General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 150-1-2015
2016 Sanitary Bypass Pump & Sanitary Lift Station Inspection and Bypass Pump Testing at various locations.
01/06/2016 04:30 PM UTC
OFFICIAL NOTICE 144-1-2015
DEMOLITION OF RESIDENTIAL STRUCTURES LOCATED AT: 5664 South 20th Street & 5710 South 20th Street
12/23/2015 04:30 PM UTC
OFFICIAL NOTICE 148-1-2015
COMBINED SEWER MAINS RELAY AND SLIP LINING in: W. Becher St. – S. 16th St. to S. 19th St.
12/23/2015 04:30 PM UTC
OFFICIAL NOTICE 149-1-2015
WATER MAIN RELAYS, located at the following locations: Water Main Relays – W. Lapham Blvd. (WT410110630), S. 12th St. to S. 15th Pl. (17 Working Days); S. 14th St. (Vac) (WT410110631), W. Lapham Blvd. to W. Mitchell St. (7 Working Days); W. Manitoba St. (WT410150671), W. Idaho St. to W. Kinnickinnic River Pkwy. (17 Working Days); W. Idaho St. (WT410150672), S. 61st St. to W. Manitoba St. (20 Working Days); W. Orchard St. (WT410150673), S. 13th St. to S. 15th St. (25 Working Days); S. 15th St. (WT410150674), W. Greenfield Ave. to W. Lapham Blvd. (27 Working Days)
12/17/2015 04:30 PM UTC
OFFICIAL NOTICE 141-1-2015
2016 NORTH SHERMAN BOULEVARD GREEN STREET MEDIAN PROJECT: Located at North Sherman Boulevard from West North Avenue to West Locust Street.
11/19/2015 04:30 PM UTC
OFFICIAL NOTICE 140-1-2015
SANITARY AND STORM SEWER MAINS RELAY in: W. Lincoln Ave. – S. 35th St. to S. 37th St.
11/18/2015 04:30 PM UTC
OFFICIAL NOTICE 145-1-2015
SANITARY AND STORM SEWER MAIN LINING, REPAIR AND MANHOLE REPAIR & LINING in: Area Bounded by: W. Fairmount Ave., W. Capitol Dr., N. Green Bay Ave., and N. 33rd St.
11/11/2015 04:30 PM UTC
OFFICIAL NOTICE 139-1-2015
SANITARY SEWER MAIN LINING, REPAIR AND MANHOLE REPAIR & LINING in: Area Bounded by: W. Capitol Dr. to W. Finn Pl. and N. 8th St., to N. 24th St.
10/26/2015 03:30 PM UTC
OFFICIAL NOTICE 142-1-2015
CONSTRUCTION OF UNDERGROUND CONDUIT, MANHOLES, VAULTS, ETC., located at in N. Cass Street between E. Wisconsin Avenue and E. Michigan Street, and in E. Michigan Street between N. Cass Street and N. Lincoln Memorial Drive.
10/14/2015 03:30 PM UTC
OFFICIAL NOTICE 132-1-2015
WATER MAIN RELAYS AND ALTERATIONS, located at the following locations: Water Main Relay & Alterations – N. Jackson St. (ST320123041), E. Kilbourn Ave. to E. Ogden St. (45 Working Days); Water Main Alterations – N. 4th St. (ST320123041), W. St. Paul Ave. to W. Clybourn St. (9 Working Days); N. Water St. (ST320123041), At E. St. Paul Ave. (6 Working Days); N. Broadway (ST320123041), E. Michigan St. to E. Wisconsin Ave. (6 Working Days); N. Milwaukee St. (ST320123041), E. Wells St. to E. Kilbourn Ave. (17 Working Days); E. Ogden Ave. (ST320123041), N. Van Buren St. to N. Astor St. (19 Working Days)
10/13/2015 03:30 PM UTC
1231 - 1240 of 1601 Solicitations
1 2 120 121 122 124 126 127 128 160 161