General Info

Business Logo

Milwaukee County

633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4953

Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
WY045606 Milwaukee County Department of Health & Human Services New Administration Building Bid Package #3 - Site and Parking Lots
Milwaukee County Department of Health & Human Services New Administration Building Bid Package #3 - Site and Parking Lots. PreBid Meeting: Rescheduled, now Tuesday, June 11 at 9:00 a.m at Coggs Building, Conference Room 104.
06/27/2024 07:00 PM UTC
WY012306 Parkway Drive Conversion to Bicycle & Pedestrian Trail
Milwaukee County will be converting existing Asphalt Roadways within the Lincoln Creek Parkway (from N.23rd Street to N.27th Street) and Little Menomonee River Parkway (From Appleton Avenue to Leon Terrace) to a pedestrian pathway/trail. Existing asphalt and concrete pavement, concrete curb and gutter, will be removed and replaced with a 10-foot-wide asphalt path with gravel shoulders. Proposed storm sewer culverts, structures, and piping will be installed at low points. Existing storm structures will remain with minor adjustments. Landscaping trees, turf grass restoration, bollards, stone barriers, pedestrian and bicycle trail signage will be installed as part of the project. Traffic control will be required at project locations. Pre Bid Meeting June 18, at 2:00 p.m. via Microsoft Teams - see advertisement for link
07/10/2024 07:00 PM UTC
C217-20206 Milwaukee County Courthouse Phase 3 Facade Repair
Courthouse Limestone Façade Repair – phase 3 encompasses the following base-bid work: Area of Work 1: East Elevation Complete façade repairs as shown on sheets A202-A204 and as designated during inspections by consultant/owner. Area of Work 2: (Low) East Entrances Rebuild/replace stone at East building Entrances. Refer to sheets A203 and A301. Area of Work 3: South Elevation Complete façade repairs as shown on sheet A205 and as designated during inspections by consultant/owner. Replace built-in copper gutter at sixth-floor cornice. Refer to sheet A205. Refer to photo no. 1 on sheet A501. Deductive Alternate No. 1: Deduction to base bid all associated costs included in Area of Work 2. Alternate A: East and South Elevation Cleaning Clean East and South Elevations 100% below fourth floor water table. Alternate B: 100% Façade Cleaning Clean 100% of the Limestone Facades at all Elevations. MANDATORY Pre-Bid Meeting June 21st, 2024, at 11:00 AM.- This will be a Virtual Teams Meeting – See Bid Documents for Meeting Link information. OPTIONAL Site Visit Tour June 24th, 2024 at 10:00 AM. Tour information available on Addendum One.
07/10/2024 09:00 PM UTC
WA0221 MKE International Terminal Redevelopment - BP1 (Demolition)
This project includes the demolition of the existing Concourse E at MKE Airport and the construction of a new International Terminal Building that will be attached the main terminal building. Work includes site work, excavation, demolition, construction, fueling system work, and installation of passenger boarding bridges. Work will be divided up into four different Bid Packages. Pre bid meeting dates and times for the different Bid Packages (BP’s) are as follows: General (All Bid Packages): Thursday, 6/27/24: 9:00 AM (60 Min) BP 2 (New Concourse E): Thursday, 6/27/24: 11:00 AM (90 Min) BP 1 (Demolition): Friday, 6/28/24: 10:00 AM (60 Min) BP 3 (Fueling): Friday, 6/28/24: 11:15 AM (45 Min) BP 4 (Boarding Bridges): Friday, 6/28/24: 1:00 PM (45 Min) All pre-bid meetings will be done virtually via Teams. To acquire the meeting link to any or all the pre bid meetings, please contact James Hart at jhart@mitchellairport.com prior to Wednesday, June 26, 2024 at 5:00PM. Later requests are not guaranteed a timely response. Pre-bid site visits will be in person and provided as follows: BP 1 (Demolition): Tuesday, 7/9/24: 8:30 AM (90 Min) BP 2 (New Concourse E): Tuesday, 7/9/24: 10:30 AM (90 Min) BP 3 (Fueling) & Bid Package 4 (Boarding Bridges): Tuesday, 7/9/24: 12:45 AM (60 Min) To register anticipated attendance for site visit(s), please contact James Hart at jhart@mitchellairport.com prior to Monday, July 8, 2024 at 2:00PM. Later requests are not guaranteed access. Attendees will go through security screening; Driver’s license is required. To bid on either Bid Package 1 or 2, the site visit is MANDATORY for Prime Contractors. Reasonable requests for additional site visits will be considered at Milwaukee County’s discretion.
