OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork.
Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
| 05/07/2025 05:00 PM UTC |
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof
membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
| 05/13/2025 06:00 PM UTC |
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
| 05/14/2025 06:00 PM UTC |
OSU-240504-1 - Airport - Taxiway A, Phase 2
This project includes the milling of the existing asphalt surface on Taxiway A, full depth reclamation of remaining aggregate base, and asphalt paving. Also included is minor airfield electrical and pavement markings. The project is financed with grant assistance from the Federal Aviation Administration (FAA) and is subject to the Davis-Bacon Act and Related Provisions and compliance with FAA Buy American Preference.
| 05/20/2025 06:00 PM UTC |
OSU-230401, 2001 Polaris Pkwy - Cell Therapy Lab
Site work and utility connections to 4 modular units. Connector vestibules to 2001
Approx 1000 SF steel framed addition. Approx 4000 SF interior alterations for research laboratories and support spaces.
| 05/21/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-230517 - Ohio Union - CCTV Upgrade
This project will complete a full replacement of the CCTV system at The Ohio State University Ohio Union Building.
| 02/21/2024 07:00 PM UTC |
OSU-220458, Outpatient Care East - Xray Machines
Interior renovation for new x-ray equipment and casework within existing occupied outpatient care facility.
| 02/16/2024 07:00 PM UTC |
OSU-230412, Schottenstein - Fire Alarm Completion
This project will upgrade the remaining fire alarm systems throughout the Schottenstein Center that has not been previously completed through other projects. The scope of the project will require a design to upgrade the system to be compliant with current codes and University design standards and will include new and upgrades/replacement of audio and visual devices, pathways and wiring throughout portions of the building. There will also be work involved with the existing fire suppression systems to replace or add components to coordinate with the new work.
| 01/25/2024 07:00 PM UTC |
OSU-210269 Building Envelope Repairs
The scope of the project include repair of exterior glue-lam arched
beams, replacement of exterior T1-11 wood panel siding, limited site
work for asphalt walk removal, installation of 2.5” rigid insulation,
coverboard and PVC (FiberTite) roof membrane as an overlay on an
existing PVC roof membrane. The new insulation and PVC
(FiberTite) roof membrane will be provided by OSU as they already
own the material.
| 01/04/2024 07:00 PM UTC |
OSU-220221 OSUE West Parking Lot REBID
Construction of a new parking lot to the west of Hughes Street on the western edge of the OSU East Hospital Complex.
| 12/19/2023 07:00 PM UTC |
OSU-220456 12th Ave Dom Water & Sanitary
Replacement of waterline and sanitary sewer along west 12th Ave
between High Street and College Street. All site work to be
performed between May 20 and August 2, 2024.
| 12/05/2023 06:00 PM UTC |
OSU-210264 Emergency Generator REBID
Enter Project Name and Location
| 11/20/2023 06:00 PM UTC |
OSU-220520 Building Control Upgrades FY22
This project includes the replacement of the existing Johnson
Controls Systems for Stillman Hall, Hagerty Hall, Hopkins Hall and
Commissary with Delta Controls.
| 11/16/2023 07:00 PM UTC |
OSU-210270 Plumbing Repairs - Veterinary Medical Center
Replacement of existing galvanized steel cold water piping.
Installation of new piping prior to demolition of active mains. Removal
of all obsolete piping. Replacement of aging valves in the hot and
cold water system. Select underslab sanitary work to fix known
issues. Replacement of flooring in areas of underslab work. Select
above ceiling sanitary work to fix known issues/leaks. Abatement of
select valves and flooring mastic. All work required for installation in
an active and occupied veterinary hospital facility
| 11/16/2023 06:00 PM UTC |
OSU-230458, East Tower - ADA Improvements REBID
The scope of work in the East Main Building is as identified: Raise the existing drinking fountain outside of toilet rooms R219T & R221T. The scope of work in the East Tower is as identified: Full renovation to ADA improvements for toilet rooms T033T, T034T, C104T and C200T. The existing registration desk located in C141 will need to be renovated to meet ADA. The main entry vestibule will require the removal of the existing walk-off mat and replacement in like-kind.
PHASE I: R219T, R221T, C104T and C141 Reception Desk.
PHASE II: T033T, T034T, C200T and Vestibule.
| 11/15/2023 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.