We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 78-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; Street Lighting Upgrades for: ST3202318100 – Street Lighting Improvement for Carbon Reduction Program @ Various Locations
08/15/2025 03:30 PM UTC
OFFICIAL NOTICE 90-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
08/19/2025 03:30 PM UTC
OFFICIAL NOTICE 76-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” AND 8” CONCRETE BASE, 8” CONCRETE PAVEMENT, 8” HIGH EARLY STRENGTH COLORED CONCRETE, 7” AND 8” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, SEALING PAVEMENT JOINTS AND CRACKS, VARIOURS TRAFFIC SIGNAGE ASSEMBLY AND INSTALLATION, GRAVEL FILLING, CONCRETE REMOVALS, VARIOUS PAVEMENT MARKINGS, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, ETC.; Located at: ST211220233 – In West Adler Street - South Hawley Road to South 68th Street
08/26/2025 03:30 PM UTC
OFFICIAL NOTICE 66-1-2025
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded By (ABB): ST212240108 - West Congress Street, West Marion Street, North 75th Street, & North 76th Street ST212180109 - East Brady Street, North Cass Street, East Kewaunee Street, & North Marshall Street ST212250101 - West Auer Avenue, West Burleigh Street, North 88th Street, & North 89th Street ST21200101 - West Atkinson Avenue, West Finn Place, North 10th Street, & North 11th Street ST212230107 - South Honey Creek Drive, South Lorene Drive, South Melinda Street, & West Wanda Avenue ST212220119 - West Cypress Street, West Fond Du Lac Avenue, West Monroe Street, West Wright Street, & North 24th Street
08/27/2025 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 35-1-2015
WATER MAIN RELAYS, located at the following locations : N. Strathmore Ave. (WT410150663), W. Herbert Ave. to W. Sheridan Ave. (26 Working Days); W. Herbert Ave. (WT410150664), N. Strathmore Ave. to W. Tallmadge Pl. (29 Working Days); W. Kathryn Ave. (WT410150665), N. Strathmore Ave. to N. 72nd St. (23 Working Days).
02/20/2015 04:30 PM UTC
OFFICIAL NOTICE 22-1-2015
NORTHWEST GARAGE - COMPRESSED NATURAL GAS FUELING PROGRAM 3025 W. RUBY AVENUE MILWAUKEE, WI
02/19/2015 04:30 PM UTC
OFFICIAL NOTICE 28-1-2015
WATER MAIN RELAYS, located at the following locations: Water Main Relays - N. 105th St.(WT410150677), W. Stark St. to W. Lancaster Av. (38 Working Days); W. Cameron Av.(WT410150678), N. 103rd St. to N. 105th St. (34 Working Days); W. Lancaster Av.(WT410150679), N. 103rd St. to N. 105th St. (17 Working Days); W. Fairmount Av.(WT410150680), N. 104th St. to N. 105th St. (5 Working Days); N. 104th St.(WT410150681), W. Harvest Ln. to W. Fairmount Av. (5 Working Days); W. Harvest Ln.(WT410150682), N. 104th St. to N. 105th St. (14 Working Days)
02/18/2015 04:30 PM UTC
OFFICIAL NOTICE 9-1-2015
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at (ST216150108) - S. Muskego Ave. - W. Becher St. to S. Cesar E. Chavez Dr.; S. 13th St. - W. Oklahoma Ave. to W. Montana St.; S. Kinnickinnic Ave. - W. Oklahoma Ave. to I-794 PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, located at (ST216151108) - S. Muskego Ave. - W. Becher St. to S. Cesar E. Chavez Dr.; S. 13th St. - W. Oklahoma Ave. to W. Montana St.; S. Kinnickinnic Ave. - W. Oklahoma Ave. to I-794 Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 29, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/12/2015 04:30 PM UTC
OFFICIAL NOTICE 7-1-2015
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at (ST216150106) - N. Holton St. - E. North Ave. to E. Locust St.; S. 6th St. - W. Greenfield Ave. to W. Virginia St.; S. 2nd St. - W. Maple St. to W. Scott St. PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, located at (ST216151106) - N. Holton St. - E. North Ave. to E. Locust St.; S. 6th St. - W. Greenfield Ave. to W. Virginia St.; S. 2nd St. - W. Maple St. to W. Scott St. Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 7, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/11/2015 04:30 PM UTC
OFFICIAL NOTICE 8-1-2015
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at (ST216150107) - W. Morgan Ave. - S. 9th St. to S. 20th St.; W. Morgan Ave. - Pt. E. of W. Lakefield Dr. to S. 35th St.; W. Morgan Ave. - S. 35th St. to S. 43rd St.; S. 20th St. - W. College Ave. to W. Ramsey Ave. PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, located at (ST216151107) - W. Morgan Ave. - S. 9th St. to S. 20th St.; W. Morgan Ave. - Pt. E. of W. Lakefield Dr. to S. 35th St.; W. Morgan Ave. - S. 35th St. to S. 43rd St.; S. 20th St. - W. College Ave. to W. Ramsey Ave. Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 29, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/11/2015 04:30 PM UTC
OFFICIAL NOTICE 6-1-2015
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at (ST216150105) W. Roosevelt Dr. - N. Fond du Lac Ave. to N. 51st St.; W. Roosevelt Dr. - N. 51st St. to N. 60th St.; W. North Ave. - W. Lisbon Ave. to West City Limits PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, located at (ST216151105) W. Roosevelt Dr. - N. Fond du Lac Ave. to N. 51st St.; W. Roosevelt Dr. - N. 51st St. to N. 60th St.; W. North Ave. - W. Lisbon Ave. to West City Limits The contractor has the option of submitting two (2) proposals for the paving on all the locations listed. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/10/2015 04:30 PM UTC
OFFICIAL NOTICE 5-1-2015
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216150104) Asphalt Overlays: N. Van Buren St. - E. Kilbourn Ave. to E. Brady St.; E/W Pleasant St. - N. Palmer St. to N. Dr. Martin Luther King Jr. Dr.; E. Newberry Blvd. - N. Lake Dr. to N. Downer Ave.; E. Newberry Blvd. - N. Downer Ave. to N. Oakland Ave. Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 14, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/09/2015 04:30 PM UTC
OFFICIAL NOTICE 4-1-2015
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216150103) Asphalt Overlays: W. Locust St. - N. Fond du Lac Ave. to N. 35th St.; W. Center St. - N. 12th St. to N. 20th St.; W. Center St. - N. 35th St. to N. Sherman Blvd.; N. 27th St. - W. Townsend St. to W. Capitol Dr. Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 14, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/06/2015 04:30 PM UTC
OFFICIAL NOTICE 2-1-2015
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216150101) Asphalt Overlays: W. Villard Ave. – N. 51st St. to N. 60th St.; W. Villard Ave. - N. 60th St. to N. 68th St.; W. Florist Ave. – N. Teutonia to N. Sherman Blvd. Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 14, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/05/2015 04:30 PM UTC