07/25/2024 07:00 PM UTC
WA0221 MKE International Terminal Redevelopment - BP2 (New Concourse E)
This project includes the demolition of the existing Concourse E at MKE Airport and the construction of a new International Terminal Building that will be attached the main terminal building. Work includes site work, excavation, demolition, construction, fueling system work, and installation of passenger boarding bridges. Work will be divided up into four different Bid Packages. Pre bid meeting dates and times for the different Bid Packages (BP’s) are as follows: General (All Bid Packages): Thursday, 6/27/24: 9:00 AM (60 Min) BP 2 (New Concourse E): Thursday, 6/27/24: 11:00 AM (90 Min) BP 1 (Demolition): Friday, 6/28/24: 10:00 AM (60 Min) BP 3 (Fueling): Friday, 6/28/24: 11:15 AM (45 Min) BP 4 (Boarding Bridges): Friday, 6/28/24: 1:00 PM (45 Min) All pre-bid meetings will be done virtually via Teams. To acquire the meeting link to any or all the pre bid meetings, please contact James Hart at jhart@mitchellairport.com prior to Wednesday, June 26, 2024 at 5:00PM. Later requests are not guaranteed a timely response. Pre-bid site visits will be in person and provided as follows: BP 1 (Demolition): Tuesday, 7/9/24: 8:30 AM (90 Min) BP 2 (New Concourse E): Tuesday, 7/9/24: 10:30 AM (90 Min) BP 3 (Fueling) & Bid Package 4 (Boarding Bridges): Tuesday, 7/9/24: 12:45 AM (60 Min) To register anticipated attendance for site visit(s), please contact James Hart at jhart@mitchellairport.com prior to Monday, July 8, 2024 at 2:00PM. Later requests are not guaranteed access. Attendees will go through security screening; Driver’s license is required. To bid on either Bid Package 1 or 2, the site visit is MANDATORY for Prime Contractors. Reasonable requests for additional site visits will be considered at Milwaukee County’s discretion.
07/25/2024 07:00 PM UTC
WA0221 MKE International Terminal Redevelopment - BP3 (Fueling)
This project includes the demolition of the existing Concourse E at MKE Airport and the construction of a new International Terminal Building that will be attached the main terminal building. Work includes site work, excavation, demolition, construction, fueling system work, and installation of passenger boarding bridges. Work will be divided up into four different Bid Packages. Pre bid meeting dates and times for the different Bid Packages (BP’s) are as follows: General (All Bid Packages): Thursday, 6/27/24: 9:00 AM (60 Min) BP 2 (New Concourse E): Thursday, 6/27/24: 11:00 AM (90 Min) BP 1 (Demolition): Friday, 6/28/24: 10:00 AM (60 Min) BP 3 (Fueling): Friday, 6/28/24: 11:15 AM (45 Min) BP 4 (Boarding Bridges): Friday, 6/28/24: 1:00 PM (45 Min) All pre-bid meetings will be done virtually via Teams. To acquire the meeting link to any or all the pre bid meetings, please contact James Hart at jhart@mitchellairport.com prior to Wednesday, June 26, 2024 at 5:00PM. Later requests are not guaranteed a timely response. Pre-bid site visits will be in person and provided as follows: BP 1 (Demolition): Tuesday, 7/9/24: 8:30 AM (90 Min) BP 2 (New Concourse E): Tuesday, 7/9/24: 10:30 AM (90 Min) BP 3 (Fueling) & Bid Package 4 (Boarding Bridges): Tuesday, 7/9/24: 12:45 AM (60 Min) To register anticipated attendance for site visit(s), please contact James Hart at jhart@mitchellairport.com prior to Monday, July 8, 2024 at 2:00PM. Later requests are not guaranteed access. Attendees will go through security screening; Driver’s license is required. To bid on either Bid Package 1 or 2, the site visit is MANDATORY for Prime Contractors. Reasonable requests for additional site visits will be considered at Milwaukee County’s discretion.
