS TO BIDDERS. CONTRACTOR SHALL PROVIDE QUALITIFCATIONS AT TIME OF BID. SEE REFERENCE DOCUMENTS 00 20 00 SECTION 21
10/27/2021 07:00 PM UTC
P697-19612 - Oak Leaf Trail Relocation Site #716
Project Funded: Federally Funded with Transportation Alternatives Program. Contract 1: Shared-Use Path Construction Work consists of reconstructing and relocating two segments of Milwaukee County’s Oak Leaf Trail located within the Little Menomonee Parkway, specifically on the west side of N 91st St between W. Good Hope Rd and W. Bradley Rd. Project work includes earthwork grading, removing asphalt, providing new asphalt surface, clearing and grubbing, and native seeding. Project Completion: Interim Completion of Asphalt Paving Work by November 19, 2021 or June 24th, 2022 pending weather, construction timing, and contractor option. Final Turf Restoration and Project Substantial Completion July 15th, 2022. Disadvantaged Business Enterprise (DBE) participation goal for this project is 15%.
10/20/2021 07:00 PM UTC
5300-20144 Central Fleet Maintenance HVAC Replacement (Bid Date Extended)
Replace existing VRF cooling with new chilled water cooling along with existing hot water heating along with single DDC controls for complete HVAC system Project Completion/ Substantial Completion Date/Calendar Days: 150 Days (Mandatory) Pre-Bid Meeting: 10:00 AM on 9/29/2021 in lobby of Central Fleet Maintenance at 10320 W. Watertown Plank Road, Wauwatosa, WI. 53226.
10/20/2021 07:00 PM UTC
5300-20144 Central Fleet Maintenance HVAC Replacement
Replace existing VRF cooling with new chilled water cooling along with existing hot water heating along with single DDC controls for complete HVAC system Project Completion/ Substantial Completion Date/Calendar Days: 150 Days (Mandatory) Pre-Bid Meeting: 10:00 AM on 9/29/2021 in lobby of Central Fleet Maintenance at 10320 W. Watertown Plank Road, Wauwatosa, WI. 53226.
10/13/2021 07:00 PM UTC
5041-21402-03 Time & Material (MKE) General Mitchell International Airport REBID
Contract 3: Carpet & Resilient Flooring. Bids are to be completed online in Bid Express internet Bidding System at https://www.bidexpress.com/businesses/24937/home no later than 2 P.M., September 29, 2021.
09/29/2021 07:00 PM UTC
P698-19613 GREENFIELD PARK OAK LEAF TRAIL CONSTRUCTION
Project Funded: Federally Funded with Transportation Alternatives Program. Contract 1: Trail Construction Work of the Project consists of removing existing asphalt surface and providing new asphalt surface, culvert pipe and trail signs as indicated in the project Bid documents. Project Completion: Work of the project shall be Substantially Complete as follows: Construction of the project shall begin on or after 10/11/2021 and shall be substantially completed by 11/19/2021. Final turf restoration shall be completed by 6/3/2022. Prime contractor shall perform at least 30 percent of the original contract amount with contractor’s own organization per section 108.1.2 of the current edition of the WisDOT standard specifications for highway and structure construction. See Project Manual Invitation to Bid. Contractor shall complete the Affidavit of Non-Collusion that is part of the Bid Form confirming that the bidder has not engaged in any collusion related to the bidding of the project. Bids are to be completed online in Bid Express no later than 2 P.M., September 15, 2021. Milwaukee County project bid summary results will be posted on the Bid Express site and Milwaukee County web site at www.county.milwaukee.gov. Bid summary results may be available a few days following the Bid Due Date time.
09/15/2021 07:00 PM UTC
6533-21400-01 -2021Time & Material (MKE) Behavior Health Divison
Contract 1: General Construction
09/08/2021 07:00 PM UTC
6533-21400-02 -2021Time & Material (MKE) Behavior Health Divison
Contract 2: Plumbing
09/08/2021 07:00 PM UTC
6533-21400-03 -2021Time & Material (MKE) Behavior Health Divison
Contract 3: Fire Protection
09/08/2021 07:00 PM UTC
6533-21400-04 -2021Time & Material (MKE) Behavior Health Division
Contract 4: Heating & Ventilating
09/08/2021 07:00 PM UTC
171 - 180 of 295 Solicitations