General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-24-2
DPW Asphalt Maintenance-------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces as specified at the following locations: - Idlewild Pines Rd (R09C036) Slidell, LA; - Old Bayou Liberty Rd (R09H035) Slidell, LA; - Preachers Oak Ln (R09G064) Slidell, LA; - Robert Ln (R09G024) Slidell, LA; - Terrell Dr (R09H005) Slidell, LA; - Dorman King Rd (R05D020) Bush, LA; - Lake St (R10F034) Abita Springs, LA; - Branch Crossing Dr (R03H018) Covington, LA; - Camellia Dr (R03K084) Covington, LA; - Adolphus Rd South (R02Q011) Covington, LA; - Green Leaf Ln (R02P033) Covington, LA; - 8th St (R09I014) Slidell, LA; - Emile St (R09D030) Slidell, LA; - Joan Dr (R08A018) Pearl River, LA; - Salmen Ave (R09I015) Slidell, LA; - Slidell Ave (R09I011) Slidell, LA; - Lohman Rd (R07C018) Lacombe, LA; - St James St (R07G045) Lacombe, LA; - N Woodlake Way (R08H036) Pearl River, LA; - S Woodlake Way (R08H037) Pearl River, LA; and - Tammany Trace (R11A001) Abita Springs, LA.
08/12/2025 07:00 PM UTC
25-25-2
Hoover Drive & Lawes St. Improvements---------------The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 3,900 linear feet of asphaltic concrete along Hoover Dr and approximately 1,970 linear feet of asphaltic concrete along Lawes St. The project will also include the installation of surbsurface drainage improvements, as well as radius improvements at the intersection of Hoover Dr and Lawes St, in addition to new striping and replacment of signage. This work, as specified in these documents and construction plans, is located along Hoover Dr (R08M007) Section 12-13, Township 9S, Range 14E, and Lawes St (R08M005) Section 12, Township 9S, Range 14E, Slidell, LA 70461.
08/20/2025 07:00 PM UTC
25-26-2
One-Time Purchase of Electric Apparatus--------------------------------------St. Tammany Parish Government Department of Utilities is seeking bids for a one (1) time purchase of electrical apparatuses. All products shall be new, unused, and of current manufacture.
08/21/2025 07:00 PM UTC
25-23-2
Justice Center Cooling Tower---------------------Contractor shall provide the necessary labor, supervision, equipment, tools, and materials as required for the removal and replacement of the existing cooling tower located at the St.Tammany Justice Center, located at 701 N. Columbia St., Covington, LA 70433.
09/03/2025 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
460-00-17-24-2
Safe Haven Handicap Day Center Rehab.......Site,Exterior and interior renovations to an existing building. Work to include, but not limited to civil, architectural, mechanical and electrical labor as indicated on construction documents.
04/12/2017 07:00 PM UTC
304-00-17-19-2
2017 District 1&4 Road Improvements................This is a District Capital Road Improvement project for Districts 1 & 4. The Contractor must provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and/or milling and overlaying roads as specified along Oak Park Dr. (R01I004) Section 16 Township 8S Range 10E; Perrilloux Rd (R01I001) Section 16 Township 7S Range 10E; Wager Cemetery Rd (R01I002) Section 9 Township 7S Range 10E; Black River Dr. (R01J042) Section 42 Township 7S Range 10E. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
04/11/2017 07:00 PM UTC
318-00-17-23-2
Fairgrounds Phase 3
04/11/2017 07:00 PM UTC
307-00-17-14-2
Wax Wing Canal Improvements --------------------- The Contractor must provide all labor, equipment, tools, and materials necessary to improve drainage by grading banks to proper slope and installing armormax anchored reinforced vegetation system as specified along Wax Wing Canal (D04EW01174) Section 55 Township 8S Range 11E.
04/07/2017 07:00 PM UTC
303-00-17-10-2
2017 District 3 Road Improvements ------ This is a District Capital Road Improvement Project for District 3. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing them as specified along Birch Dr (R02K026) Section 21 Township 5S Range 10E; Gottschalk Rd (R01A002) Section 19 Township 6S Range 10E; N Hay Hollow (R02F027) Section 4 Township 5E Range 10E; Penn Mill Lakes Blvd (R03D031) Section 13 Township 6S Range 10E; and Savannah Rd (R01G001) Section 4 Township 7S Range 10E.
04/04/2017 07:00 PM UTC
307-00-17-22-2
2017 District 7 Road Improvements-----------This is a District Capital Road Improvement Project for District 7. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Cedar Dr. (R04F038) Section 7 Township 7S Range 12E; Elm St (R04F039) Section 7 Township 7S Range 12E; Hemlock Dr. (R04F037) Section 7 Township 7S Range 12E; Joans St (R04E056) Section 1 Township 8S Range 11E; Labarre St (R04E026) Section 38 Township 8S Range 11E; and Redwood Dr. (R04F040) Section 7 Township 7S Range 12E . The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of the project is sixty (60) calendar days + Calculated Rain Days per attached specifications.
04/04/2017 07:00 PM UTC
015-05-17-17-2
Road Signs
03/23/2017 07:00 PM UTC
015-60-17-16-2
Windshield Repair/ Replacement
03/23/2017 07:00 PM UTC
316-00-17-11-2
Cross Gates Pond Improvements................................. This is a 2017 Capital Drainage Improvement Project for District 9. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve drainage by installing a concrete wet well, a submersible pump, associated drainage equipment/features, related mechanical and electrical equipment, and embankment as specified at the Cross Gates Pond (P08LW01069) Section 38 Township 9S Range 15E.
03/21/2017 07:00 PM UTC
306-00-17-09-2
2017 District 6 Road Improvements..................................... This is a District Capital Road Improvement Project for District 6. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and milling and overlaying as specified along Becky Lake Dr (R06C010) Section 40 Township 6S Range 14E; Chat Ct (R05B044) Section 27 Township 5S Range 12E; Dolph Gaines (R06E009) Section 27 Township 7E Range 14E; Marcus Rd (R05G026) Section 33 Township 4S Range 13E; O Wager Rd (R10B017) Section 10 Township 6S Range 12E; S Davis Rd (R10B016) Section 10 Township 6S Range 12E; Tot Polk Rd (R06I013) Section 39 Township 6S Range 14E; Warrior Trace (R02U003) Section 11 Township 5S Range 11E; and Wilson Ln (R06I012) Section 38 Township 6S Range 14E.
03/15/2017 07:00 PM UTC
641 - 650 of 897 Solicitations
1 2 61 62 63 65 67 68 69 89 90