The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
| 10/01/2026 06:00 PM UTC |
|
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
| 10/01/2026 06:00 PM UTC |
|
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included.
All noisy work is to occur after normal operating hours.
| 10/06/2026 06:00 PM UTC |
|
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms
670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
| 10/08/2026 06:00 PM UTC |
|
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
| 10/12/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-230033, Marion - Various Campus Upgrades (Rebid)
OSU Marion Campus: One-for-one replacement of two existing gas-fired boilers and associated components as indicated in the bid documents.
| 09/10/2025 06:00 PM UTC |
|
OSU-220298, Lima - Reed Hall Theatre Upgrades
OSU Lima Campus: The Project consists of the construction of 4,000 SF interior renovation of the existing theatre in Reed Hall (4276 Campus Drive- Lima, Ohio 45804). The renovation includes refinishing the existing ceiling and upgrades to lighting and mechanical systems
| 09/03/2025 06:00 PM UTC |
|
OSU-250012 - Fawcett Center - Walk-in Cooler Freezer Replacement
This project will replace the freezer and coolers on the first floor of the Fawcett Center.
| 08/21/2025 06:00 PM UTC |
|
OSU-230844 - Newark - Evans Hall Renovation
This project includes additions and renovations for the COTC Public Training Facility. Renovations include new classrooms, office and restrooms, HVAC replacement, exterior wall enhancements, new doors and windows and new finishes throughout. Additions include a new secure entry vestibule. New parking and landscaping are included as part of the sitework.
| 08/07/2025 06:00 PM UTC |
|
OSU 240639 Outpatient East New West Parking Lot Bid Package 1
This project will add a new parking lot to the west of the facility.
| 08/01/2025 06:00 PM UTC |
|
OSU-230033, Marion - Various Campus Upgrades
OSU Marion Campus: Project consists of one-for-one replacement of two gas-fired boiler units and associated equipment on the third floor of Morrill Hall, a classroom and administrative building, on the Marion campus of The Ohio State University.
| 07/22/2025 06:00 PM UTC |
|
OSU-240463, Mason Hall - 1st Floor Business Lab
Reconfiguration of existing offices and classrooms into a new classroom. Scope of work will include new partitions, new finishes, and adjustments to existing finishes. Removal of an existing connecting stair will require new structural steel framing and new concrete slab to close the existing opening. Existing sprinkler heads, fire alarm, mechanical devices, and electrical receptacles will be adjusted and modified to accommodate new uses.
| 07/17/2025 06:00 PM UTC |
|
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof
membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
| 06/17/2025 06:00 PM UTC |
|
OSU-250017 - Newark - Lefevre Hall Chiller and Cooling Tower Replacement
This project will replace the existing water-cooled chiller with a new water-cooled chiller and replace the existing cooling tower
| 06/12/2025 06:00 PM UTC |
|
OSU-250053 - Newark - Pavement Improvements
The project includes pavement mill & overlay to address deferred maintenance of shared parking lots and roadways throughout the college campus in Newark, Ohio.
| 05/27/2025 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.