General Info

Business Logo

Solicitations and notifications are free for this business.

Fresno County Department of Public Works and Planning

2220 Tulare Street 7th Floor, Fresno , CA 93721
(559) 600-9908


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-06-C
Mt. Whitney Ave. Road Reconstruction and Shoulder Improvements Mt. Whitney Avenue between S. Marks Avenue and S. Blythe Avenue The work to be done consists, in general, of reconstruction and improvements to approximately 1.6 miles of roadway from Marks Avenue to Blythe Avenue on Mt. Whitney Avenue in the unincorporated community of Riverdale. The road, including the travel lanes, the eight-foot paved shoulder, and the parking area will be reconstructed using a Full-Depth Reclamation cement treated method. The project also includes signage and striping, excavation and construction of a retention basin, storm drain improvements, adjusting sewer manholes, water valve boxes, and other miscellaneous items. Additive 1 bid items include installation of a Pedestrian Hybrid Beacon (PHB), also known as a High-Intensity Activated Crosswalk (HAWK) system, at the intersection of Mt. Whitney Avenue and Feland Avenue with necessary civil work as shown in the plans. There is no DBE Contract Goal. Federal Project Number: CPFL-5942(314)
11/06/2025 10:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
22-24-J, 22-25-J, 22-26-J General Engineering Job Order Contract (Class A)
A Job Order Contract is an indefinite quantity contract pursuant to which the Contractor will perform an ongoing series of individual projects at different locations throughout the County of Fresno. The types of work to done may include, but is not limited to: concrete repair, culvert repair, guardrail replacement, bridge removal, bridge wing wall repair, irrigation pipe replacement, repair of failed roadway sections, repair of asphalt dike, and minor parking lot repairs. Work being contemplated under the Job Order Contract may include potentially Federally-funded work associated with a declared disaster over which the Federal Emergency Management Agency would have oversight. The bid documents include a Construction Task Catalog® containing construction tasks with preset Unit Prices. All Unit Prices are based on local labor prevailing wages, material and equipment prices and are for the direct cost of construction. A MANDATORY pre-bid conference has been held at 10:00 A.M. on Tuesday, March 21, 2023 for the purpose of discussing the Job Order Contract concept, documents, bid considerations and to discuss Job Order Contracting from a contractor's viewpoint. Contractors that do not sign in and attend the pre-bid conference will be ineligible, and any bid submitted by such a contractor will be determined non-responsive. The MANDATORY pre-bid conference was conducted virtually, and the link to the meeting was posted at http://www.co.fresno.ca.us/planholders
04/18/2023 09:00 PM UTC
22-J-02, 22-J-03, 22-J-04 General Building Job Order Contract (Class B)
A Job Order Contract is an indefinite quantity contract pursuant to which the Contractor will perform an ongoing series of individual projects at different locations throughout the County of Fresno. The bid documents include a Construction Task Catalog® containing construction tasks with preset Unit Prices. All Unit Prices are based on local labor prevailing wages, material and equipment prices and are for the direct cost of construction. A MANDATORY pre-bid conference was held at 10:00 a.m., on Tuesday, March 21, 2023 for the purpose of discussing the Job Order Contract concept, documents, bid considerations and to discuss Job Order Contracting from a contractor’s viewpoint. The MANDATORY pre-bid conference was held online (the link for which was posted at http://www.co.fresno.ca.us/planholders).
04/13/2023 09:00 PM UTC
PWP23-010
Consultant Services For Housing Trust Services Fresno County Department of Public Works and Planning is seeking a qualified consultant to perform a feasibility study of the creation of an affordable housing trust fund (AHTF) and the option to create the documents necessary for the formation of a AHTF in the County of Fresno.
04/03/2023 11:00 PM UTC
22-05-C Dry Creek Bridge Replacement on Burrough Valley Road
