General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250046 Evans Lab 1969 Addition Demolition
Complete demolition of north wing of Evans Lab, the 1969 (northern most) addition of the facility. The remaining site will become temporary green space. Utilities serving adjacent wings will be maintained, including but not limited to natural gas, heating and domestic hot water, steam, domestic cold water, electric, fire alarm and ERRCS systems, and will be capped/terminated at appropriate locations to allow for re-use in subsequent project phases. A metal panel wall enclosure and interior hollow metal doors will be added to the remaining facility.
05/21/2026 06:00 PM UTC
OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26 SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory. PVC Membrane Roof Replacement at Independence Hall. Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
05/22/2026 06:00 PM UTC
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
05/28/2026 06:00 PM UTC
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
06/05/2026 06:00 PM UTC
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
06/09/2026 06:00 PM UTC
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
06/18/2026 05:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OSU-255631, Morehouse Medical Plaza - Concourse - Medical Gas Enclosure and Upgrade
This project entails the addition of a new dedicated medical gas storage enclosure at the facility to safely house increased medical oxygen cylinder capacity in compliance with NFPA 99 standards, featuring secure noncombustible construction, proper ventilation, cylinder restraints, and required safety signage. The scope includes installation of additional medical oxygen drops in targeted patient care areas via new copper piping, zone valves, and alarm integrations, along with the strategic relocation of existing medical gas equipment to optimize accessibility, maintenance, and system redundancy. All work will involve phased implementation to minimize disruptions, full system purging, pressure testing, third party certification, and verification to ensure code-compliant, safe, and reliable medical gas delivery supporting current operations and future facility expansion.
04/10/2026 06:00 PM UTC
OSU-250040 Fire Systems Renovations - FY25-26
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
04/08/2026 06:00 PM UTC
OSU-210742, Arps - Masonry & Parapet
OSU Columbus Campus: Masonry wall repairs and low-slope roof replacement for Arps Hall.
04/06/2026 06:00 PM UTC
OSU-250061College Road Rebuild
The project includes reconstruction of College Road from 12th Avenue at the south through the Oval to the north, along with sidewalk, hardscape, lighting, and landscape improvements along both sides of College Road.
03/25/2026 06:00 PM UTC
OSU-250037 Roof Renewal FY25-26
SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory. PVC Membrane Roof Replacement at Independence Hall.
03/04/2026 07:00 PM UTC
OSU-240504-4 - Airport - Taxiway G, Rehabilitation - Phase 1
This project includes the removal and full-depth replacement of a section of The Ohio State University Airport Taxiway G. This also includes shoulder adjustment and pavement markings.
02/27/2026 07:00 PM UTC
OSU-250308 Mershon Aud Smoke Evac Replacement
Replace existing roof-mounted, automatic smoke vent over stage
02/26/2026 07:00 PM UTC
OSU-230116 Herrick Drive Rebuild
This project is the full depth pavement reconstruction of John Herrick Drive from Olentangy River Road to Woody Hayes Drive. This project includes the construction of a 10’ shared use path, upgraded lighting, pedestrian signal modifications, pavement markings, and landscaping.
02/13/2026 07:00 PM UTC
OSU-240082, James - Pharmacy Administration Renovation (C150, C150A through C150F, C150X) REBID
The project is the renovation of an existing open office into enclosed office in the administrative suite. The area of construction is approximately 1,500 square feet. The work consists of the removal of flooring and ceiling grid and tiles and the associated fire protection, mechanical, and electrical systems. The new work will consist of creating eight private offices and two general work areas. The new work will entail new partitions, doors and frames, ceilings, finishes in the new OSUWMC finish standards, and the associated mechanical, electrical, and fire protection systems
02/12/2026 07:00 PM UTC
OSU-255191, Ross Cardiac Cath Lab #5 Renovation/Replacement
Renovation and equipment replacement of Cath Lab #5.
02/05/2026 07:00 PM UTC
11 - 20 of 621 Solicitations
2 4 5 6 7 8 9 62 63