General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 75-1-2017
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, INSTALLATION OF PERMEABLE PAVERS, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST212060105 – Alley BB- W. Chambers St., W. Locust St., N. 76th St., & N.77th St. (Permeable Alley Pavement) ST212010143 – Alley BB- W. Auer Av., W. Concordia Ave., N. 87th St., & N. 88th St. (Permeable Alley Pavement) ST212080102 – Alley BB- W. Keefe Ave., W. Medford Ave., W. Roosevelt Dr., N. 45th St. & W. Scranton Pl. (Permeable Alley Pavement) ST212160113 – Alley BB- Auer Av., W. Burleigh St., N. 54th St., & N. 55th St. (Nth/Sth Leg) (Permeable Alley Pavement) ST212160102 – Alley between W. Capitol Dr., W. Melvina St., N. 64th St. & N. 65th St. (Concrete Alley Pavement)
07/05/2017 03:30 PM UTC
OFFICIAL NOTICE 84-1-2017
THE INSTALLATION OF CUC MANHOLES, ENCASED NONMETALLIC CONDUIT, CONSTRUCTION OF TEMPORARY 3” CONCRETE, 5” CONCRETE WALK, CONCRETE REMOVALS, ETC.; Located at: TD04884042 - W. Juneau Ave. - N. Old World Third St. to N. 4th St.; N. 4th St – W. Highland Ave. to W. Juneau Ave.; N. 5th St. - W. Juneau Ave. to Parking Structure
07/03/2017 03:30 PM UTC
OFFICIAL NOTICE 40-1-2017
PERFORM COMPLETE TEAR-OFF OF METER SHOP ROOF AT 3929 W. CAMERON AVENUE. PROVIDE BUILT-UP ROOF, FASCIA AND MISCELLANEOUS ITEMS
06/29/2017 03:30 PM UTC
OFFICIAL NOTICE 69-1-2017
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, INSTALLATION OF PERMEABLE PAVERS, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST212160116 – Alley BB- W. Burnham St., Rogers St., S. 12th St., & S. 13th St. (Concrete Alley Pavement) ST212140104 – Alley BB- W. Greenfield Ave., S. Layton Blvd., W. Scott St., & S. 28th St. (Permeable Alley Pavement) ST212160110 – Alley BB- W. Main St., S. 61st St., S. 62nd St., & Lands North (Permeable Alley Pavement) ST212060106 – Alley between W. Cleveland Ave., W. Montana St., S. 49th St., & S. 50th St. (Permeable Alley Pavement)
06/27/2017 03:30 PM UTC
OFFICIAL NOTICE 85-1-2017
LEAD SERVICE LINE REPLACEMENT, at 20 locations, by qualified City of Milwaukee licensed and bonded contractors (40 working days). Locations will be at various sites throughout the City of Milwaukee.
06/22/2017 03:30 PM UTC
OFFICIAL NOTICE 27-1-2017
SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY, COMBINED, AND STORM SEWER MAIN LINING, & MANHOLE REPAIR AND LINING IN: S. Chase Ave. – 70’+/- S. of S. 5th Place to S. 6th St., N. Green Bay Ave. – N. 13th St. to W. Congress St., W. Juneau Ave. – 160’+/- W. of N 46th St to 255’+/- W. of N. 46th St.
06/21/2017 03:30 PM UTC
OFFICIAL NOTICE 27-2-2017
COMBINED SEWER MAIN RELAY, & COMBINED SEWER MAIN LINING, & MANHOLE REPAIR AND LINING in: Alley W. of N. Milwaukee St. – E. Michigan St. to 120’+/- N. of E. Michigan St.; N. Jackson St. – 180’+/- S. of E. St. Paul Av. to E. St. Paul Av.; N. James Lovell St. – 215’+/- S. of W. State St. to W. State St.; W. Wells St. – N. 6th St. to N. 8th St.
06/21/2017 03:30 PM UTC
OFFICIAL NOTICE 74-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 9” CONCRETE PAVEMENT, 8” CONCRETE BASE, VARIABLE THICKNESS CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, 7” HIGH EARLY STRENGHT CONCRETE, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST21160108 - N. Maryland Ave. - N. Prospect Ave. to E. Newberry Blvd.
06/20/2017 03:30 PM UTC
OFFICIAL NOTICE 79-1-2017
CONSTRUCTION OF 5 INCH CONCRETE WALKS, 7 INCH CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, DETECTABLE WARNING FIELDS, AND CONCRETE WALKS, DRIVEWAYS, AND CONCRETE CURB AND GUTTER REMOVALS, ETC.; Located at: (ST230170154) Scatter Sites Sidewalk Replacements – 2017 At Various Locations City Wide
06/15/2017 03:30 PM UTC
OFFICIAL NOTICE 76-1-2017
WATER MAIN RELAYS at the following locations: W. Ohio Ave. (WT410170600), 220 Ft. E/O S. 51st St. to S. 51st St. (11 working days); S. 66th St. (WT410170644), W. Ohio Ave. to W. Morgan Ave. (29 working days); S. 67th Ct. (WT410170645), 300 Ft. N/O W. Euclid Ave. to W. Euclid Ave. (8 working days); W. Euclid Ave. (WT410170646), S. 63rd St. to S. 68th St. (54 working days); S. 63rd St. (WT410170647), W. Oklahoma Ave. to W. Burdick Ave. (23 working days); W. Ohio Ave. (WT410170648), S. 60th St. to S. 63rd St. (17 working days); W. Bennett Ave./S. 57th St. (WT410170656), S. 57th St. to S. 60th St. (18 working days) (Note: Contractor to furnish and install approximately 6,385 lin. ft. of 8”, 6” and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/15/2017 03:30 PM UTC
1031 - 1040 of 1601 Solicitations
1 2 100 101 102 104 106 107 108 160 161