General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240175, Research Admin Bldg - 4th Floor Renovation
Project consists of an interior renovation of approximately 10,466 SF of the 4th floor including minor demolition, construction of new interior partitions, new ceiling grid and tile, new doors, new finishes, associated mechanical, electrical, plumbing and fire protection work. An accessible restroom is being added to the floor. A break area will also be added with associated plumbing, casework and fixtures.
11/19/2026 07:00 PM UTC
OSU-255058, James Hospital D232A Brachytherapy CT Replacement
This project will install a new Siemens CT-on-rails in an existing imaging room at the James Cancer Center. The scope includes new conduit pathways, power, floor CT rails, ceiling coordination, process chilled water and other infrastructure to support the new equipment.
11/20/2026 07:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OSU-220524, McCampbell - OBGYN Renovation
Alterations to 4th Floor OBGYN Clinic including, millwork, painting, electrical and technology.
10/16/2025 06:00 PM UTC
OSU-240260, Newton - Lab Renovations
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
10/14/2025 06:00 PM UTC
OSU-200613, Emergency Response Radio System
The Ohio State University is seeking a general contractor and subcontractors to execute the replacement of the ERRS system for eight buildings at OSU. Buildings include Dodd/Davis, McCampbell Hall, Brain & Spine, Ross Heart, 395 West 12th, Doan, Rhodes and the James.
10/07/2025 06:00 PM UTC
OSU-250021 Wexner Center for the Arts, Exterior Pavers REBID
The project consists of the construction of two walkways leading to the Wexner Center for the Arts building with buff wash concrete, from College Road South to the building. The area immediately adjacent to the building entrance will be upgraded with high-quality granite paver. All storm drains within the project area will be replaced with new ones to facilitate stormwater runoff.
10/06/2025 06:00 PM UTC
OSU-260006 - Ohio Stadium - Heat Trace to Piping (Phase 3)
This project will install heat trace to existing storm and sanitary piping within the Ohio Stadium.
10/01/2025 06:00 PM UTC
OSU-240082, James - Pharmacy Administration Renovation (C150, C150A through C150F, C150X)
The project is the renovation of an existing open office into enclosed office in the administrative suite. The area of construction is approximately 1,500 square feet. The work consists of the removal of flooring and ceiling grid and tiles and the associated fire protection, mechanical, and electrical systems. The new work will consist of creating eight private offices and two general work areas. The new work will entail new partitions, doors and frames, ceilings, finishes in the new OSUWMC finish standards, and the associated mechanical, electrical, and fire protection systems
09/30/2025 06:00 PM UTC
OSU-230104, Elevator Repairs and Replacements FT23-24
Elevator Modernizations of 2 elevators in 2 buildings, with an alternate for a third elevator in a separate building.
09/23/2025 06:00 PM UTC
OSU-230480 FOD Training Center Build Out
Project will build a FOD training facility within the existing building at 1165 Kinnear Rd.
09/22/2025 06:00 PM UTC
OSU-250021 Wexner Center for the Arts Exterior Pavers
The project consists of the construction of two walkways leading to the Wexner Center for the Arts building with buff wash concrete, from College Road South to the building and from Annie and John Glenn Avenue to the building. The area immediately adjacent to the building entrance will be upgraded with high-quality granite paver. All storm drains in the project area will be replaced with new ones to facilitate stormwater runoff.
09/12/2025 06:00 PM UTC
OSU-230033, Marion - Various Campus Upgrades (Rebid)
OSU Marion Campus: One-for-one replacement of two existing gas-fired boilers and associated components as indicated in the bid documents.
09/10/2025 06:00 PM UTC
71 - 80 of 652 Solicitations
1 2 3 4 5 6 8 10 11 12 … 65 66