General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-210742, Arps - Masonry & Parapet
OSU Columbus Campus: Masonry wall repairs and low-slope roof replacement for Arps Hall.
04/06/2026 06:00 PM UTC
OSU-250040 Fire Systems Renovations - FY25-26
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
04/08/2026 06:00 PM UTC
OSU-255631, Morehouse Medical Plaza - Concourse - Medical Gas Enclosure and Upgrade
This project entails the addition of a new dedicated medical gas storage enclosure at the facility to safely house increased medical oxygen cylinder capacity in compliance with NFPA 99 standards, featuring secure noncombustible construction, proper ventilation, cylinder restraints, and required safety signage. The scope includes installation of additional medical oxygen drops in targeted patient care areas via new copper piping, zone valves, and alarm integrations, along with the strategic relocation of existing medical gas equipment to optimize accessibility, maintenance, and system redundancy. All work will involve phased implementation to minimize disruptions, full system purging, pressure testing, third party certification, and verification to ensure code-compliant, safe, and reliable medical gas delivery supporting current operations and future facility expansion.
04/10/2026 06:00 PM UTC
OSU-250039 Elevator Renovations - FY 25-26
Elevator Modernization and related architectural and MEP scopes of work at Pressey Hall on OSU’s Main Campus.
04/16/2026 06:02 PM UTC
OSU-230102 Roof Renewal FY23-24 BP 1
Work includes roof replacements on Agriculture Administration or “Ag Admin”, located at The Ohio State University Columbus Campus in Columbus, Ohio
04/23/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-260006 - Ohio Stadium - Heat Trace to Piping (Phase 3)
This project will install heat trace to existing storm and sanitary piping within the Ohio Stadium.
10/01/2025 06:00 PM UTC
OSU-240082, James - Pharmacy Administration Renovation (C150, C150A through C150F, C150X)
The project is the renovation of an existing open office into enclosed office in the administrative suite. The area of construction is approximately 1,500 square feet. The work consists of the removal of flooring and ceiling grid and tiles and the associated fire protection, mechanical, and electrical systems. The new work will consist of creating eight private offices and two general work areas. The new work will entail new partitions, doors and frames, ceilings, finishes in the new OSUWMC finish standards, and the associated mechanical, electrical, and fire protection systems
09/30/2025 06:00 PM UTC
OSU-230104, Elevator Repairs and Replacements FT23-24
Elevator Modernizations of 2 elevators in 2 buildings, with an alternate for a third elevator in a separate building.
09/23/2025 06:00 PM UTC
OSU-230480 FOD Training Center Build Out
Project will build a FOD training facility within the existing building at 1165 Kinnear Rd.
09/22/2025 06:00 PM UTC
OSU-250021 Wexner Center for the Arts Exterior Pavers
The project consists of the construction of two walkways leading to the Wexner Center for the Arts building with buff wash concrete, from College Road South to the building and from Annie and John Glenn Avenue to the building. The area immediately adjacent to the building entrance will be upgraded with high-quality granite paver. All storm drains in the project area will be replaced with new ones to facilitate stormwater runoff.
09/12/2025 06:00 PM UTC
OSU-230033, Marion - Various Campus Upgrades (Rebid)
OSU Marion Campus: One-for-one replacement of two existing gas-fired boilers and associated components as indicated in the bid documents.
09/10/2025 06:00 PM UTC
OSU-220298, Lima - Reed Hall Theatre Upgrades
OSU Lima Campus: The Project consists of the construction of 4,000 SF interior renovation of the existing theatre in Reed Hall (4276 Campus Drive- Lima, Ohio 45804). The renovation includes refinishing the existing ceiling and upgrades to lighting and mechanical systems
09/03/2025 06:00 PM UTC
OSU-250012 - Fawcett Center - Walk-in Cooler Freezer Replacement
This project will replace the freezer and coolers on the first floor of the Fawcett Center.
08/21/2025 06:00 PM UTC
OSU-230844 - Newark - Evans Hall Renovation
This project includes additions and renovations for the COTC Public Training Facility. Renovations include new classrooms, office and restrooms, HVAC replacement, exterior wall enhancements, new doors and windows and new finishes throughout. Additions include a new secure entry vestibule. New parking and landscaping are included as part of the sitework.
08/07/2025 06:00 PM UTC
OSU 240639 Outpatient East New West Parking Lot Bid Package 1
This project will add a new parking lot to the west of the facility.
08/01/2025 06:00 PM UTC
31 - 40 of 608 Solicitations
1 2 4 6 7 8 9 60 61