OSU-250046 Evans Lab 1969 Addition Demolition
Complete demolition of north wing of Evans Lab, the 1969 (northern most) addition of the facility. The remaining site will become temporary green space.
Utilities serving adjacent wings will be maintained, including but not limited to natural gas, heating and domestic hot water, steam, domestic cold water, electric, fire alarm and ERRCS systems, and will be capped/terminated at appropriate locations to allow for re-use in subsequent project phases.
A metal panel wall enclosure and interior hollow metal doors will be added to the remaining facility.
| 05/21/2026 06:00 PM UTC |
|
OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26
SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory.
PVC Membrane Roof Replacement at Independence Hall.
Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
| 05/22/2026 06:00 PM UTC |
|
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
| 05/28/2026 06:00 PM UTC |
|
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
| 06/05/2026 06:00 PM UTC |
|
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
| 06/09/2026 06:00 PM UTC |
|
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
| 06/18/2026 05:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-255631, Morehouse Medical Plaza - Concourse - Medical Gas Enclosure and Upgrade
This project entails the addition of a new dedicated medical gas
storage enclosure at the facility to safely house increased medical oxygen cylinder capacity in compliance with NFPA 99 standards, featuring secure noncombustible construction, proper ventilation, cylinder restraints, and required safety signage. The scope includes installation of additional medical oxygen drops in targeted patient care areas via new copper piping, zone valves, and alarm integrations, along with the strategic relocation of existing medical gas equipment to optimize accessibility, maintenance, and system redundancy. All work will involve phased implementation to minimize disruptions, full system purging, pressure testing, third party certification, and verification to ensure code-compliant, safe, and reliable medical gas delivery supporting current operations and future facility expansion.
| 04/10/2026 06:00 PM UTC |
|
OSU-250040 Fire Systems Renovations - FY25-26
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
| 04/08/2026 06:00 PM UTC |
|
OSU-210742, Arps - Masonry & Parapet
OSU Columbus Campus: Masonry wall repairs and low-slope roof replacement for Arps Hall.
| 04/06/2026 06:00 PM UTC |
|
OSU-250061College Road Rebuild
The project includes reconstruction of College Road from 12th Avenue at the south through the Oval to the north, along with sidewalk, hardscape, lighting, and landscape improvements along both sides of College Road.
| 03/25/2026 06:00 PM UTC |
|
OSU-250037 Roof Renewal FY25-26
SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory.
PVC Membrane Roof Replacement at Independence Hall.
| 03/04/2026 07:00 PM UTC |
|
OSU-240504-4 - Airport - Taxiway G, Rehabilitation - Phase 1
This project includes the removal and full-depth replacement of a section of The Ohio State University Airport Taxiway G. This also includes shoulder adjustment and pavement markings.
| 02/27/2026 07:00 PM UTC |
|
OSU-250308 Mershon Aud Smoke Evac Replacement
Replace existing roof-mounted, automatic smoke vent over stage
| 02/26/2026 07:00 PM UTC |
|
OSU-230116 Herrick Drive Rebuild
This project is the full depth pavement reconstruction of John Herrick Drive from Olentangy River Road to Woody Hayes Drive. This project includes the construction of a 10’ shared use path, upgraded lighting, pedestrian signal modifications, pavement markings, and landscaping.
| 02/13/2026 07:00 PM UTC |
|
OSU-240082, James - Pharmacy Administration Renovation (C150, C150A through C150F, C150X) REBID
The project is the renovation of an existing open office into enclosed office in the administrative suite. The area of construction is approximately 1,500 square feet. The work consists of the removal of flooring and ceiling grid and tiles and the associated fire protection, mechanical, and electrical systems. The new work will consist of creating eight private offices and two general work areas. The new work will entail new partitions, doors and frames, ceilings, finishes in the new OSUWMC finish standards, and the associated mechanical, electrical, and fire protection systems
| 02/12/2026 07:00 PM UTC |
|
OSU-255191, Ross Cardiac Cath Lab #5 Renovation/Replacement
Renovation and equipment replacement of Cath Lab #5.
| 02/05/2026 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.