OSU-250046 Evans Lab 1969 Addition Demolition
Complete demolition of north wing of Evans Lab, the 1969 (northern most) addition of the facility. The remaining site will become temporary green space. Utilities serving adjacent wings will be maintained, including but not limited to natural gas, heating and domestic hot water, steam, domestic cold water, electric, fire alarm and ERRCS systems, and will be capped/terminated at appropriate locations to allow for re-use in subsequent project phases. A metal panel wall enclosure and interior hollow metal doors will be added to the remaining facility.
05/21/2026 06:00 PM UTC
OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26 SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory. PVC Membrane Roof Replacement at Independence Hall. Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
05/22/2026 06:00 PM UTC
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
05/28/2026 06:00 PM UTC
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
06/05/2026 06:00 PM UTC
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
06/09/2026 06:00 PM UTC
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
06/18/2026 05:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OSU-230758 Masonry Wall Repair Brick Veneer REBID
Masonry Wall Repair – Brick Veneer: The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
12/02/2025 07:00 PM UTC
OSU-240249, Outpatient East - Existing Lot Renovation
OSU Outpatient East: The project includes renovation of the existing parking on the east side of the hospital. Improvements include larger drive isles, parking spaces, access off of Taylor Avenue, and various curb, sidewalk, lighting, landscape, and utility improvements. Includes work within the R/W along Taylor Ave and Leonard Ave.
11/20/2025 07:00 PM UTC
OSU-230105 Fire System Renovations FY23 24 BP 01
This project is a fire alarm upgrade at Orton Hall and 1315 Kinnear Rd. The project includes the installation of a new addressable / programmable ADA compliant voice fire alarm system in each building. The systems will include all new panels, devices, pathways and wiring. The existing fire alarms systems in each building will be removed completely. Each building will be provided with a new DAS-ERRS system.
11/19/2025 07:00 PM UTC
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall, 209 Maintenance Building, and ElectroScience Laboratory. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes an Alternate which involves the removal and replacement of domestic cold water lines at Plumb Hall.
11/14/2025 07:00 PM UTC
OSU-240366, Outpatient NA - New Women's Imaging Clinic
Renovation of Outpatient Care New Albany second floor overflow waiting area to provide Women’s Imaging Clinic.
11/12/2025 07:00 PM UTC
OSU-240250, Outpatient East - 3rd Floor Space Refresh
Outpatient Care East is a three-story outpatient facility on Taylor Ave in Columbus, OH. This project will refresh the 3rd floor common spaces, 3rd floor public bathrooms, and Suite 3068. This project will refresh the common hallways, the lobby, suite 3068, and other spaces by updating finishes and replacing existing lighting with new LED fixtures. It will also refresh the public bathrooms by updating the finishes and updating the existing fixtures.
10/31/2025 06:00 PM UTC
OSU-230110 Infrastructure Renewal FY 23 24
The project includes concrete pavement replacement along the two Westernmost lanes of Carmack Road and asphalt pavement mill and overlay at intersecting drive aprons. Also included is the partial sidewalk removal and rebuild of curb ramp on the West side of Carmack Road.
10/30/2025 06:00 PM UTC
OSU-230105 Fire System Renovations FY23 24 BP 02
This project is a fire alarm upgrade at the Bio Science building. The project includes the replacement of the main fire alarm control panel in the same location as the existing and replacement of all fire alarm initiation devices in the same locations as the existing. Existing rough-ins and wiring will be reused. The operation of the fire alarm system will be restored to pre-construction condition.
10/24/2025 06:00 PM UTC
OSU-250252, Outpatient Dublin & New Albany - Bollard Replacement
The project includes removal and replacement of detectable warnings, concrete and bollards at Outpatient Dublin & Outpatient New Albany.
10/22/2025 06:00 PM UTC
OSU-220524, McCampbell - OBGYN Renovation
Alterations to 4th Floor OBGYN Clinic including, millwork, painting, electrical and technology.
10/16/2025 06:00 PM UTC