Free Solicitations and notifications are free for this business.
Fresno County Department of Public Works and Planning
2220 Tulare Street 7th Floor, Fresno , CA 93721
(559) 600-9908
Free Solicitations and notifications are free for this business.
2220 Tulare Street 7th Floor, Fresno , CA 93721
(559) 600-9908
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
25-06-C
Mt. Whitney Ave. Road Reconstruction and Shoulder Improvements
Mt. Whitney Avenue between S. Marks Avenue and S. Blythe Avenue
The work to be done consists, in general, of reconstruction and improvements to approximately 1.6 miles of roadway from Marks Avenue to Blythe Avenue on Mt. Whitney Avenue in the unincorporated community of Riverdale. The road, including the travel lanes, the eight-foot paved shoulder, and the parking area will be reconstructed using a Full-Depth Reclamation cement treated method. The project also includes signage and striping, excavation and construction of a retention basin, storm drain improvements, adjusting sewer manholes, water valve boxes, and other miscellaneous items. Additive 1 bid items include installation of a Pedestrian Hybrid Beacon (PHB), also known as a High-Intensity Activated Crosswalk (HAWK) system, at the intersection of Mt. Whitney Avenue and Feland Avenue with necessary civil work as shown in the plans.
There is no DBE Contract Goal.
Federal Project Number: CPFL-5942(314)
| 11/06/2025 10:00 PM UTC |
| Number | Deadline |
|---|---|
|
25-S-06
Main Jail Accessibility Upgrades
1225 M Street, Fresno, CA 93721
The work to be done consists, in general, of accessibility alterations to the existing housing cells and showers on the 3rd, 4th, 5th, and 6th floor which will result in Pods A, B, E, and F each having one alternate roll-in type accessible shower compartment and one accessible housing cell.
| 10/23/2025 09:00 PM UTC |
|
25-07-J, 25-08-J, 25-09-J
General Engineering Job Order Contract (Class A)
A Job Order Contract is an indefinite quantity contract pursuant to which the Contractor will perform an ongoing series of individual projects at different locations throughout the County of Fresno. The types of work to done may include, but is not limited to: concrete repair, culvert repair, guardrail replacement, bridge removal, bridge wing wall repair, irrigation pipe replacement, repair of failed roadway sections, repair of asphalt dike, and minor parking lot repairs. Work being contemplated under the Job Order Contract may include potentially federally funded work associated with a declared disaster over which the Federal Emergency Management Agency would have oversight. The bid documents include a Construction Task Catalog® containing construction tasks with preset Unit Prices. All Unit Prices are based on local labor prevailing wages, material and equipment prices and are for the direct cost of construction.
| 10/09/2025 09:00 PM UTC |
|
25-J-02, 25-J-03, 25-J-04, 25-J-05
General Building Job Order Contract (Class B)
A Job Order Contract is an indefinite quantity contract pursuant to which the Contractor will perform an ongoing series of individual projects at different locations throughout the County of Fresno. The bid documents include the General Conditions and a Construction Task Catalog®, which contain construction tasks with preset Unit Prices. All Unit Prices are based on local labor prevailing wages, material and equipment prices and are for the direct cost of construction.
| 10/09/2025 09:00 PM UTC |
|
25-01-CD
CSA 44A Wastewater Facility Improvements
The work to be done consists, in general, of the replacement of the lift station basin and pumps with all necessary appurtenant work, including connection to the existing lift station panel for a new fully functional lift station, installation of a new sludge digester tank, and installation of miscellaneous piping and valves. This project contains additive items including replacement of the entrance chain link access gate.
Community Development Block Grant Project Number: 21271
| 07/24/2025 09:00 PM UTC |
|
25-04-PR
Kearney Park Improvements
The work to be done consists, in general, of improvements to Kearney Park, located at 6725 W. Kearney Blvd. in Fresno, CA, including the installation of a new County-furnished prefabricated restroom and connecting it to utilities, demolishing two septic tanks at existing restrooms and connecting those restrooms to an existing City of Fresno sewer trunk, removing the old playground and installing three new County-furnished playground structures, installing a County-furnished premanufactured steel shelter, constructing a multi-purpose court (tennis, basketball and pickleball courts), reconstructing a parking lot, installing additional lighting throughout the park, and other miscellaneous work such as clearing and grubbing, grading, parking lot striping, installation of speed bumps and wheel stops. Additive items include fog sealing some of the existing parking lots and the replacement/repair of existing decorative rock walls throughout the park.
| 07/02/2025 09:00 PM UTC |
|
25-03-C
Houghton Canal Bridge Replacement at N. Chateau Fresno Avenue
The work to be done consists, in general, of widening and reconstructing the approach road, realigning and reconstructing canal access roads, relocating irrigation lines, and replacing the structurally deficient two-lane bridge with a standard two-lane bridge. The Houghton Canal Bridge on Chateau Fresno Avenue (Bridge No. 42C0486/42C0695, 04-030) is located 0.5 miles south of Belmont Avenue in Fresno, CA and has been closed since 2023. The new bridge structure will consist of Cast-In-Place, Pre-Stressed concrete slabs which will be supported by a Cast-In-Drill-Hole concrete pile foundation.
The DBE Contract Goal is 21 percent.
Federal Project Number: BRLO-5942(237)
| 06/05/2025 09:00 PM UTC |
|
24-S-15
Main Jail Accessibility Upgrades
1225 M Street, Fresno, CA 93721
The work to be done consists, in general, of accessibility alterations to the existing housing cells and showers on the 3rd, 4th, 5th, and 6th floor which will result in Pods A, B, E, and F each having one alternate roll-in type accessible shower compartment and one accessible housing cell.
| 05/29/2025 09:00 PM UTC |
|
25-02-C
El Porvenir Community Road Improvements
The work to be done consists, in general, of reconstructing 0.5 miles of road and the installation and construction of ADA compliant curb ramps, sidewalk, curbs, gutters, and storm drains in the unincorporated community of El Porvenir, also referred to as “Three Rocks, CA,” located approximately 47 miles southwest of Fresno, CA.
| 05/29/2025 09:00 PM UTC |
|
24-02-C
Jensen Avenue Improvements
West Avenue to Fig Avenue (MLK Boulevard)
The work to be done consists, in general, of reconstructing approximately 1.5 miles of Jensen Avenue from West Avenue to Fig Avenue (also known as MLK Blvd). The road will be reconstructed using a Full-Depth Reclamation with Cement method. The road work includes construction of new curb ramps, adjusting sewer manholes, signage and striping, and other miscellaneous items. A new ductile iron water pipeline will also be installed, replacing an existing asbestos water pipeline to be abandoned in place. Coordination with City of Fresno Public Utilities Department will be necessary to arrange the tie-in to existing system. The pipe replacement also involves installation of new water meters, fire hydrants, valves, and other appurtenant work. Some Fresno Metropolitan Flood Control District (FMFCD) master storm drain facilities shall also be installed as part of the work.
The DBE Contract Goal is 17% percent.
Federal Project Number: STPL-5942(296) and STPL-5942(289)
| 05/01/2025 09:00 PM UTC |
|
24-27-M
Lincoln Avenue Overlay
Fig Avenue to Cedar Avenue
The work to be done consists, in general, of cold planing of about 0.75 miles of asphalt pavement, placing geosynthetic pavement interlayer over 2.0 miles, and constructing an asphalt concrete overlay on Lincoln Avenue from Fig Avenue to Cedar Avenue (2.5 miles) in the County of Fresno, California.
| 04/24/2025 09:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.