General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 55-1-2016
COMBINED SEWER MAINS RELAY AND COMBINED SEWER LINING, REPAIR AND MANHOLE REPAIR AND LINING in: N. 15th St. – W. Highland Ave. to W. Juneau Ave.; N. 17th St. – W. Kilbourn Ave. to W. Highland Ave.; N. 18th St. / Pedestrian Way – 140’ +/- S. of Highland Ave. to W. Highland Ave. **Attendance at a Pre-Bid meeting on Thursday, May 19, 2016 at 10:00 AM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project.
05/27/2016 03:30 PM UTC
OFFICIAL NOTICE 54-1-2016
COMBINED SEWER MAIN RELAY, COMBINED SEWER LINING, AND MANHOLE REPAIR AND LINING in: W. North Ave. – N. Teutonia Ave. to N. 14th St., W. Wright St. – N. 11th St. to N. 15th St., and N. Teutonia Ave. – W. North Ave. to 200’ +/- N. of W. North Ave.
05/26/2016 03:30 PM UTC
OFFICIAL NOTICE 53-1-2016
SANITARY SEWER RELAY, AND STORM SEWER REPAIR, LINING AND MANHOLE REPAIR AND LINING in: N. 53rd St. – W. Roosevelt Dr. to W. Keefe Ave.; AND N. 55th St. – W. Nash St. to W. Vienna Ave.
05/24/2016 03:30 PM UTC
OFFICIAL NOTICE 38-1-2016
CONSTRUCTION OF 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” AND 8” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, AND SEWER WORK, ETC.; Located at: (ST211150165) - N. 53rd St. - W. Roosevelt Dr. to W. Keefe Ave. (TD04284001A) - W. Hope Ave. / W. Maxwell Pl. - N. 51st Blvd. to W. Fond Du Lac Ave.
05/23/2016 03:30 PM UTC
OFFICIAL NOTICE 32-1-2016
This project involves the Traffic Deck Recoating and Repairs of Parking Levels 1-4 at the Milwaukee-Michigan Parking Structure located in Milwaukee, WI 53202.
05/19/2016 03:30 PM UTC
OFFICIAL NOTICE 61-1-2016
WATER MAIN RELAYS, located at the following locations: W. River Bend Dr. (WT410160603), W. Ohio Ave. to W. Verona Ct. (14 Working Days); S. 77th St. (WT410160625), 570’ N/O W. Burdick Ave. to W. Morgan Ave. (52 Working Days); W. Verona Ct. (WT410160626), S. 77th St. to S. 79th St. (16 Working Days); W. Ohio Ave. (WT410160627), S. 76th St. to S. 80th St. (47 Working Days); W. Burdick Ave. (WT410160629), S. 77th St. to S. 80th St. (33 Working Days).
05/16/2016 03:30 PM UTC
OFFICIAL NOTICE 59-1-2016
CONSTRUCTION OF BIOFILTRATION AREA FENCE
05/13/2016 03:30 PM UTC
OFFICIAL NOTICE 60-1-2016
WATER MAIN RELAYS, located at the following locations: Water Main Relays – W. Stack Dr. (WT410160692), S. 51st St. to S. 56th St. (48 Working Days); W. Stack Dr. (WT410160693), S. 58th St. to S. 60th St. (13 Working Days); S. 54th St. (WT410160695), W. Oklahoma Ave. to W. Ohio Ave. (35 Working Days); W. Euclid Ave. (WT410160696), S. 53rd St. to S. 55th St. (15 Working Days); S. 53rd St. (WT410160697), W. Dakota St. to W. Montana St. (16 Working Days); S. 53rd St. (WT410160698), W. Oklahoma Ave. to W. Stack Dr. (15 Working Days); W. Arizona St. (WT410160699), S. 53rd St. to S. 55th St. (17 Working Days); W. Stack Dr. (WT410160910), W. Stack Ct. to S. 60th St. (15 Working Days); S. 60th St. (WT410160911), W. Stack Dr. to W. Montana St. (18 Working Days)
05/09/2016 03:30 PM UTC
OFFICIAL NOTICE 38-1-2016
CONSTRUCTION OF 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” AND 8” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, AND SEWER WORK, ETC.; Located at: (ST211150165) - N. 53rd St. - W. Roosevelt Dr. to W. Keefe Ave. (TD04284001A) - W. Hope Ave. / W. Maxwell Pl. - N. 51st Blvd. to W. Fond Du Lac Ave.
05/09/2016 03:30 PM UTC
OFFICIAL NOTICE 30-1-2016
CONSTRUCTION OF 7”, 8”, AND 9” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE DRIVEWAYS, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 5” AND 7” CONCRETE WALKS, CONCRETE REMOVALS, AND SEWER WORK, ETC.; located at (ST211140117) - S. 5th St. - W. Scott St. to W. Virginia St., (Incl. S. 4th St./S. Polcyn St. - W. Greenfield Ave to W. Scott St.).
05/06/2016 03:30 PM UTC
1041 - 1050 of 1476 Solicitations
1 2 101 102 103 105 107 108 109 147 148