General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 2-2-2016
PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, located at: (ST216160101) - N. 60th St. - W. Appleton Ave. to W. Burleigh St., N. 81st St. - W. Calumet Rd. to W. Bradley Rd., N. 84th St. - W. Florist Ave. to W. Mill Rd., N. 87th St. - W. Bradley Rd. to W. Tower Ave., N. 100th St. - South of W. Hampton Ave. to W. Hampton Ave., W. Calumet Rd. - N. 76th St. to N. 91st St., W. Mill Rd. - Hwy 41 (W. Appleton Av.) to City Limits (N. 124th St.)
02/24/2016 04:30 PM UTC
OFFICIAL NOTICE 18-1-2016
COMBINED SEWER MAINS LINING, REPAIR AND MANHOLE REPAIR & LINING in: W. Keefe Ave. (N/S) – N. 17th St. to N. 22nd St & W. Keefe Ave. (S/S) – N. 17th St. to 40’ +/- W. of N. 24th Pl. **Attendance at a Pre-Bid meeting on Tuesday, February 16, 2016 at 10:00 AM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project. Prequalification documentation is required to be submitted to the Environmental Engineering Section, Room 821, 841 N. Broadway, Milwaukee, WI 53202 prior to the close of business on February 16, 2016.
02/23/2016 04:30 PM UTC
OFFICIAL NOTICE 31-1-2016
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project 1: City-Owned Lot Area 1: Area bounded by Capitol Drive, and north City limits
02/22/2016 04:30 PM UTC
OFFICIAL NOTICE 20-1-2016
CONSTRUCTION OF BIORETENTION FACILITIES AND SITE WORK INCLUDING CONCRETE CURB AND GUTTER, SITE PLANTINGS, SEEDING, ETC, located at NORTH TERRACE AVE FROM EAST BELLEVIEW PLACE TO EAST LAFAYETTE PLACE
02/16/2016 04:30 PM UTC
OFFICIAL NOTICE 15-1-2016
WATER MAIN RELAYS at the following locations: W. Beloit Rd. (WT410110660), S. 98th St. to S. 100th St. (22 Working Days); W. Beloit Rd. (S/S) (WT410110661), S. 92nd St. to S. 96th St. (26 Working Days); S. 97th St. (WT410110662), W. Oklahoma Ave. to W. Beloit Rd. (47 Working Days); W. Allerton Ave. (WT410140641), S. 62nd St. to S. 67th St. (37 Working Days); S. 95th St. (WT410140664), W. Beloit Rd. to 600’ S/O W. Beloit Rd. (18 Working Days).
02/03/2016 04:30 PM UTC
OFFICIAL NOTICE 14-1-2016
NORTH POINT WATER TOWER MASONRY REPAIR AND RESTORATION 2288 NORTH LAKE DRIVE MILWAUKEE, WI
02/02/2016 04:30 PM UTC
OFFICIAL NOTICE 11-1-2016
PROJECT NO. 1: COMBINED SEWER MAINS RELAY AND COMBINED AND STORM SEWER LINING AND MANHOLE REPAIR & LINING in: N. 51st St. – W. Lloyd St. to W. Garfield Ave. N. 55th St. – W. Lloyd St. to W. Garfield Ave. W. Fond Du Lac Ave. – W. Armitage Ave. to W. Constance Ave. W. Lloyd St. –N. 48th St. to N. 53rd St. N. Sherman Blvd. – W. Lisbon Ave. to W. North Ave. **Attendance at a Pre-Bid meeting on Friday, January 22, 2016 at 10:00 AM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project. Prequalification requirements are required to be submitted to the Environmental Engineering Section, Room 821, 841 N. Broadway, Milwaukee, WI 53202 prior to the close of business on January 22, 2016.
01/27/2016 04:30 PM UTC
OFFICIAL NOTICE 11-2-2016
PROJECT NO. 2: SANITARY SEWER MAIN LINING, REPAIR AND MANHOLE REPAIR & LINING in: Area Bounded By: W. Arthur Ave., W. Cleveland Ave., S. 67th St., S. 71st St. And Area Bounded By: W. Montana St., W. Oklahoma Ave., S. 44th St., S. 49th St.
01/27/2016 04:30 PM UTC
OFFICIAL NOTICE 10-1-2016
COMBINED SEWER MAIN RELAY AND COMBINED SEWER MAINS LINING AND MANHOLE REPAIR & LINING in: N. 27th St. & W. Vliet St, N. 27th St. & W. Cherry St. (Intersections); W. Galena St. – N. 26th St. to N. 30th St.; W. Juneau Av. –N. 27th St. to N. 28th St.; W. Walnut St. – N. 26th St. to N. 27th St.
01/21/2016 04:30 PM UTC
OFFICIAL NOTICE 152-1-2015
2016 SANITARY MANHOLE INSPECTION, SEWER STRUCTURES INSPECTION AND CITY UNDERGROUND CONDUIT MANHOLE INSPECTION PROJECT
01/12/2016 04:30 PM UTC
1221 - 1230 of 1601 Solicitations
1 2 119 120 121 123 125 126 127 160 161