General Info

Business Logo

Solicitations and notifications are free for this business.

Fresno County Department of Public Works and Planning

2220 Tulare Street 7th Floor, Fresno , CA 93721
(559) 600-9908


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
PWP24-015
Clovis Regional and Reedley Libraries The County of Fresno is requesting competitive RFQ Prequalification Questionnaires to pre-qualify prospective Design-Build Entities for: Clovis Regional Library: Design and construct a new 26,270 sq. ft. single-story library building within the existing Clovis Landmark Commons development in Clovis, CA. Functional areas include a regional public library and multi-use community room separated by a commonly accessed foyer. The building site plan, floor plan, exterior elevation, and schematic designs have been developed by Fresno County, are pre-approved by Fresno County Library staff, and are not subject to change. Design shall include but not be limited to the building interiors, site civil, building structural, mechanical and electrical engineering, etc. Reedley Library: Design and construct a new 14,000 sq. ft. single-story library building in Reedley, CA. Functional areas include a public library and multi-use community room separated by a commonly accessed foyer. The building site plan, floor plan and exterior elevation schematic designs have been developed by Fresno County, are pre-approved by Fresno County Library staff, and are not subject to change. Design shall include but not be limited to the building interiors, site civil, building structural, mechanical and electrical engineering, etc. Fresno County Design Guidelines, site surveys, and geotechnical reports, etc. will be provided to the shortlisted Design-Build Entity candidates.
05/16/2024 07:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
20-11-J 20-12-J 20-21-J Job Order Contracts General Engineering (Class A)
A Job Order Contract is an indefinite quantity contract pursuant to which the Contractor will perform an ongoing series of individual projects at different locations throughout the County of Fresno. The types of work to done may include, but is not limited to: concrete repair, culvert repair, guardrail replacement, bridge removal, bridge wing wall repair, irrigation pipe replacement, repair of failed roadway sections, repair of asphalt dike, and minor road or parking lot repairs. Work being contemplated under this Job Order Contract includes potentially Federally-funded work associated with a declared disaster (DR-4569-CA) over which the Federal Emergency Management Agency would have oversight. The bid documents include a Construction Task Catalog® containing construction tasks with preset Unit Prices. All Unit Prices are based on local labor prevailing wages, material and equipment prices and are for the direct cost of construction.
05/28/2021 09:00 PM UTC
20-20-C American Avenue and Golden State Blvd Intersection Improvements
The work to be done consists, in general, of making improvements to the intersection of American Avenue and Golden State Boulevard, including the intersections with Peach Avenue north and south of American Avenue. The existing roadway on American Avenue from SR99 to approximately 860 feet east of Peach Avenue will be reconstructed and realigned with 12-foot travel lanes, left and right turn lanes and 4-foot shoulders on each side. Golden State Boulevard will be reconstructed from approximately 1,252 feet south of American Avenue to approximately 846 feet north of American Avenue, left and right turn lanes will be added and traffic signals will be installed at the intersection of American Avenue and Golden State Boulevard. Peach Avenue will be reconstructed from American Avenue north for approximately 160 feet and from Golden State Boulevard south for approximately 320 feet. The County has pre-purchased and will provide to the Contractor the traffic signal poles, controller assembly and communication cabinet for this intersection. Union Pacific Railroad (UPRR) will perform construction at the Railroad Crossing concurrently with the intersection improvements. The contractor will be required to coordinate and obtain necessary permits from UPRR to perform work near/at the crossing, obtain a traffic encroachment permit from Caltrans for the temporary traffic control plan, and coordinate with PG&E to connect the new signal to the new meter and to relocate the UPRR service pole.
05/06/2021 09:00 PM UTC
20-17-C American Avenue Disposal Site Entrance Improvements
The work to be done consists, in general, of reconstructing and widening the America Avenue Disposal Site entrance access road, constructing a new right turn lane into the disposal site, regrading the existing ditch on the north side of the disposal site berm, excavating the ditch along the north side of American Ave from Plumas Ave to Humbolt Ave, installing two (2) 18” diameter reinforced concrete culvert pipes beneath the paved entrance, installing new chain link fences and gates, performing various electrical work including for the new gates, and replacing and lowering a segment of irrigation and leachate line.
