General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240175, Research Admin Bldg - 4th Floor Renovation
Project consists of an interior renovation of approximately 10,466 SF of the 4th floor including minor demolition, construction of new interior partitions, new ceiling grid and tile, new doors, new finishes, associated mechanical, electrical, plumbing and fire protection work. An accessible restroom is being added to the floor. A break area will also be added with associated plumbing, casework and fixtures.
11/19/2026 07:00 PM UTC
OSU-255058, James Hospital D232A Brachytherapy CT Replacement
This project will install a new Siemens CT-on-rails in an existing imaging room at the James Cancer Center. The scope includes new conduit pathways, power, floor CT rails, ceiling coordination, process chilled water and other infrastructure to support the new equipment.
11/20/2026 07:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OSU-265500, East Hospital - Talbot Hall - Sleep Lab Support Space Renovation REBID
A renovation to add two restrooms and a staff kitchenette to the existing sleep lab suite. There are minor fire alarm additions to the existing caretaker rooms as well.
09/24/2026 06:00 PM UTC
OSU-230429, Lima - Galvin Phase 2 Renovation Floor 3
OSU Lima Campus: The project will include an interior alteration + renovate approximately 190 SF at the basement level to replace the fire pump, 845 SF of the first floor southeast and southwest vestibule storefront system, ceilings and exterior soffit metal panel replacement, 592 SF (3) third floor toilet rooms with new finishes and plumbing fixtures. (4) fourth floor combining both existing facility toilet rooms to create a family accessible toilet room with an adult changing table.
09/22/2026 06:00 PM UTC
OSU-265500, East Hospital - Talbot Hall - Sleep Lab Support Space Renovation
A renovation to add two restrooms and a staff kitchenette to the existing sleep lab suite. There are minor fire alarm additions to the existing caretaker rooms as well.
09/09/2026 06:00 PM UTC
OSU-260012, Hopkins and Hayes - Rm Renovations
OSU Columbus Campus: Minor demolition, new partitions, mechanical and electrical modifications, new lighting, new ceiling, floor and wall finishes, and refurbishment of existing floors in Room 304 of Hayes Hall and Rooms 162, 262, and 358 of Hopkins Hall and other Work indicated in the Contract Documents.
09/09/2026 06:00 PM UTC
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement
Ohio State University Fuel Tank and Dispensing Infrastructure Replacement: Replace underground storage tanks and dispensers
09/03/2026 06:00 PM UTC
OSU-255632, JCSMI Rehab Clinic Expansion
OSU Columbus Campus: This project includes the partial renovation of the third floor of the Jameson Crane Sports Medicine Institute (JCSMI). The overall intent of the project is to create additional rehabilitation space for the facility through the relocation of an existing waiting room to the existing elevator lobby. Work includes but is not limited to the relocation of the existing wood and solid surface reception desk, selective demolition, new wall Construction, finishes, HVAC, Electrical, Technology and Fire Protection. Refer to the architectural drawings for the only approved OSU millwork vendor who is to be contracted to perform the relocation of the reception desk. Relocation work will be under this contract.
09/03/2026 06:00 PM UTC
OSU-250050 Marion - Morrill Hall Fire Panel/Elevator Upgrades
Fire alarm and elevator upgrades within Morrill Hall at the OSU Marion campus.
08/26/2026 06:00 PM UTC
OSU-250014 Lima - Life and Physical Science Bldg Safety Renovation
• Recover of roof system with insulation and EPDM membrane. • Selective replacement of damaged, wet, or deteriorated insulations. • Replacement of edge metals. • Lightening protection replacement. • Fire alarm panel replacement. • Fire pump controller replacement (alternate)
08/26/2026 06:00 PM UTC
OSU-230499 Tunnel Rehabilitation Phase I BP-3
The project consists of the removal and replacement of the South Neil tunnel roof, removal of abandoned utilities, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct new steam and condensate and chilled water supply and return lines within the South Neil Tunnel. Direct buried chilled water lines will also be installed under this scope.
08/20/2026 06:00 PM UTC
OSU-210390, Lima - Ford Engine Plant EEMC Lab Upgrades
Renovations and upgrades to two lab spaces at OSU Lima – Ford Engine Plant EEMC Lab located at 115 Bible Rd Lima, Ohio 45801
08/20/2026 06:00 PM UTC
11 - 20 of 652 Solicitations
2 4 5 6 7 8 9 … 65 66