General Info

Business Logo

Solicitations and notifications are free for this business.

Fresno County Department of Public Works and Planning

2220 Tulare Street 7th Floor, Fresno , CA 93721
(559) 600-9908


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-04-PR
Kearney Park Improvements The work to be done consists, in general, of improvements to Kearney Park, located at 6725 W. Kearney Blvd. in Fresno, CA, including the installation of a new County-furnished prefabricated restroom and connecting it to utilities, demolishing two septic tanks at existing restrooms and connecting those restrooms to an existing City of Fresno sewer trunk, removing the old playground and installing three new County-furnished playground structures, installing a County-furnished premanufactured steel shelter, constructing a multi-purpose court (tennis, basketball and pickleball courts), reconstructing a parking lot, installing additional lighting throughout the park, and other miscellaneous work such as clearing and grubbing, grading, parking lot striping, installation of speed bumps and wheel stops. Additive items include fog sealing some of the existing parking lots and the replacement/repair of existing decorative rock walls throughout the park.
07/02/2025 09:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
25-03-C
Houghton Canal Bridge Replacement at N. Chateau Fresno Avenue The work to be done consists, in general, of widening and reconstructing the approach road, realigning and reconstructing canal access roads, relocating irrigation lines, and replacing the structurally deficient two-lane bridge with a standard two-lane bridge. The Houghton Canal Bridge on Chateau Fresno Avenue (Bridge No. 42C0486/42C0695, 04-030) is located 0.5 miles south of Belmont Avenue in Fresno, CA and has been closed since 2023. The new bridge structure will consist of Cast-In-Place, Pre-Stressed concrete slabs which will be supported by a Cast-In-Drill-Hole concrete pile foundation. The DBE Contract Goal is 21 percent. Federal Project Number: BRLO-5942(237)
06/05/2025 09:00 PM UTC
24-S-15
Main Jail Accessibility Upgrades 1225 M Street, Fresno, CA 93721 The work to be done consists, in general, of accessibility alterations to the existing housing cells and showers on the 3rd, 4th, 5th, and 6th floor which will result in Pods A, B, E, and F each having one alternate roll-in type accessible shower compartment and one accessible housing cell.
05/29/2025 09:00 PM UTC
25-02-C
El Porvenir Community Road Improvements The work to be done consists, in general, of reconstructing 0.5 miles of road and the installation and construction of ADA compliant curb ramps, sidewalk, curbs, gutters, and storm drains in the unincorporated community of El Porvenir, also referred to as “Three Rocks, CA,” located approximately 47 miles southwest of Fresno, CA.
05/29/2025 09:00 PM UTC
24-02-C
Jensen Avenue Improvements West Avenue to Fig Avenue (MLK Boulevard) The work to be done consists, in general, of reconstructing approximately 1.5 miles of Jensen Avenue from West Avenue to Fig Avenue (also known as MLK Blvd). The road will be reconstructed using a Full-Depth Reclamation with Cement method. The road work includes construction of new curb ramps, adjusting sewer manholes, signage and striping, and other miscellaneous items. A new ductile iron water pipeline will also be installed, replacing an existing asbestos water pipeline to be abandoned in place. Coordination with City of Fresno Public Utilities Department will be necessary to arrange the tie-in to existing system. The pipe replacement also involves installation of new water meters, fire hydrants, valves, and other appurtenant work. Some Fresno Metropolitan Flood Control District (FMFCD) master storm drain facilities shall also be installed as part of the work. The DBE Contract Goal is 17% percent. Federal Project Number: STPL-5942(296) and STPL-5942(289)
05/01/2025 09:00 PM UTC
24-27-M
Lincoln Avenue Overlay Fig Avenue to Cedar Avenue The work to be done consists, in general, of cold planing of about 0.75 miles of asphalt pavement, placing geosynthetic pavement interlayer over 2.0 miles, and constructing an asphalt concrete overlay on Lincoln Avenue from Fig Avenue to Cedar Avenue (2.5 miles) in the County of Fresno, California.
04/24/2025 09:00 PM UTC
24-24-PR
Choinumni Park Improvements The work to be done consists, in general, of improvements to Choinumni Park including furnishing and installing picnic/barbecue areas, prefabricated shelters, playground and play structures, horseshoe pits, and concrete cornhole boards, miscellaneous signage and striping, and miscellaneous electrical and plumbing improvements throughout the park. The work will also include two new trails, application of chip seals on existing roads and camp stalls, and replacement of the existing campsite fire pits and picnic tables. This project contains additive items including construction of restrooms and septic system, informational kiosks along the trails, installation of solar powered lights, application of additional chip seal to the remaining roads throughout the park and the construction of a basketball court and volleyball courts. State of California Department of Parks and Recreation Project Number: RG-10-001
04/03/2025 09:00 PM UTC
24-S-14
Department of Public Health Basement Renovation The work to be done consists of, in general, the redesign and interior improvements of the basement of the Brix-Mercer Building that was previously damaged by flooding. Interior improvements to consist of the assembly of meeting rooms, offices, and storage occupancies including the construction of new walls, carpeting, and painting, with upgrades to the plumbing, mechanical, fire sprinklers, and electrical systems.
04/03/2025 09:00 PM UTC
24-08-C
Jacalitos Creek Bridge Replacement on Lost Hills Road Bridge Number: 42C0078 The work to be done consists, in general, of widening the existing roadway (no additional capacity) and replacing the structurally deficient two-lane bridge with a standard two-lane bridge. The Jacalitos Creek Bridge on Lost Hills Road (Bridge No. 42C0078 / 03-038) is located 3.8 miles south of the community of Coalinga. The new bridge structures will consist of pre-cast, pre-stressed concrete voided slabs which will be supported by outrigger piers, pier caps, and a Cast-In-Drill-Hole concrete pile foundation. The work also includes constructing abutments, installing bridge concrete barriers, finishing the bridge decks with polyester concrete overlay, and placing a hot mix asphalt concrete overlay on the roadway approaches. A temporary detour road will be created with temporary railings and temporary crash cushions. The DBE Contract Goal is 17% percent. Federal Project Number: BRLO-5942(234)
03/27/2025 09:00 PM UTC
24-23-C
Waterworks District 40 – Water Supply Well(s) Construction The work to be done consists, in general, of the construction of up to two new wells with necessary appurtenances and installation of necessary piping to the existing distribution system within the community of Shaver Springs, approximately 40 miles northeast of the City of Fresno.
03/20/2025 09:00 PM UTC
24-S-09
DBH Olive Avenue Campus Remodel 5555 E. Olive Avenue, Fresno, CA 93727 The work to be done consists, in general, of remodeling the Department of Behavioral Health (DBH) building, an approximately 115,000 square foot office building located at 5555 E. Olive Avenue, Fresno, CA 93727. The building interior will be renovated to provide adult and children behavioral health service suites, adult and children urgent care suites, medical and records support suites, a multi-purpose/childcare suite, and staff offices.
03/06/2025 10:00 PM UTC
1 - 10 of 103 Solicitations
← Previous 1 3 4 5 6 7 8 9 10 11