04/29/2021 09:00 PM UTC
20-01-C Sand Creek Bridge Replacement on Ennis Road
The work to be done consists, in general, of replacing the existing bridge with a single-span, cast in place concrete box girder. The approach angles will be softened and the bridge profile will be raised. Removal of the existing bridge is included. The DBE Contract Goal is 14 percent. Federal Project Number: BRLO-5942(238) Bridge No. 42C0697
04/29/2021 09:00 PM UTC
20-J-06 20-J-07 20-J-08 Job Order Contracts General Building (Class B)
A Job Order Contract is an indefinite quantity contract pursuant to which the Contractor will perform an ongoing series of individual projects at different locations throughout the County of Fresno. The bid documents include a Construction Task Catalog® containing construction tasks with preset Unit Prices. All Unit Prices are based on local labor prevailing wages, material and equipment prices and are for the direct cost of construction.
04/29/2021 09:00 PM UTC
20-15-C James Bridge Replacements on Manning Ave
The work to be done consists, in general, of removing and replacing two structurally deficient bridges on Manning Avenue; the James Bypass Overflow East Channel Bridge (East Bridge), 3.8 miles west of State Route 145 (Bridge No. 42C0066) and the James Bypass Overflow West Bridge (West Bridge), 3.2 miles east of Colorado Avenue (Bridge No. 42C0067), east of the community of San Joaquin. The East and West replacement bridges will each have a width of 44 feet, and be 65 and 173 feet in length, respectively. The new bridge structures will consist of pre-cast, pre-stressed concrete voided slabs which will be supported by outrigger piers, pier caps, and a Cast-In-Drill-Hole concrete pile foundation. The work also includes constructing abutments, installing bridge concrete barriers, finishing the bridge decks with polyester concrete overlay, placing a hot mix asphalt concrete overlay on the roadway approaches, and installing roadway devices (crash cushions, approach guardrails, and flume over side down drains). Full street closure will be allowed for a short amount of time during the Accelerated Bridge Construction, and a detour will be provided. The DBE Contract Goal is 16% percent. Federal Project Number: BRLS-5942(233) BRIDGE NOS. 42C0691, 42C0692
04/08/2021 09:00 PM UTC
20-18-SW American Avenue Disposal Site Phase III Modules 3-8 Landfill Gas Collection and Control System Expansion
The work to be done consists, in general, of installing 23 new single depth Landfill Gas (LFG) vertical extraction wells and 15 LFG horizontal extraction wells; installing header and lateral piping to connect new extraction wells to the collection system; furnishing, installing and testing 6 condensate sumps, associated pumps and furnishing all appurtenances and performing all incidental work to effectuate the planned expansion of the site’s landfill gas collection and control system
03/11/2021 10:00 PM UTC
20-14-M Bituminous Seal Coats
The work to be done consists, in general, of furnishing and placing screenings over asphaltic emulsion at various existing roads in Fresno County. The seal coat will be constructed on 29.618 miles of roadway on County roads. County forces will repair, trim, and blade heavy dirt deposits and vegetation from the existing surfacing in advance of construction.
03/11/2021 10:00 PM UTC
20-10-C County Service Areas 30 & 32 Water System Improvements
The work to be done consists, in general, of furnishing all labor, materials and equipment necessary for the installation of a new water distribution system with service lines within the service limits of County of Fresno County Service Areas (CSA) 30 and 32, the Cantua Elementary School and nearby properties. The construction sites are located in the County of Fresno, California, in the communities of Three Rocks and Cantua Creek. The work includes, but is not limited to, installation of water mains, water services, fire hydrants, appurtenances, water system tie-ins to the existing tank sites, disinfecting, testing, trench resurfacing, striping, and abandonment of the existing water distribution system. The work involves removal of Asbestos Cement Pipe as necessary. A pre-bid conference will be held at 10 a.m. on Monday, September 14, 2020. The meeting will be held online (the link for which will be posted at http://www.co.fresno.ca.us/planholders). A brief presentation will be made by County staff, and a discussion of the project will be held. Attendance at the pre-bid conference is not mandatory.
10/15/2020 09:00 PM UTC
20-S-02 Animal Control Center
The Work consists of the construction of a new Administrative Office, Kennel Building and Intake Building with a detached Shade Structure and, Associated Site Work as shown on the Drawings.
09/03/2020 10:00 PM UTC
51 - 60 of 72 Solicitations
1 2 3 4 6 8