General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-6-2
Alton Water Systems Interconnect ----The work includes the construction of an interconnecting pipeline, approximately one thousand six hundred (1,600) linear feet in length, to provide a connection between the Alton Water System and an adjacent privately owned utility. All work shall be performed in accordance with the Contract Documents and as further detailed in the technical specifications.
10/07/2025 07:00 PM UTC
25-51-1
Madewood Dr Drainage----The Parish requests a contractor to improve drainage by removing and replacing failed subsurface drainage, removing and replacing driveways, and installing new catch basins located on Madewood Dr (R04D089); as specified, in Mandeville, Louisiana 70471.
10/07/2025 07:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
300-00-17-36-2
Dove Park Rd. Mill and Overlay ---------- This is a 2017 Capital Road Improvement Project. The work specified in this project will require the Contractor to provide all labor, equipment, and materials necessary to improve road surfaces by milling and overlaying 2” of asphaltic concrete and installing roadway striping as specified along Dove Park Rd (R04D001) Section 25 Township 7S Range 11E.
06/13/2017 07:00 PM UTC
622-10-17-35-2
Submersible Pump Annual.....The Parish, as a function of Tammany Utilities, owns and operates approximately 50 wastewater treatment plants, 40 water wells, over 200 sewage lift stations and miles of water distribution and sewage collection lines. Tammany Utilities, therefore, routinely has the need for submersible pumps.
06/08/2017 07:00 PM UTC
315-05-17-38-2
2017 District 6 Road Improvements ---------- This is a District Capital Road Improvement Project for District 6. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing road surfaces, as specified, along Sunny Meadow Dr (R10F003) Section 28 Township 6S Range 12E ; and Keen Rd (R10F002) Section 28 Township 6S Range 12E.
06/06/2017 07:00 PM UTC
313-00-17-41-2
Ranch Rd. Drainage Ph 1...... The Contractor will provide all labor, equipment, tools, and materials necessary to improve drainage by the removal of existing drainage structures and drives and for the installation of drainage structures, drives, and pavement patching.
06/06/2017 07:00 PM UTC
300-00-17-40-2
Tchefuncte Parc Bridge at Black River.....The Contractor must provide all labor, equipment, tools, and materials necessary for the removal of timber trestle bridge on timber piles, asphalt paving, installation of class II base course, prcb culvert, concrete headwalls, and incidental sanitary sewer relocation.
05/31/2017 07:00 PM UTC
622-10-17-34-2
Sewer and Appurtenances Annual
05/17/2017 07:00 PM UTC
302-00-17-32-2
Woodland Dr Road Improvements.......................................... The Contractor must provide all labor, equipment, tools, and materials necessary to improve the road by reconstructing the road surface and applying an asphalt reinforcement grid, as specified.
05/16/2017 08:02 PM UTC
300-00-17-30-2
Clipper Drive Bridge..... The Contractor will provide all labor, equipment, tools, and materials necessary for the demolition of a single span slab span bridge and retaining walls and construction of a precast 3-span slab span bridge and sheet pile retaining walls, and all associated earthwork. The work includes riprap, concrete approach slabs, concrete approach pavement with class II base course and guardrails.
05/09/2017 07:00 PM UTC
310-00-17-33-2
2016 District 10 Road Improvements ---------- The Contractor must provide all labor, equipment, tools, and materials necessary to improve the road by reconstructing road surfaces as specified. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time for completion is forty-five (45) days from the date specified in the Notice to Proceed + Calculated Rain Days per the attached specifications.
05/09/2017 07:00 PM UTC
622-10-17-15-2
Utility Construction and Maintenance Contract
05/04/2017 07:00 PM UTC
631 - 640 of 909 Solicitations
1 2 60 61 62 64 66 67 68 90 91