General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 12-1-2026
The general work requested is: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC. Located at: ST216260101 – 2026 HIP Group 2 (North-West) N. 74th St. - W. Beckett Av. to W. Congress St. N. 79th St. - W. Vienna Av. to W. Melvina St. N. 84th St. - W. Cheyenne St. to W. Helena St. N. 99th St. - W. Appleton Av. to Point north of W. Carmen Av. W. Caldwell Ct. - W. Medford Av. to a Point West of W. Medford Av. W. Fairmount Av. - N. Green Bay Av. to N. Teutonia Av. (retain speed humps) N. Granville Rd. - W. Bradley Rd. to N. 107th St. (paved pedestrian lane on one side) W. Helena St. - N. 84th St. to N. 86th St. W. Lancaster Av. - N. 37th St. to N. Hopkins St. W. Leon Tr. - N. 76th St. to W. Silver Spring Dr. W. Medford Av. - W. Villard Av. to W. Sheridan Av. W. Park Pl. - N. 107th St. to N. 110th St. W. Stark St. - N. Sherman Bl. to N. 47th St.
05/11/2026 03:30 PM UTC
OFFICIAL NOTICE 52-1-2026
CONCRETE SURFACE REPAIRS AND PAINTING OF THE LOWER LEVEL OF MACARTHUR SQUARE PARKING STRUCTURE.
05/12/2026 03:30 PM UTC
OFFICIAL NOTICE 13-1-2026
The general work requested is: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC. Located at: ST216260102 – 2026 HIP Group 3 (East) N. 6th St. - N. Dr. Martin L. King Jr. Dr. to point north of W. Melvina St. N. 33rd St. - W. Center St. to W. Locust St. N. 33rd St. - W. North Av. to W. Meinecke Av. (retain speed humps) N. 42nd St. - W. Congress St. to W. Courtland Av. E. Albion St. - N. Farwell Av. to N. Warren Av. E. Concordia Av. - N. Humboldt Bl. to N. Pierce St. N. Hackett Av. - E. Kenwood Bl. to E. Hartford Av. N. Jefferson St. - E. Knapp St. to E. Ogden Av. (retain speed hump) W. Kilbourn Av. - N. 35th St. to point west of N. 38th St. E. Knapp St. - N. Jefferson St. to N. Broadway (retain speed hump) W. Mc. Kinley Av. - N. 21st St. to N. 26th St. (retain speed humps) W. Nash St. - W. Scranton Pl. to N. 51st Bl. E. Park Pl. - N. Lake Dr. to N. Downer Av. W. Richardson Pl. - N. 27th St. to N. 29th St. (retain speed humps) N. Summit Av. - E. Kane Pl. to E. North Av. W./N. Toronto St. - N. 35th St. to W. Hope Av. W. Wright St. - N. Teutonia Av. to N. 19th St.
05/13/2026 03:30 PM UTC
OFFICIAL NOTICE 40-1-2026
Granville Station Public Water Main Extension/Private Water Loop Extension - West Menard Road/North 80TH Street/8110 & 8120 West Brown Deer Road/Former Northridge Mall Property, Milwaukee, WI.
05/15/2026 03:30 PM UTC
OFFICIAL NOTICE 59-1-2026
Remote Bridge Upgrades at Multiple Structures over Milwaukee River
05/19/2026 03:30 PM UTC
OFFICIAL NOTICE 54-1-2026
PROJECT NO.1: SANITARY SEWER LATERAL AND LEAD SERVICE LINE REPLACEMENT & SUMP PUMP INSTALLATION IN: Area Bounded by North 54th Street to North 58th Street and West Vienna Avenue to West Capitol Drive
05/20/2026 03:30 PM UTC
OFFICIAL NOTICE 54-2-2026
PROJECT NO.2: SANITARY SEWER MANHOLE INSPECTION: Located at: Various Locations within the City of Milwaukee
05/20/2026 03:30 PM UTC
OFFICIAL NOTICE 31-1-2026
The general work requested is: THE INSTALLATION OF NON-INTRUSIVE DETECTION CAMERAS AT EXISTING SIGNALIZED INTERSECTIONS. Non-Intrusive Detection Grant 4 – ST320233401 Located at: 15 INTERSECTIONS, NORTH SIDE IN THE CITY OF MILWAUKEE (Wisconsin Department of Transportation ID No. 2984-29-94)
05/27/2026 03:30 PM UTC
OFFICIAL NOTICE 56-1-2026
46TH AND STATE STREET – RETAINING WALL REPLACEMENT
05/28/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
06/02/2026 03:30 PM UTC
10 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 53-1-2017
CRACKFILL ASPHALT AND CONCRETE STREET PAVEMENTS WITH A HOT-APPLIED ASPHALT BASED PRODUCT USED TO SEAL AND FILL CRACKS AND JOINTS. ADDITIONAL WORK INVOLVING THE FILLING OF SMALL HOLES, JOINT FAILURES, EXPOSURE OF WIRE MESH AND OTHER MINOR SURFACE DEFECTS USING HOT-APPLIED ASPHALT BASED PRODUCT AND PEA GRAVEL WILL BE REQUIRED ON ALL PAVEMENTS. ETC. Located at: ST211160118 - Various street locations within the City of Milwaukee
04/28/2017 03:30 PM UTC
OFFICIAL NOTICE 48-1-2017
2017 BYPASS PUMP REHABILITATION PROJECT
04/26/2017 03:30 PM UTC
OFFICIAL NOTICE 42-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST211150126 - N. 75th St. - W. Beckett Ave. to W. Congress St. ST211050125 - N. 69th St. - W. Capitol Dr. to W. Hope Ave.
