Upcoming Solicitations

Number Deadline
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
12/17/2025 07:00 PM UTC
OSU-240045, James Care East Refresh
This project will update finishes on the 14th Floor of the OSU East hospital for the James Care East clinic. Updates include ceiling, flooring, and wall finishes. Improvements also include reconfiguration of infusion spaces and ADA upgrades.
12/19/2025 07:00 PM UTC
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24 REBID
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall and 209 Maintenance Building. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes two alternates which involve the removal and replacement of domestic cold water lines at Electroscience Laboratory and Plumb Hall.
12/22/2025 07:00 PM UTC
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
01/05/2026 07:00 PM UTC
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
01/12/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
Project OSU-230111 Road/Bridge Renewal FY23/24 RB 4
The planned scope of work includes rehabilitation of two bridges on The Ohio State University’s Main Campus: Woody Hayes over Olentangy River Road, Woody Hayes over Olentangy River. Maintenance level repairs generally include concrete patching/repairs, concrete walk repairs/replacement, joint and crack sealing, and deck sealing and repairs.
12/11/2024 07:00 PM UTC
OSU-230499 Tunnel Rehabilitation Phase I BP 2
The project consists of the removal and replacement of the North McCracken tunnel roof, the complete removal of the North McCracken tunnel bypass, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct a new steam line within the North McCracken Tunnel. Under the Alternate 1 scope of work, a new water main will be constructed from the east end of the Oval to the west end and then up to the Cockins/Dulles loading dock area. The Alternate 2 scope of work provides alternate restoration methods to the North Oval Mall.
12/06/2024 06:00 PM UTC
OSU-240260, Newton - Lab Renovations
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
12/05/2024 07:00 PM UTC
OSU-250002 - Ohio Stadium - Heat Trace to Piping (Phase 2)
This project is to add new heat trace to existing Ohio Stadium piping.
11/20/2024 07:00 PM UTC
OSU-221019, Pressey - 90/92 ULAR Expansion
1. INTERIOR PROJECT TO CONVERT AN EXISTING COMMON SPACE AT THE LOWER LEVEL OF PRESSEY HALL INTO TWO NEW ANIMAL HOLDING ROOMS. 2. THE TWO NEW HOLDING ROOMS WILL BE SERVED BY AN EXPANDED HVAC SYSTEM, LOCAL FIRE-PROTECTION SYSTEM, AND ANIMAL WATERING SYSTEM. ELECTRICAL CONNECTIONS WILL BE MADE BACK TO EXISTING PANELS.
11/15/2024 07:00 PM UTC
OSU-230109 Emergency Generator Replacement FY23 24
Replace existing diesel generator with new diesel generator and separate electrical distribution system into life safety, stand-by, and fire pump in accordance with NEC. The generator, and diesel day tank shall be located interior to the building with a remote radiator. Demolition of abandoned equipment will be required for installation of new generator.
10/31/2024 05:00 PM UTC
OSU-240566 - Molecular Microbiology Lab Renovation
This project includes the renovation of two vacant laboratory rooms into space for a new molecular microbiology lab. Work includes but is not limited to demolition, access controls, finishes, plumbing, HVAC, Electrical, Technology and Fire Protection. This project will be constructed in multiple phases
10/30/2024 06:00 PM UTC
OSU-230107 Electrical Renovation FY 23-24 BP#2
Replace main electrical distribution equipment in The Ohio State University’s Cockins Hall.
10/30/2024 05:00 PM UTC
OSU-240495 - Airport - Runway 9R/27L Drainage Improvements
This project involves the installation of HDPE culvert pipes and other stormwater structures on both ends of Runway 9/27.n
10/17/2024 06:00 PM UTC
OSU-240566, Molecular Microbiology Lab Renovation
This project includes the renovation of two vacant laboratory rooms into space for a new molecular microbiology lab. Work includes but is not limited to demolition, access controls, finishes, plumbing, HVAC, Electrical, Technology and Fire Protection. This project will be constructed in multiple phases.
10/11/2024 06:00 PM UTC