General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 78-1-2017
CONSTRUCTION OF 5 INCH CONCRETE WALKS, CONCRETE WALK W/INTEGRAL CURB, 7 INCH CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, DETECTABLE WARNING FIELDS, AND CONCRETE WALKS, DRIVEWAYS, AND CONCRETE CURB AND GUTTER REMOVALS, ETC.; Located at: (ST230170153) Area Wide Sidewalk Replacements - 2017 ABB: N. Locust St., N. 32nd St., W. Fond du Lac., & N. 35th St. ABB: W. Mitchell St., S. 13th St., W. Becher St., & S. 16th St. ABB: W. Cleveland Ave., S. 43rd St., W. Oklahoma Ave., & S. 47th St. And Various School Locations
06/14/2017 03:30 PM UTC
OFFICIAL NOTICE 54-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST21140109 - N. 52nd St. - W. Villard Ave. to W. Silver Spring Dr.
06/13/2017 03:30 PM UTC
OFFICIAL NOTICE 65-1-2017
N. HAWLEY ROAD VIADUCT SOUTHWEST RETAINING WALL
06/01/2017 03:30 PM UTC
OFFICIAL NOTICE 25-1-2017
COMBINED, SANITARY AND STORM SEWER MAIN RELAY AND COMBINED AND STORM SEWER LINING AND MANHOLE REPAIR AND LINING in: N. 2nd St. – W. Garfield Ave. to W. North Ave.; N. 9th St. – W. Center St. to W. Hadley St.; N. 21st St. – W. Wright St. – 250’+/- N. of W. Wright St.; N. 22nd St. – W. Locust St. to W. Chambers St.; N. 23rd St. – W. Michigan St. to W. Wisconsin Ave.; N. 27th St. – W. Burleigh St. to 300’ +/- N. of W. Burleigh St.; N. 27th St. – W. Auer Ave. to 100’+/- N. of W. Auer Ave.; N. 60th St. – W. Wright St. to W. Center St.; W. Henry Ave. – S. 23rd St. to S. 26th St.; W. Meinecke Ave. – N. 19th St. to N. 21st St.; W. Wright St. – N. 20th St. to N. 22nd St.
05/31/2017 03:30 PM UTC
OFFICIAL NOTICE 25-2-2017
COMBINED SEWER LINING AND MANHOLE REPAIR AND LINING Located at: N. 20th St. – W. Brown St. to 115’ +/- S. of W. Garfield Ave.
05/31/2017 03:30 PM UTC
OFFICIAL NOTICE 77-1-2017
For the hauling and recycling of residential asphalt shingles from the City of Milwaukee's Drop Off Centers.
05/30/2017 03:30 PM UTC
OFFICIAL NOTICE 26-1-2017
SEWER CLEANING AND EXAMINATION Located at: Various Locations **Attendance at a Pre-Bid meeting on Wednesday, May 17, 2017 at 10:30 AM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project.
05/26/2017 03:30 PM UTC
OFFICIAL NOTICE 51-1-2017
CHIP SEAL BITUMINOUS PAVEMENT USING AN ASPHALTIC MATERIAL WITH ¼” LIMESTONE AGGREGATE COVER CONSISTING OF A MIXTURE OF BITUMINOUS SEAL COATING WITH STONE COVER AGGREGATE SPREAD EVENLY ON THE SURFACE AS SPECIFIED AND DIRECTED AND FILL CRACKS AND FOG SEALING OF CHIP SEALED PAVEMENTS, ETC.; Located at: ST211170186 - Various Street Locations Within the City of Milwaukee
05/18/2017 03:30 PM UTC
OFFICIAL NOTICE 66-1-2017
WATER MAIN RELAYS at the following locations: N. 94th St. (WT410170626), W. Capitol Dr. to 300 Ft. N/O W. Capitol Dr. (10 working days); N. 97th St. (WT410170627), W. Sarasota Pl. to W. Fiebrantz Av. (9 working days); N. 85th St. (WT410170635), 320 Ft. S/O W. Fairmount Av. to W. Villard Av. (44 working days); W. Lancaster Av. (WT410170636), N. 85th St. to N. 87th St. (24 working days); W. Hampton Av. (S/S) (WT410170665), N. 110th St. to 540 Ft. W/O N. 110th St. (17 working days); N. Holton St. (WT410170695), E. Concordia Av. to E. Townsend St. (5 working days). (Note: Contractor to furnish and install approximately 4,093 lin. ft. of 12”, 8”, 6” and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
05/12/2017 03:30 PM UTC
OFFICIAL NOTICE 62-1-2017
WATER MAIN RELAYS, in the following locations: S. 60th St. (WT410170006), W. Morgan Ave. to W. Coldspring Rd. (7 working days); S. 24th Ct. (WT410170601), W. Leroy Ave. to 210’ S/O W. Leroy Ave. (11 working days); S. 6th St. (WT410170615), W. Abbott Ave. to 120’ N/O W. Grange Ave. (65 working days); S. 39th St. (WT410170642), W. Birchwood Ave. to W. Iona Tr. (10 working days); W. Iona Tr. (WT410170643), W. Parnell Ave. to S. 39th St. (11 working days); S. Melinda St. (WT410170655), W. Birchwood Ave. to W. Parnell Ave. (10 working days); S. 5th St. (WT410170657), 600’ N/O W. Layton Ave. to W. Layton Ave. (18 working days); S. 53rd St. (WT410170662), W. Wilbur Ave. to W. Howard Ave. (36 working days); W. Armour Ave. (WT410170668), S. 13th St. to S. 14th St. (9 working days); S. 14th St. (WT410170669), W. Armour Ave. to 550’ S/O W. Cudahy Ave. (18 working days); S. 16th St. (WT410170670), W. Bolivar Ave. to W. Whitaker Ave. (9 working days); S. 25th St. (WT410170674), W. Henry Ave. to 210’ S/O W. Henry Ave. (10 working days); S. 82nd St. (WT410170676), W. Warnimont Ave. to W. Wilbur Ave. (26 working days) (Note: Contractor to furnish and install approx. 7099 lin. ft. of 16”, 12”, 8”, and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.).
05/10/2017 03:30 PM UTC
1041 - 1050 of 1601 Solicitations
1 2 101 102 103 105 107 108 109 160 161