07/25/2024 07:00 PM UTC
WA0221 MKE International Terminal Redevelopment - BP4 (Boarding Bridges)
This project includes the demolition of the existing Concourse E at MKE Airport and the construction of a new International Terminal Building that will be attached the main terminal building. Work includes site work, excavation, demolition, construction, fueling system work, and installation of passenger boarding bridges. Work will be divided up into four different Bid Packages. Pre bid meeting dates and times for the different Bid Packages (BP’s) are as follows: General (All Bid Packages): Thursday, 6/27/24: 9:00 AM (60 Min) BP 2 (New Concourse E): Thursday, 6/27/24: 11:00 AM (90 Min) BP 1 (Demolition): Friday, 6/28/24: 10:00 AM (60 Min) BP 3 (Fueling): Friday, 6/28/24: 11:15 AM (45 Min) BP 4 (Boarding Bridges): Friday, 6/28/24: 1:00 PM (45 Min) All pre-bid meetings will be done virtually via Teams. To acquire the meeting link to any or all the pre bid meetings, please contact James Hart at jhart@mitchellairport.com prior to Wednesday, June 26, 2024 at 5:00PM. Later requests are not guaranteed a timely response. Pre-bid site visits will be in person and provided as follows: BP 1 (Demolition): Tuesday, 7/9/24: 8:30 AM (90 Min) BP 2 (New Concourse E): Tuesday, 7/9/24: 10:30 AM (90 Min) BP 3 (Fueling) & Bid Package 4 (Boarding Bridges): Tuesday, 7/9/24: 12:45 AM (60 Min) To register anticipated attendance for site visit(s), please contact James Hart at jhart@mitchellairport.com prior to Monday, July 8, 2024 at 2:00PM. Later requests are not guaranteed access. Attendees will go through security screening; Driver’s license is required. To bid on either Bid Package 1 or 2, the site visit is MANDATORY for Prime Contractors. Reasonable requests for additional site visits will be considered at Milwaukee County’s discretion.
07/25/2024 07:00 PM UTC
WO517-16436 -WAR MEMORIAL CENTER LOWER-LEVEL RESTROOMS
Contract Description: Demolition of existing restrooms and south doors, construction of new restrooms, locker room, storage area and entry. Pre-Bid Meeting: July 1, 2024, at 9am. Meet at the Lower Level, North entry, in the lobby in front of the help desk.
08/02/2024 09:00 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
9420-20580 - Little Menomonee River Parkway Habitat Restoration: Sections 4 and 5
Habitat restoration within the Little Menomonee River Parkway including reforestation, invasive species removal, grassland restoration and management, forest stand improvement, wetland restoration and sedge meadow restoration. Project is funded by a Great Lakes Restoration Initiative Grant sub-granted through the Department of Natural Resources to Milwaukee County Parks. Pre-Bid Meeting: One Pre-bid meeting will take place on October 13, 2021 at 1:00PM. Meeting will be held virtually via Microsoft Teams. Email Project Manager, Natalie Dutack at Natalie.Dutack@milwaukeecountywi.govfor a link to the meeting. CONTRACTOR SHALL PROVIDE WRITTEN PROJECT BID SUBMITTAL OF COVID-19 SAFETY PROTOCOL WHEN NOTIFIED AS APPARENT LOW BIDDER. SEE REFERENCE DOCUMENTS LISTED IN INSTRUCTIONS TO BIDDERS. CONTRACTOR SHALL PROVIDE QUALITIFCATIONS AT TIME OF BID. SEE REFERENCE DOCUMENTS 00 20 00 SECTION 21
10/27/2021 07:00 PM UTC
P697-19612 - Oak Leaf Trail Relocation Site #716
Project Funded: Federally Funded with Transportation Alternatives Program. Contract 1: Shared-Use Path Construction Work consists of reconstructing and relocating two segments of Milwaukee County’s Oak Leaf Trail located within the Little Menomonee Parkway, specifically on the west side of N 91st St between W. Good Hope Rd and W. Bradley Rd. Project work includes earthwork grading, removing asphalt, providing new asphalt surface, clearing and grubbing, and native seeding. Project Completion: Interim Completion of Asphalt Paving Work by November 19, 2021 or June 24th, 2022 pending weather, construction timing, and contractor option. Final Turf Restoration and Project Substantial Completion July 15th, 2022. Disadvantaged Business Enterprise (DBE) participation goal for this project is 15%.