The work to be done consists, in general, of the replacement of the Dry Creek Bridge and box culvert on Burrough Valley Road, south of the community of Tollhouse and approximately 25 miles northeast of the City of Fresno. The existing bridge would be removed to accommodate a replacement structure measuring 35 feet 6 inches wide by 114 feet long; the replacement structure would accommodate two 12-foot-wide traffic lanes, two 4-foot-wide shoulders, and two Type 836 concrete barriers. The replacement culvert would consist of a two cell 6-foot high (4-foot clear) by 12-foot wide (12-foot clear) precast concrete box culvert structure. During construction, traffic on Burrough Valley Road would be maintained through the construction of a temporary creek crossing downstream of the existing bridge. The crossing would be located approximately 110 feet south of the southwestern corner of the existing bridge span, connecting Tollhouse Road to Burrough Valley Road.
03/20/2023 09:00 PM UTC
22-21-C RMO Yard Area 8 Fence Reconstruction
The work to be done consists, in general, of the reconstruction of the fence and two access gates surrounding the Area 8 Maintenance and Operations yard, which is south of Olive and in between Highland Ave and McCall Ave on 9525 E. Olive Ave. in Sanger. Prior to the installation of the chain link fence, existing fence and wood fence posts need to be removed and disposed of. The existing fence consists of barbed wire on wood with most areas on metal posts. The 2 access gates will need to provide for 16 feet wide openings. The chain link fence will be 6 feet tall with barbed wire along the top.
02/16/2023 10:00 PM UTC
22-18-M Crack Seals
The work to be done consists, in general, of 178 lane miles of crack sealing. Several additive locations are proposed for up to 17 lane miles of crack sealing within County Service Areas.
01/19/2023 10:00 PM UTC
22-20-C Dry Creek on Burrough Valley Road Tree Removal
The work, in general, consists of removal and proper disposal of 45 native trees located within the project limits of the Dry Creek Bridge Replacement Project on Burrough Valley Road, just east of Tollhouse Road. All debris generated by the felling and removal of trees must be removed. The roadway must be kept free from debris at all times. Installation of Temporary Fence (Type ESA) may be required prior to beginning onsite work. The DBE Contract Goal is 0 percent. Federal Project Number: BRLS-5942(245)
12/01/2022 10:00 PM UTC
22-09-C Ashlan Avenue and Palm Avenue Traffic Signal and Road Improvements
The work to be done consists, in general, of fully replacing the existing traffic signal, removing an existing drain inlet and several trees, and reconstructing the pavement at the intersection of Palm Avenue and Ashlan Avenue. The work will also include cold planing and overlaying, installing four (4) new concrete curb ramps, replacing, and installing the new curb and gutter, installing approximately 140 lineal feet of sidewalk, and signing, striping and pavement marking. The work will also involve coordination with existing utility companies and the City of Fresno. The intersection shall remain open during the entire duration of the project. The DBE Contract Goal is 20 percent. Federal Project Number: HSIPL 5942(294)
10/13/2022 09:00 PM UTC
22-14-C Golden State Boulevard Phase 1
The work to be done consists in general of improvements along Golden State Boulevard for approximately 14.1 miles from south of American Avenue to Mission Street in Kingsburg through Cities of Fowler, Selma, Kingsburg, and unincorporated areas of the County. The work will include pavement rehabilitation using an on-site Cold Central Plant Recycling technique, cement-treated base, laying hot-mix asphalt, excavation and trenching, intersection signalization and channelization, installing end terminals and wood post guardrails, striping, pipe installation, sidewalk installation and replacement, installation of street lights, landscaping including tree removals, and other items as specified in the plans and specifications. The project requires a ninety (90) days plant establishment period per Standard Specifications and Special provisions. The plans are divided into three sets, one for each region, however they will be constructed as one project. Intersection and signal work involving Union Pacific Railroad will be bid as Phase 2 of this project at a later time.
10/06/2022 09:00 PM UTC
22-07-C West Park Pedestrian Pathway
The work to be done consists, in general, of installing an asphalt concrete pedestrian pathway, ramps and appropriate signage along Valentine Avenue from the community of West Park to West Park Elementary School. Adjustment of water meter boxes will be required as part of the work. Installation of a pedestrian crossing flashing sign with all appurtenant electrical work including coordination with PG&E Rule 16. The DBE Contract Goal is 21 percent. Federal Project Number: ATPSB1L-5942(301)
10/06/2022 09:00 PM UTC
61 - 70 of 108 Solicitations
1 2 3 4 5 7 9 10 11