General Info

Business Logo

Solicitations and notifications are free for this business.

Fresno County Department of Public Works and Planning

2220 Tulare Street 7th Floor, Fresno , CA 93721
(559) 600-9908


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-06-C
Mt. Whitney Ave. Road Reconstruction and Shoulder Improvements Mt. Whitney Avenue between S. Marks Avenue and S. Blythe Avenue The work to be done consists, in general, of reconstruction and improvements to approximately 1.6 miles of roadway from Marks Avenue to Blythe Avenue on Mt. Whitney Avenue in the unincorporated community of Riverdale. The road, including the travel lanes, the eight-foot paved shoulder, and the parking area will be reconstructed using a Full-Depth Reclamation cement treated method. The project also includes signage and striping, excavation and construction of a retention basin, storm drain improvements, adjusting sewer manholes, water valve boxes, and other miscellaneous items. Additive 1 bid items include installation of a Pedestrian Hybrid Beacon (PHB), also known as a High-Intensity Activated Crosswalk (HAWK) system, at the intersection of Mt. Whitney Avenue and Feland Avenue with necessary civil work as shown in the plans. There is no DBE Contract Goal. Federal Project Number: CPFL-5942(314)
11/06/2025 10:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
25-S-06
Main Jail Accessibility Upgrades 1225 M Street, Fresno, CA 93721 The work to be done consists, in general, of accessibility alterations to the existing housing cells and showers on the 3rd, 4th, 5th, and 6th floor which will result in Pods A, B, E, and F each having one alternate roll-in type accessible shower compartment and one accessible housing cell.
10/23/2025 09:00 PM UTC
25-07-J, 25-08-J, 25-09-J
General Engineering Job Order Contract (Class A) A Job Order Contract is an indefinite quantity contract pursuant to which the Contractor will perform an ongoing series of individual projects at different locations throughout the County of Fresno. The types of work to done may include, but is not limited to: concrete repair, culvert repair, guardrail replacement, bridge removal, bridge wing wall repair, irrigation pipe replacement, repair of failed roadway sections, repair of asphalt dike, and minor parking lot repairs. Work being contemplated under the Job Order Contract may include potentially federally funded work associated with a declared disaster over which the Federal Emergency Management Agency would have oversight. The bid documents include a Construction Task Catalog® containing construction tasks with preset Unit Prices. All Unit Prices are based on local labor prevailing wages, material and equipment prices and are for the direct cost of construction.
10/09/2025 09:00 PM UTC
25-J-02, 25-J-03, 25-J-04, 25-J-05
General Building Job Order Contract (Class B) A Job Order Contract is an indefinite quantity contract pursuant to which the Contractor will perform an ongoing series of individual projects at different locations throughout the County of Fresno. The bid documents include the General Conditions and a Construction Task Catalog®, which contain construction tasks with preset Unit Prices. All Unit Prices are based on local labor prevailing wages, material and equipment prices and are for the direct cost of construction.
10/09/2025 09:00 PM UTC
25-01-CD
CSA 44A Wastewater Facility Improvements The work to be done consists, in general, of the replacement of the lift station basin and pumps with all necessary appurtenant work, including connection to the existing lift station panel for a new fully functional lift station, installation of a new sludge digester tank, and installation of miscellaneous piping and valves. This project contains additive items including replacement of the entrance chain link access gate. Community Development Block Grant Project Number: 21271
07/24/2025 09:00 PM UTC
25-04-PR
Kearney Park Improvements The work to be done consists, in general, of improvements to Kearney Park, located at 6725 W. Kearney Blvd. in Fresno, CA, including the installation of a new County-furnished prefabricated restroom and connecting it to utilities, demolishing two septic tanks at existing restrooms and connecting those restrooms to an existing City of Fresno sewer trunk, removing the old playground and installing three new County-furnished playground structures, installing a County-furnished premanufactured steel shelter, constructing a multi-purpose court (tennis, basketball and pickleball courts), reconstructing a parking lot, installing additional lighting throughout the park, and other miscellaneous work such as clearing and grubbing, grading, parking lot striping, installation of speed bumps and wheel stops. Additive items include fog sealing some of the existing parking lots and the replacement/repair of existing decorative rock walls throughout the park.
07/02/2025 09:00 PM UTC
25-03-C
Houghton Canal Bridge Replacement at N. Chateau Fresno Avenue The work to be done consists, in general, of widening and reconstructing the approach road, realigning and reconstructing canal access roads, relocating irrigation lines, and replacing the structurally deficient two-lane bridge with a standard two-lane bridge. The Houghton Canal Bridge on Chateau Fresno Avenue (Bridge No. 42C0486/42C0695, 04-030) is located 0.5 miles south of Belmont Avenue in Fresno, CA and has been closed since 2023. The new bridge structure will consist of Cast-In-Place, Pre-Stressed concrete slabs which will be supported by a Cast-In-Drill-Hole concrete pile foundation. The DBE Contract Goal is 21 percent. Federal Project Number: BRLO-5942(237)
06/05/2025 09:00 PM UTC
24-S-15
Main Jail Accessibility Upgrades 1225 M Street, Fresno, CA 93721 The work to be done consists, in general, of accessibility alterations to the existing housing cells and showers on the 3rd, 4th, 5th, and 6th floor which will result in Pods A, B, E, and F each having one alternate roll-in type accessible shower compartment and one accessible housing cell.
05/29/2025 09:00 PM UTC
25-02-C
El Porvenir Community Road Improvements The work to be done consists, in general, of reconstructing 0.5 miles of road and the installation and construction of ADA compliant curb ramps, sidewalk, curbs, gutters, and storm drains in the unincorporated community of El Porvenir, also referred to as “Three Rocks, CA,” located approximately 47 miles southwest of Fresno, CA.
05/29/2025 09:00 PM UTC
24-02-C
Jensen Avenue Improvements West Avenue to Fig Avenue (MLK Boulevard) The work to be done consists, in general, of reconstructing approximately 1.5 miles of Jensen Avenue from West Avenue to Fig Avenue (also known as MLK Blvd). The road will be reconstructed using a Full-Depth Reclamation with Cement method. The road work includes construction of new curb ramps, adjusting sewer manholes, signage and striping, and other miscellaneous items. A new ductile iron water pipeline will also be installed, replacing an existing asbestos water pipeline to be abandoned in place. Coordination with City of Fresno Public Utilities Department will be necessary to arrange the tie-in to existing system. The pipe replacement also involves installation of new water meters, fire hydrants, valves, and other appurtenant work. Some Fresno Metropolitan Flood Control District (FMFCD) master storm drain facilities shall also be installed as part of the work. The DBE Contract Goal is 17% percent. Federal Project Number: STPL-5942(296) and STPL-5942(289)
05/01/2025 09:00 PM UTC
24-27-M
Lincoln Avenue Overlay Fig Avenue to Cedar Avenue The work to be done consists, in general, of cold planing of about 0.75 miles of asphalt pavement, placing geosynthetic pavement interlayer over 2.0 miles, and constructing an asphalt concrete overlay on Lincoln Avenue from Fig Avenue to Cedar Avenue (2.5 miles) in the County of Fresno, California.
04/24/2025 09:00 PM UTC
1 - 10 of 108 Solicitations
← Previous 1 3 4 5 6 7 8 9 10 11