The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
| 10/01/2026 06:00 PM UTC |
|
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
| 10/01/2026 06:00 PM UTC |
|
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included.
All noisy work is to occur after normal operating hours.
| 10/06/2026 06:00 PM UTC |
|
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms
670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
| 10/08/2026 06:00 PM UTC |
|
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
| 10/12/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-250047 Chiller Renewal FY25-26
Aronoff Lab – Replace existing 70 ton chiller in ground floor mechanical room and remote condensing unit on roof. Replace existing chiller pump and provide new redundant chiller pump. Replace existing refrigerant monitoring system.
Hagerty Hall – Replace two existing 220 Ton water cooled chillers located in the 5th floor penthouse. Replace refrigerant monitoring sensors and associated programming.
| 09/24/2026 06:00 PM UTC |
|
OSU-265500, East Hospital - Talbot Hall - Sleep Lab Support Space Renovation REBID
A renovation to add two restrooms and a staff kitchenette to the existing sleep lab suite. There are minor fire alarm additions to the existing caretaker rooms as well.
| 09/24/2026 06:00 PM UTC |
|
OSU-230429, Lima - Galvin Phase 2 Renovation Floor 3
OSU Lima Campus: The project will include an interior alteration + renovate approximately 190 SF at the basement level to replace the fire pump, 845 SF of the first floor southeast and southwest vestibule storefront system, ceilings and exterior soffit metal panel replacement, 592 SF (3) third floor toilet rooms with new finishes and plumbing fixtures. (4) fourth floor combining both existing facility toilet rooms to create a family accessible toilet room with an adult changing table.
| 09/22/2026 06:00 PM UTC |
|
OSU-265500, East Hospital - Talbot Hall - Sleep Lab Support Space Renovation
A renovation to add two restrooms and a staff kitchenette to the existing sleep lab suite. There are minor fire alarm additions to the existing caretaker rooms as well.
| 09/09/2026 06:00 PM UTC |
|
OSU-260012, Hopkins and Hayes - Rm Renovations
OSU Columbus Campus: Minor demolition, new partitions, mechanical and electrical modifications, new lighting, new ceiling, floor and wall finishes, and refurbishment of existing floors in Room 304 of Hayes Hall and Rooms 162, 262, and 358 of Hopkins Hall and other Work indicated in the Contract Documents.
| 09/09/2026 06:00 PM UTC |
|
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement
Ohio State University Fuel Tank and Dispensing Infrastructure Replacement: Replace underground storage tanks and dispensers
| 09/03/2026 06:00 PM UTC |
|
OSU-255632, JCSMI Rehab Clinic Expansion
OSU Columbus Campus: This project includes the partial renovation of the third floor of the Jameson Crane Sports Medicine Institute (JCSMI). The overall intent of the project is to create additional rehabilitation space for the facility through the relocation of an existing waiting room to the existing elevator lobby. Work includes but is not limited to the relocation of the existing wood and solid surface reception desk, selective demolition, new wall Construction, finishes, HVAC, Electrical, Technology and Fire Protection. Refer to the architectural drawings for the only approved OSU millwork vendor who is to be contracted to perform the relocation of the reception desk. Relocation work will be under this contract.
| 09/03/2026 06:00 PM UTC |
|
OSU-250050 Marion - Morrill Hall Fire Panel/Elevator Upgrades
Fire alarm and elevator upgrades within Morrill Hall at the OSU Marion campus.
| 08/26/2026 06:00 PM UTC |
|
OSU-250014 Lima - Life and Physical Science Bldg Safety Renovation
• Recover of roof system with insulation and EPDM
membrane.
• Selective replacement of damaged, wet, or deteriorated
insulations.
• Replacement of edge metals.
• Lightening protection replacement.
• Fire alarm panel replacement.
• Fire pump controller replacement (alternate)
| 08/26/2026 06:00 PM UTC |
|
OSU-230499 Tunnel Rehabilitation Phase I BP-3
The project consists of the removal and replacement of the South Neil tunnel roof, removal of abandoned utilities, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct new steam and condensate and chilled water supply and return lines within the South Neil Tunnel. Direct buried chilled water lines will also be installed under this scope.
| 08/20/2026 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.