General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
12/17/2025 07:00 PM UTC
OSU-240045, James Care East Refresh
This project will update finishes on the 14th Floor of the OSU East hospital for the James Care East clinic. Updates include ceiling, flooring, and wall finishes. Improvements also include reconfiguration of infusion spaces and ADA upgrades.
12/19/2025 07:00 PM UTC
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24 REBID
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall and 209 Maintenance Building. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes two alternates which involve the removal and replacement of domestic cold water lines at Electroscience Laboratory and Plumb Hall.
12/22/2025 07:00 PM UTC
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
01/05/2026 07:00 PM UTC
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
01/12/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-230033, Marion - Various Campus Upgrades (Rebid)
OSU Marion Campus: One-for-one replacement of two existing gas-fired boilers and associated components as indicated in the bid documents.
09/10/2025 06:00 PM UTC
OSU-220298, Lima - Reed Hall Theatre Upgrades
OSU Lima Campus: The Project consists of the construction of 4,000 SF interior renovation of the existing theatre in Reed Hall (4276 Campus Drive- Lima, Ohio 45804). The renovation includes refinishing the existing ceiling and upgrades to lighting and mechanical systems
09/03/2025 06:00 PM UTC
OSU-250012 - Fawcett Center - Walk-in Cooler Freezer Replacement
This project will replace the freezer and coolers on the first floor of the Fawcett Center.
08/21/2025 06:00 PM UTC
OSU-230844 - Newark - Evans Hall Renovation
This project includes additions and renovations for the COTC Public Training Facility. Renovations include new classrooms, office and restrooms, HVAC replacement, exterior wall enhancements, new doors and windows and new finishes throughout. Additions include a new secure entry vestibule. New parking and landscaping are included as part of the sitework.
08/07/2025 06:00 PM UTC
OSU 240639 Outpatient East New West Parking Lot Bid Package 1
This project will add a new parking lot to the west of the facility.
08/01/2025 06:00 PM UTC
OSU-230033, Marion - Various Campus Upgrades
OSU Marion Campus: Project consists of one-for-one replacement of two gas-fired boiler units and associated equipment on the third floor of Morrill Hall, a classroom and administrative building, on the Marion campus of The Ohio State University.
07/22/2025 06:00 PM UTC
OSU-240463, Mason Hall - 1st Floor Business Lab
Reconfiguration of existing offices and classrooms into a new classroom. Scope of work will include new partitions, new finishes, and adjustments to existing finishes. Removal of an existing connecting stair will require new structural steel framing and new concrete slab to close the existing opening. Existing sprinkler heads, fire alarm, mechanical devices, and electrical receptacles will be adjusted and modified to accommodate new uses.
07/17/2025 06:00 PM UTC
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
06/17/2025 06:00 PM UTC
OSU-250017 - Newark - Lefevre Hall Chiller and Cooling Tower Replacement
This project will replace the existing water-cooled chiller with a new water-cooled chiller and replace the existing cooling tower
06/12/2025 06:00 PM UTC
OSU-250053 - Newark - Pavement Improvements
The project includes pavement mill & overlay to address deferred maintenance of shared parking lots and roadways throughout the college campus in Newark, Ohio.
05/27/2025 06:00 PM UTC
21 - 30 of 593 Solicitations
1 3 5 6 7 8 9 59 60