General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 93-1-2017
LEAD SERVICE LINE REPLACEMENT, at 100 locations, by qualified City of Milwaukee licensed and bonded contractors. Locations will be at various sites throughout the City of Milwaukee
07/27/2017 03:30 PM UTC
OFFICIAL NOTICE 90-1-2017
WATER MAIN RELAYS, INTERNAL JOINT SEALS AND ABANDONMENTS at the following locations: N. Van Buren St. (WT410160719), E. Michigan St. to E. Wisconsin Av. (5 working days); N. 4th St. (WT410160781), W. State St. to W. Juneau Av. (28 working days); W. Juneau Av. (WT410170622), Old World Third St. to 200’ W/O N. 6th St. (35 working days); W. Highland Av. (WT410170623), Old World Third St. to N. 4th St. (11 working days); N. 6th St. (WT410170625), W. Highland Av. to W. Juneau Av. (15 working days); E. Michigan St. (WT410170722), N. Jackson St. to N. Van Buren St. (13 working days). Note: Contractor to furnish and install approximately 2,571 lin. ft. of 12”, 8” and 6” ductile iron pipe. Contractor to furnish and install approximately 481 lin. ft. of 30” ductile iron pipe. Contractor to install approximately 40 lin. ft. of 36”, 24” and 20” ductile iron pipe. Contractor to prepare and permanently seal approximately 30 interior joints of 36” water main and 38 interior joints of 30” water main. City to furnish miscellaneous materials as shown on plans and proposal form.
07/26/2017 03:30 PM UTC
OFFICIAL NOTICE 55-1-2017
SANITARY AND COMBINED SEWER MAIN RELAY, & STORM SEWER MAIN LINING, & MANHOLE REPAIR AND LINING in: S. Austin St. – E. Morgan Ave. to E. Warnimont Ave. S. Kinnickinnic Ave. – E. Ohio Ave. to 110' S. of E. Ohio Ave. E. Layton Ave. – S. Howell Ave. to S. Burrell St. S. Taylor Ave. – S. Whitnall Ave. to E. Bolivar Ave. S. Whitnall Ave. – S. Quincy Ave. to S. Pine Ave.
07/25/2017 03:30 PM UTC
OFFICIAL NOTICE 3-1-2017
CONSTRUCTION OF 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” & 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKINGS, CONCRETE REMOVALS, TRACK ZONE REMOVALS, AND SEWER WORK, ETC.; Located at: (ST211120171) E. Nash St. - N. Fratney St. to N. Holton St. (Elimination of RR X-ings)
07/21/2017 03:30 PM UTC
OFFICIAL NOTICE 82-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, ETC.; Located at: (ST211151165) – N. 53rd St. – W. Roosevelt Dr. to W. Keefe Ave. (1 Speed Hump) (ST211170175) – S. 8th St. – W. Madison St. to W. Scott St. (1 Speed Hump) (ST211170144) – S. 11th St. – W. Oklahoma Ave. to W. Montana St. (3 Speed Humps) (ST211170111) – N. 19th Pl. – W. Stark St. to W. Fairmont Ave. (1 Speed Hump) (ST211170108) - N. 19th St. – W. Hampton Ave. to W. Stark St.. (1 Speed Hump) (ST211170109) – N. 19th St. – W. Stark St. to W. Fairmount Ave. (I Speed Hump) (ST211170107) – S. 19th St. – W. Burnham St. to W. Mitchell St. (1 Speed Hump) (ST211170112) – N. 28th St. – W. Chambers St. to W. Burleigh St. (1 Speed Hump) (ST211170136) – N. 28th St. – W. Locust St. to W. Chambers St. (1 Speed Hump) (ST211170143) – S. 30th St. – W. Hayes Ave. to W. Lincoln Ave. (1 Speed Hump) (ST211170189) – S. 30th St. – W. Lapham