We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 57-1-2016
2016 SANITARY MANHOLE REHABILITATION
05/05/2016 03:30 PM UTC
OFFICIAL NOTICE 58-1-2016
WATER MAIN RELAYS, located at the following locations: Water Main Relays – W. Hadley St. (WT410160610), N. 88th St. to N. 89th St. (11 working days); N. 88th St. (WT410160612), W. Center St. to W. Hadley St. (18 working days); N. 86th St. (WT410160613), W. Hadley St. to W. Locust St. (17 working days); N. 98th St. (WT410160660), W. Center St. to W. Tower View Blvd. (33 working days)
05/02/2016 03:30 PM UTC
OFFICIAL NOTICE 52-1-2016
COMBINED SEWER MAINS RELAY AND COMBINED SEWER LINING, REPAIR AND MANHOLE REPAIR AND LINING in: N. 26th St. – W. Center St. to 300' ± North of W. Center St. W. Center St. – N. 25th St. to N. 26th St. W. Center St. – N. Sherman Blvd. to N. 52nd St. W. Chambers St. – N. 26th St. to N. 27th St.
04/29/2016 03:30 PM UTC
OFFICIAL NOTICE 26-1-2016
CONSTRUCTION OF 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7”CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, AND SEWER WORK, ETC.; Located at: (ST211060138) - S. 25th St. - W. National Ave. to W. Pierce St. (ST211160109) - S. 23rd St. - W. National Ave. to W. Pierce St.
04/28/2016 03:30 PM UTC
OFFICIAL NOTICE 39-1-2016
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING, CONCRETE PAVEMENT AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: (ST211160106) - N. Maryland Ave. - E. Newberry Blvd. to E. Kenwood Blvd.
04/22/2016 03:30 PM UTC
OFFICIAL NOTICE 48-1-2016
WATER MAIN RELAYS, located at the following locations: W. Woolworth Ave. (WT410160001), N. 46th St. to 690’ W/O N. 46th St. (17 Working Days); W. Maxwell Pl. (WT410160605), N. 52nd St. to W. Fond du Lac Ave. (14 Working Days); N. 68th St. (WT410160672), W. Fond du Lac Ave. to W. Stark St. (13 Working Days); N. 67th St. (WT410160673), W. Stark St. to W. Villard Ave. (43 Working Days); W. Fairmount Ave. (WT410160675), N. 62nd St. to N. 63rd St. (10 Working Days); W. Stark St. (WT410160676), N. 67th St. to N. 68th St. (14 Working Days).
04/21/2016 03:30 PM UTC
OFFICIAL NOTICE 50-1-2016
WATER MAIN RELAYS, located at the following locations: W. Congress St. (WT410160630), N. 99th St. to N. 100th St. (10 Working Days); N. 98th St. (WT410160650), W. Capitol Dr. to 85’ N/O W. Sarasota Pl. (11 Working Days); N. 95th St. (WT410160651), W. Sarasota Pl. to W. Fiebrantz Ave. (13 Working Days); N. 99th St. (WT410160667), W. Vienna Ave. to W. Metcalf Pl. (16 Working Days); N. 95th St. (WT410160694) 170’ N/O W. Concordia Ave. to W. Townsend St. (14 Working Days)
04/21/2016 03:30 PM UTC
OFFICIAL NOTICE 22-1-2016
CONSTRUCTION OF 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7”CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, AND SEWER WORK, ETC.; Located at: (ST211140129) - N. 32nd St. - W. Lisbon Ave. to W. North Ave.
04/19/2016 03:30 PM UTC
OFFICIAL NOTICE 24-1-2016
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.;Located at: (ST211150173) - N. Holton St. - E. Capitol Dr. to E. Hope Ave. (ST211150174) - E. Hope Ave. - N. Richards St. to N. Holton St.
04/18/2016 03:30 PM UTC
OFFICIAL NOTICE 28-1-2016
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING CONCRETE PAVEMENT, 5”, 7” AND 8” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: (ST211040107) - W. Woolworth Ave. - N. Sherman Blvd. to N. 51st St.
04/15/2016 03:30 PM UTC
1051 - 1060 of 1476 Solicitations