General Info

Business Logo

Solicitations and notifications are free for this business.

Fresno County Department of Public Works and Planning

2220 Tulare Street 7th Floor, Fresno , CA 93721
(559) 600-9908


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
PWP24-015
Clovis Regional and Reedley Libraries The County of Fresno is requesting competitive RFQ Prequalification Questionnaires to pre-qualify prospective Design-Build Entities for: Clovis Regional Library: Design and construct a new 26,270 sq. ft. single-story library building within the existing Clovis Landmark Commons development in Clovis, CA. Functional areas include a regional public library and multi-use community room separated by a commonly accessed foyer. The building site plan, floor plan, exterior elevation, and schematic designs have been developed by Fresno County, are pre-approved by Fresno County Library staff, and are not subject to change. Design shall include but not be limited to the building interiors, site civil, building structural, mechanical and electrical engineering, etc. Reedley Library: Design and construct a new 14,000 sq. ft. single-story library building in Reedley, CA. Functional areas include a public library and multi-use community room separated by a commonly accessed foyer. The building site plan, floor plan and exterior elevation schematic designs have been developed by Fresno County, are pre-approved by Fresno County Library staff, and are not subject to change. Design shall include but not be limited to the building interiors, site civil, building structural, mechanical and electrical engineering, etc. Fresno County Design Guidelines, site surveys, and geotechnical reports, etc. will be provided to the shortlisted Design-Build Entity candidates.
05/16/2024 07:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
21-07-SW American Avenue Disposal Site Phase I Waste Relocation
The work in general consists of the relocation of buried wastes currently located within Phase I to the lined Phase II waste management unit of the AADS, including mass excavation and hauling of approximately 1,500,000 cubic yards of waste and soil, decommissioning 10 groundwater monitoring wells, construction of a new paved access road, removal and disposal of existing landfill gas extraction wells and laterals, traffic control, construction of surface water management features, placement of 2‐foot‐thick intermediate cover, installation and maintenance of stormwater best practices, and erosion control measures including hydroseeding of slopes.
03/10/2022 10:00 PM UTC
RFQ 2021 On-Call A&E Consultant and Related Services
The County of Fresno is seeking qualified consulting firms to provide on-call architectural, engineering and other related services as may be necessary for Public Works Projects. These consulting and staff augmentation services include: Archaeology / Architectural History / Paleontology, Architectural Design and Drafting, Assessment Engineering, Biology, Building Commissioning (LEED), Certified Access Specialist (CASP) Certification, Civil Engineering, Construction Management, Cost Estimating, Electrical Engineering, Encroachment Permit Inspections, Environmental Planning Services, Geotechnical Engineering, Hydraulic Engineering, Industrial Hygiene, Hazardous Material, Lead and Asbestos Compliance, Land Use / Planning, Landscape Architecture, Materials Testing, Pavement Management, Plumbing and Mechanical Engineering, Solid Waste Engineering, Structural Engineering, Surveying, Traffic and Transportation Engineering, Utility Locating, Water Resource Operators, and Water Resources Engineering.
01/15/2022 12:00 AM UTC
21-08-C Peterson Road Guardrail Installation
The work to be done consists, in general, of installation of 360 feet of guardrail and appurtenances.
12/02/2021 10:00 PM UTC
21-02-C Lincoln Avenue Cold Pavement Recycling
The work to be done consists, in general, of recycling the existing surface of Lincoln Avenue, between SR 145 and the Grantland Avenue alignment, using an on-site Cold Central Plant Recycling (CCPR) technique and adding paved 4-foot wide shoulders, traffic striping, and shoulder backing. The CCPR technique establishes an on-site central locations to recycle and reconstruct the existing road’s pavement and will include cold planing 6 inches of the existing road’s surface and placing back the recycled material and then adding a 0.2 foot hot mix asphalt overlay. A varying thickness overlay with pavement interlayer will also be placed from Grantland Avenue alignment to Fig Avenue. The DBE Contract Goal is 12% percent. Federal Project Number: CMLSTBG-5942(300)
08/26/2021 10:30 PM UTC
21-04-C Fancher Creek Trail
The work to be done consists, in general, of constructing a 10-foot wide equestrian/pedestrian trail of stabilized decomposed granite over compacted native soil for a distance of approximately 1.12 miles. The trail commences on the south side of Kings Canyon Road west of Clovis Avenue and proceeds south to cross Butler Avenue, ultimately ending west of Clovis Avenue approximately halfway between Butler Avenue to the north and Church Avenue to the south. The project also includes the construction or installation of a 5-stall (including one ADA-compliant stall) asphalt concrete parking/trailhead area, a hitching post, removable bollards, and a crosswalk at Butler Avenue. The project also includes removal of various trees and stumps, safety pruning of the entire project right of way, and clearing the right of way for construction.
08/26/2021 09:00 PM UTC
21-03-M Slurry Seals
The work to be done consists, in general, of placing a slurry seal of asphaltic emulsion and sand mixture on 20.4 miles of roadway on various existing roads in Fresno County. Other items or details not mentioned herein that are required by the Standard Specifications or these special provisions shall be performed, constructed, furnished or installed.
08/26/2021 09:00 PM UTC
21-01-C Travers Creek at Manning Avenue Tree Removal
The work, in general, consists of trimming, removal, and proper disposal of 107 trees and approximately 93 brush units located within the project limits of the Travers Creek at Manning Avenue Bridge Replacement project, 0.6 mi. west of Alta Avenue. Stump grinding is required in certain project areas. All debris generated by the felling, removal, and trimming of trees must be removed. The roadway must be kept free from debris at all times. The DBE Contract Goal is 12% percent. Federal Project Number: BRLS-5942(198)
08/05/2021 09:00 PM UTC
20-09-C McCall Asphalt Concrete Overlay
The work to be done consists, in general, of placement of asphalt concrete overlays, traffic striping, and shoulder backing on McCall Ave, for approximately 4.75 miles from 0.22 miles north of SR 180 to Shaw Ave. The DBE Contract Goal is 12% percent. Federal Project Number: STPL-5942(290)
06/24/2021 09:00 PM UTC
20-22-I Saginaw Speed Humps
The work to be done consists, in general, of installation of speed humps along Saginaw Ave between Palm and Wilson Aves for the purpose of traffic and speed mitigation.
06/14/2021 09:00 PM UTC
20-S-01 Environmental Compliance Center
The work to be done, consists, in general of the construction of a new Environmental Compliance Center with a Shade Structure, a small Office/Storage Building, a Warehouse, and associated site work as shown on the Drawings.
06/10/2021 09:00 PM UTC
41 - 50 of 72 Solicitations
1 2 3 5 7 8