10/20/2021 07:00 PM UTC
5300-20144 Central Fleet Maintenance HVAC Replacement (Bid Date Extended)
Replace existing VRF cooling with new chilled water cooling along with existing hot water heating along with single DDC controls for complete HVAC system Project Completion/ Substantial Completion Date/Calendar Days: 150 Days (Mandatory) Pre-Bid Meeting: 10:00 AM on 9/29/2021 in lobby of Central Fleet Maintenance at 10320 W. Watertown Plank Road, Wauwatosa, WI. 53226.
10/20/2021 07:00 PM UTC
5300-20144 Central Fleet Maintenance HVAC Replacement
Replace existing VRF cooling with new chilled water cooling along with existing hot water heating along with single DDC controls for complete HVAC system Project Completion/ Substantial Completion Date/Calendar Days: 150 Days (Mandatory) Pre-Bid Meeting: 10:00 AM on 9/29/2021 in lobby of Central Fleet Maintenance at 10320 W. Watertown Plank Road, Wauwatosa, WI. 53226.
10/13/2021 07:00 PM UTC
5041-21402-03 Time & Material (MKE) General Mitchell International Airport REBID
Contract 3: Carpet & Resilient Flooring. Bids are to be completed online in Bid Express internet Bidding System at https://www.bidexpress.com/businesses/24937/home no later than 2 P.M., September 29, 2021.
09/29/2021 07:00 PM UTC
P698-19613 GREENFIELD PARK OAK LEAF TRAIL CONSTRUCTION
Project Funded: Federally Funded with Transportation Alternatives Program. Contract 1: Trail Construction Work of the Project consists of removing existing asphalt surface and providing new asphalt surface, culvert pipe and trail signs as indicated in the project Bid documents. Project Completion: Work of the project shall be Substantially Complete as follows: Construction of the project shall begin on or after 10/11/2021 and shall be substantially completed by 11/19/2021. Final turf restoration shall be completed by 6/3/2022. Prime contractor shall perform at least 30 percent of the original contract amount with contractor’s own organization per section 108.1.2 of the current edition of the WisDOT standard specifications for highway and structure construction. See Project Manual Invitation to Bid. Contractor shall complete the Affidavit of Non-Collusion that is part of the Bid Form confirming that the bidder has not engaged in any collusion related to the bidding of the project. Bids are to be completed online in Bid Express no later than 2 P.M., September 15, 2021. Milwaukee County project bid summary results will be posted on the Bid Express site and Milwaukee County web site at www.county.milwaukee.gov. Bid summary results may be available a few days following the Bid Due Date time.
09/15/2021 07:00 PM UTC
6533-21400-01 -2021Time & Material (MKE) Behavior Health Divison
Contract 1: General Construction
09/08/2021 07:00 PM UTC
6533-21400-02 -2021Time & Material (MKE) Behavior Health Divison
Contract 2: Plumbing
09/08/2021 07:00 PM UTC
6533-21400-03 -2021Time & Material (MKE) Behavior Health Divison
Contract 3: Fire Protection
09/08/2021 07:00 PM UTC
6533-21400-04 -2021Time & Material (MKE) Behavior Health Division
Contract 4: Heating & Ventilating
09/08/2021 07:00 PM UTC
131 - 140 of 255 Solicitations
1 2 10 11 12 14 16 17 18 25 26