04/26/2017 03:30 PM UTC
OFFICIAL NOTICE 11-1-2017
GREEN STREET BIOSWALE PROJECTS
04/25/2017 03:30 PM UTC
OFFICIAL NOTICE 37-1-2017
WATER MAIN RELAYS at the following locations: N. 62nd St. (WT410140631), W. Melvina St. to W. Capitol Dr. (23 working days); N. 68th St. (WT410140632), W. Capitol Dr. to W. Fiebrantz Ave. (27 working days); N. 67th St. (WT410140638), W. Vienna Ave. to 240’ N/O W. Melvina St. (38 working days); N. 61st St. (WT410140639), W. Melvina St. to W. Capitol Dr. (23 working days); W. Melvina St. (WT410170606), N. 69th St. to W. Appleton Ave. (27 working days); N. 70th St. (WT410170607), W. Vienna Ave. to W. Melvina St. (19 working days); W. Vienna Ave. (WT410170608), N. 66th St. to W. Appleton Ave. (40 working days); N. 52nd St. (WT410170611), W. Hampton Ave. to 300’ N/O W. Stark St. (29 working days); W. Potomac Ave. (WT410170658), N. 73rd St. to N. 74th St. (33 working days); N. 52nd St. (WT410170673), W. Congress St. to W. Lincoln Creek Dr. (18 working days) (Note: Contractor to furnish and install approximately 9,480 lin. ft. of 16”, 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/24/2017 03:30 PM UTC
OFFICIAL NOTICE 31-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, REPAIR PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST211150135 - N. 95th St. - W. Keefe Ave. to W. Nash St. ST211150135 - W. Nash St. - N. 95th St. to N. 96th St. ST211150132 - N. 81st St. - W. Courtland Ave./W. Beckett Ave. to W. Hampton Ave.
04/21/2017 03:30 PM UTC
OFFICIAL NOTICE 24-1-2017
PROJECT NO. 1: COMBINED SEWER SLIP LINING AND MANHOLE REPAIR AND LINING Located at: N. 26th St. – W. McKinley Ave. to 50’ N. of W. Cherry St.
04/19/2017 03:30 PM UTC
OFFICIAL NOTICE 24-2-2017
PROJECT NO. 2: COMBINED SEWER MAIN RELAY AND SANITARY, COMBINED, AND STORM SEWER LINING AND MANHOLE REPAIR AND LINING Located at: S. 24th St. - W. Tripoli Ave. to W. Howard Ave. S. Layton Blvd./S. 27th St. - W. Grant St. to 206'+/- North of W. Harrison Ave. S. 53rd St. - W. Ohio Ave. to W. Nebraska Ave. S. 82nd St. - W. Holt Ave. to W. Morgan Ave. S. Layton Blvd. - W. Pierce St. to W. National Ave. S. Layton Blvd. - 200' N. of W. Evergreen Ln. to W. Evergreen Ln. S. Vermont Ave. - E. Oklahoma Ave. to E. Rhode Island Ave. S. Wentworth Ave. - E. Texas Ave. to E. Oklahoma Ave.
04/19/2017 03:30 PM UTC
OFFICIAL NOTICE 43-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS ( 6”, 7”, & 8”) CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.;Located at: ST211150162 - S. 85th St. - W. Morgan Ave. to W. Holt Ave. ST211150110 - S. 82nd St. - W. Morgan Ave. to W. Holt Ave.
04/18/2017 03:30 PM UTC
OFFICIAL NOTICE 41-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST211070101 - N. 63rd St. - W. Nash St. to a pt. 450' n/o W. Nash St. ST211070102 - N. 64th St. - W. Nash St. to a pt. n/o W. Nash St. ST211080104 - W. Nash St. - N. 62nd St. to a pt. 150' w/o of N. 64th St.
04/17/2017 03:30 PM UTC
1021 - 1030 of 1568 Solicitations
1 2 99 100 101 103 105 106 107 156 157