General Info

Business Logo

Solicitations and notifications are free for this business.

Fresno County Department of Public Works and Planning

2220 Tulare Street 7th Floor, Fresno , CA 93721
(559) 600-9908


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-05-M
Bridge Preventive Maintenance Program Scour Mitigation The work to be done consists, in general, of the maintenance of six (6) bridges through installing new or repairing existing scour countermeasures and conducting other maintenance activities at each location. Vegetation and trash will be removed from the channel at each location and a dead tree at Location 3 will also be removed. The locations of work are as follows: • Los Gatos Road over Los Gatos Creek (Bridge No. 42C0455) • Los Gatos Road over Los Gatos Creek (Bridge No. 42C0458) • Los Gatos Road over Los Gatos Creek (Bridge No. 42C0459) • Excelsior Ave. over Fresno Slough (Bridge No. 42C0104) • Excelsior Ave over Fresno Slough Overflow (Bridge No. 42C0367) • S Alta Ave. over Travers Creek (Bridge No. 42C0179) The DBE Contract Goal is twenty-one percent (21%). Federal Project Number: BPMP-5942(240)
08/08/2025 09:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
20-09-C McCall Asphalt Concrete Overlay
The work to be done consists, in general, of placement of asphalt concrete overlays, traffic striping, and shoulder backing on McCall Ave, for approximately 4.75 miles from 0.22 miles north of SR 180 to Shaw Ave. The DBE Contract Goal is 12% percent. Federal Project Number: STPL-5942(290)
06/24/2021 09:00 PM UTC
20-22-I Saginaw Speed Humps
The work to be done consists, in general, of installation of speed humps along Saginaw Ave between Palm and Wilson Aves for the purpose of traffic and speed mitigation.
06/14/2021 09:00 PM UTC
20-S-01 Environmental Compliance Center
The work to be done, consists, in general of the construction of a new Environmental Compliance Center with a Shade Structure, a small Office/Storage Building, a Warehouse, and associated site work as shown on the Drawings.
06/10/2021 09:00 PM UTC
20-11-J 20-12-J 20-21-J Job Order Contracts General Engineering (Class A)
A Job Order Contract is an indefinite quantity contract pursuant to which the Contractor will perform an ongoing series of individual projects at different locations throughout the County of Fresno. The types of work to done may include, but is not limited to: concrete repair, culvert repair, guardrail replacement, bridge removal, bridge wing wall repair, irrigation pipe replacement, repair of failed roadway sections, repair of asphalt dike, and minor road or parking lot repairs. Work being contemplated under this Job Order Contract includes potentially Federally-funded work associated with a declared disaster (DR-4569-CA) over which the Federal Emergency Management Agency would have oversight. The bid documents include a Construction Task Catalog® containing construction tasks with preset Unit Prices. All Unit Prices are based on local labor prevailing wages, material and equipment prices and are for the direct cost of construction.
05/28/2021 09:00 PM UTC
20-20-C American Avenue and Golden State Blvd Intersection Improvements
The work to be done consists, in general, of making improvements to the intersection of American Avenue and Golden State Boulevard, including the intersections with Peach Avenue north and south of American Avenue. The existing roadway on American Avenue from SR99 to approximately 860 feet east of Peach Avenue will be reconstructed and realigned with 12-foot travel lanes, left and right turn lanes and 4-foot shoulders on each side. Golden State Boulevard will be reconstructed from approximately 1,252 feet south of American Avenue to approximately 846 feet north of American Avenue, left and right turn lanes will be added and traffic signals will be installed at the intersection of American Avenue and Golden State Boulevard. Peach Avenue will be reconstructed from American Avenue north for approximately 160 feet and from Golden State Boulevard south for approximately 320 feet. The County has pre-purchased and will provide to the Contractor the traffic signal poles, controller assembly and communication cabinet for this intersection. Union Pacific Railroad (UPRR) will perform construction at the Railroad Crossing concurrently with the intersection improvements. The contractor will be required to coordinate and obtain necessary permits from UPRR to perform work near/at the crossing, obtain a traffic encroachment permit from Caltrans for the temporary traffic control plan, and coordinate with PG&E to connect the new signal to the new meter and to relocate the UPRR service pole.
05/06/2021 09:00 PM UTC
20-17-C American Avenue Disposal Site Entrance Improvements
The work to be done consists, in general, of reconstructing and widening the America Avenue Disposal Site entrance access road, constructing a new right turn lane into the disposal site, regrading the existing ditch on the north side of the disposal site berm, excavating the ditch along the north side of American Ave from Plumas Ave to Humbolt Ave, installing two (2) 18” diameter reinforced concrete culvert pipes beneath the paved entrance, installing new chain link fences and gates, performing various electrical work including for the new gates, and replacing and lowering a segment of irrigation and leachate line.
04/29/2021 09:00 PM UTC
20-01-C Sand Creek Bridge Replacement on Ennis Road
The work to be done consists, in general, of replacing the existing bridge with a single-span, cast in place concrete box girder. The approach angles will be softened and the bridge profile will be raised. Removal of the existing bridge is included. The DBE Contract Goal is 14 percent. Federal Project Number: BRLO-5942(238) Bridge No. 42C0697
04/29/2021 09:00 PM UTC
20-J-06 20-J-07 20-J-08 Job Order Contracts General Building (Class B)
A Job Order Contract is an indefinite quantity contract pursuant to which the Contractor will perform an ongoing series of individual projects at different locations throughout the County of Fresno. The bid documents include a Construction Task Catalog® containing construction tasks with preset Unit Prices. All Unit Prices are based on local labor prevailing wages, material and equipment prices and are for the direct cost of construction.
04/29/2021 09:00 PM UTC
20-15-C James Bridge Replacements on Manning Ave
The work to be done consists, in general, of removing and replacing two structurally deficient bridges on Manning Avenue; the James Bypass Overflow East Channel Bridge (East Bridge), 3.8 miles west of State Route 145 (Bridge No. 42C0066) and the James Bypass Overflow West Bridge (West Bridge), 3.2 miles east of Colorado Avenue (Bridge No. 42C0067), east of the community of San Joaquin. The East and West replacement bridges will each have a width of 44 feet, and be 65 and 173 feet in length, respectively. The new bridge structures will consist of pre-cast, pre-stressed concrete voided slabs which will be supported by outrigger piers, pier caps, and a Cast-In-Drill-Hole concrete pile foundation. The work also includes constructing abutments, installing bridge concrete barriers, finishing the bridge decks with polyester concrete overlay, placing a hot mix asphalt concrete overlay on the roadway approaches, and installing roadway devices (crash cushions, approach guardrails, and flume over side down drains). Full street closure will be allowed for a short amount of time during the Accelerated Bridge Construction, and a detour will be provided. The DBE Contract Goal is 16% percent. Federal Project Number: BRLS-5942(233) BRIDGE NOS. 42C0691, 42C0692
04/08/2021 09:00 PM UTC
20-18-SW American Avenue Disposal Site Phase III Modules 3-8 Landfill Gas Collection and Control System Expansion
The work to be done consists, in general, of installing 23 new single depth Landfill Gas (LFG) vertical extraction wells and 15 LFG horizontal extraction wells; installing header and lateral piping to connect new extraction wells to the collection system; furnishing, installing and testing 6 condensate sumps, associated pumps and furnishing all appurtenances and performing all incidental work to effectuate the planned expansion of the site’s landfill gas collection and control system
03/11/2021 10:00 PM UTC
81 - 90 of 105 Solicitations
1 2 3 4 5 6 7 9 11