Blvd. to W. Orchard St. (1 Speed Hump) (ST211170188) – S. 31st St. – W. Grant St. to W. Becher St. (1 Speed Hump) (ST211170157) – N. 34th St. – W. Park Hill Ave. to W. St. Paul Ave. (2 Speed Humps) (ST211150195) – N. 36th St. – W. Thurston Ave. to W. Florist Ave. (3 Speed Humps) (ST211170131) – S. 36th St. – W. National Ave. to W. Pierce St. (1 Speed Hump) (ST211170113) – N. 38th St. – W. Villard Ave. to W. Rohr Ave. (1 Speed Hump) (ST211160145) – N. 39th St. – W. Silver Spring Dr. to W. Florist Ave. (4 Speed Humps) (ST211170114) – N. 40th St. – W. Roosevelt Dr. to W. Capitol Dr. (1 Speed Hump) (ST211170115) – N. 42nd St. – W. Thurston Ave. to W. Florist Ave. (3 Speed Humps) (ST211170137) – N. 44th St. – W. Hadley St. to W. Locust St. (1 Speed Hump) (ST211170116) – N. 46th St. – W. Glendale Ave. to W. Hampton Ave. (2 Speed Humps) (ST211170119) – N. 54th Blvd. – W. Keefe Ave. to W. Melvina St. (3 Speed Humps) (ST211170118) - N. 54th St. – W. Roosevelt Dr. to W. Keefe Ave. (2 Speed Humps) (ST211170106) - N. 56th St. – W. Wright St. to W. Clarke St. (1 Speed Hump) (ST211170184) – N. 75th St. – W. Beckett Ave. to W. Marion St. (1 Speed Hump) (ST211130156) – N. Buffum St. – E. Clarke St. to E. Center St. (1 Speed Hump) (ST211160136) – W. Congress St. – N. 22nd St. to N. Teutonia Ave. (2 Speed Humps) (ST211170120) – N. Grant Blvd. – W. Clarke St. to W. Center St. (1 Speed Hump) (ST211170124) – W. McKinley Ave. – N. 18th St. to N. 19th St. (1 Speed Hump) (ST211160148) – W. Medford Av. – W. Congress St. to W. Baldwin St. (2 Speed Humps) (ST211170105) – W. Michigan St. – N. 32nd St. to N. 33rd St. (1 Speed Hump) (ST211170128) – W. Scott St. – S. 30th St. to S. 31st St. (1 Speed Hump) (ST211170127) – E. Smith St. – S. Howell Ave. to S. Burrell St. (2 Speed Humps)
07/20/2017 03:30 PM UTC
OFFICIAL NOTICE 87-1-2017
KEENAN HEALTH CENTER ELEVATOR MODERNIZATION 3200 NORTH 36TH STREET MILWAUKEE WI
07/14/2017 03:30 PM UTC
OFFICIAL NOTICE 86-1-2017
Epoxy polymer overlay to the North and South 6th Street cable stay sidewalks and West Vliet Street over CPRW
07/13/2017 03:30 PM UTC
OFFICIAL NOTICE 88-1-2017
ASPHALT PARKING LOT REPAIR AT SAFETY ACADEMY 6680 N TEUTONIA AVE MILWAUKEE WI
07/10/2017 03:30 PM UTC
OFFICIAL NOTICE 89-1-2017
FLOATING ISLANDS AT HARTUNG QUARRY PARK
07/06/2017 03:30 PM UTC
OFFICIAL NOTICE 70-1-2017
WATER MAIN RELAYS at the following locations: N. 80Th St. (WT41017069), W. Congress St. to W. Ruby Ave. (11 working days); W. Potomac Ave. (WT410170610), W. Ruby Ave. to W. Courtland Ave. (42 working days); S. Herman St. (WT410170652), E. Doty Pl. to S Whitnall Ave. (12 working days); E. Waterford Ave. (WT410170654), S. Lenox St. to S. Herman St. (15 working days); N. 84Th St (WT410170675), W. Courtland Ave to W. Hampton Ave (30 working days); W. Ruby Ave. (WT410170677), N. 82nd. to N. 83Rd St (12 working days); (Note: Contractor to furnish and install approximately 4,767 lin. ft. of 16”, 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
07/05/2017 03:30 PM UTC
1021 - 1030 of 1601 Solicitations
1 2 99 100 101 103 105 106 107 160 161