General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 62-1-2025
Milwaukee Fire Department, Engine House #4, 7, 16, 18, & 36 Roof & Metal Cladding Replacement Located at: Various Fire Station Locations, Milwaukee, Wisconsin.
06/18/2025 03:30 PM UTC
OFFICIAL NOTICE 57-1-2025
WATER MAIN RELAYS, at the following locations: S. 20TH ST (WT410220709), W COLLEGE AV TO W WOOD AVE, (53 working days); W. CARRINGTON AV. (WT410220710), S. 19TH ST. TO S. 20TH ST. , (7 working days); S. 86TH ST. (WT410240629), 250' N/O W. BURDICK AV. TO W. OHIO AV., (11 working days); S. 85TH ST. (WT410240630), 560' N/O W. OHIO AV. TO W. OHIO AV., (12 working days); W. OHIO AV. (WT410240631), S. 84TH ST. TO S. 86TH ST., (10 working days); N. JACKSON ST. (WT410240632), E. MICHIGAN ST. TO E. WISCONSIN AV., (9 working days); W. KIEHNAU AV. (WT410240659), N. 40TH ST. TO N 43RD ST., (17 working days); N. 42ND ST. (WT410240660), W. KIEHNAU AV. TO 910' N/O W. KIEHNAU AV., (17 working days); W. HEMLOCK RD. (WT410240661), N. 51ST BL. TO W. GREENWOOD TR., (26 working days); N. 52ND ST. (WT410240662), W. HEMLOCK RD. TO W. CALUMET RD., (21 working days); W. PORTAGE AV. (WT410240663), N. 53RD ST. TO N. 55TH ST., (12 working days); (Note: Contractor to furnish and install approximately 10,430.00 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/20/2025 03:30 PM UTC
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 131-1-2014
SANITARY SEWER MAINS LINING & REPAIR AND SANITARY MANHOLE LINING & REPAIR IN: N. 27th St. – 160’ + North of W. Villard Ave. to W. Custer Ave. N. 41st St. – W. Lancaster Ave. to 345’ + North of W. Lancaster Ave. Area bounded by W. Hampton Ave. to W. Lincoln Creek Pkwy., N. 23rd St. to N. Teutonia Ave.
11/26/2014 04:30 PM UTC
OFFICIAL NOTICE 131-2-2014
2014 MEDIUM/LARGE DIAMETER SEWER MAIN EXAMINATIONS #2
11/26/2014 04:30 PM UTC
OFFICIAL NOTICE 130-1-2014
SANITARY SEWER MAINS LINING & REPAIR AND SANITARY MANHOLE LINING & REPAIR IN: Area bounded by E. & W. Capitol Dr. to E. & W. Keefe Ave. from N. Richards St. to N. 8th St.
11/20/2014 04:30 PM UTC
OFFICIAL NOTICE 130-2-2014
SANITARY SEWER MAINS LINING & REPAIR AND SANITARY MANHOLE LINING & REPAIR IN: Area bounded by W. Capitol Dr. to W. Cornell St. from N. Green Bay Ave. to N. 24th Pl.
11/20/2014 04:30 PM UTC
OFFICIAL NOTICE 129-1-2014
WATER MAIN RELAYS - N. Booth St. (WT410110617), E. Lloyd St. to W. Garfield Ave.; N. 10th St. (WT410110629) at W. Ring St.: W. Chambers St. (WT410110650), N. 24th Pl. to N. 25th St.; W. Locust St. (WT410110651), N. 20th St. to N. 24th St.; W. Locust St. (WT410110652), N. 24th Pl. to N. 25th St.
11/07/2014 04:30 PM UTC
OFFICIAL NOTICE 128-1-2014
SANITARY SEWER MAINS LINING & REPAIR, AND SANITARY MANHOLE LINING & REPAIR IN: Area bounded by W. Oklahoma Ave. to W. Howard Ave. and S. 63rd St. to S. 95th St.
10/28/2014 03:30 PM UTC
OFFICIAL NOTICE 128-2-2014
SANITARY AND STORM SEWER MAINS RELAY, SANITARY AND STORM SEWER MAINS LINING, AND MANHOLE REPAIR & LINING IN: W. Grantosa Dr. (Easement) – N. 84th St. to W. Grantosa Dr., and W. Trenton Pl. – 550’+ East of N. 60th St. to 300’+ East of N. 60th St.
10/28/2014 03:30 PM UTC
OFFICIAL NOTICE 121-1-2014
FOUNDATION DRAIN DISCONNECTION AND SUMP PUMP INSTALLATION PROJECT AT VARIOUS LOCATIONS IN:N. 86th St. – W. Center St. to W. Chambers St.
10/27/2014 03:30 PM UTC
OFFICIAL NOTICE 112-1-2014
WATER MAIN RELAYS - N. 13th St. (WT410101031), 50' N/O W. Birch Ct. to W. Silver Spring Dr.; W. Birch Av. (WT410110638), N. Milwaukee River Pk. to N. 11th St.; N. Milwaukee River Pk. (WT410110639), 900' S/O W. Lawn Av. to 700' S/O W. Lawn Av.; W. Custer Av. (WT410110647), N. 27th St. to 300' W/O N. 27th St.; N. 28th St. (WT410110648), 400' N/O W. Villard Av. to 900' N/O W. Villard Av.; N. 29th St. (WT410110649), 675' N/O W. Villard Av. to 900' N/O W. Villard Av.; W. Burleigh St. (WT410140706), at W. Fond du Lac Av.
10/21/2014 03:30 PM UTC
OFFICIAL NOTICE 125-1-2014
Water Main Relays - S. Marilyn St.(WT410110656), W. Birchwood Av. to W. Green Av.; W. Green Av.(WT410110657), S. Marilyn St. to W. Ramsey Av; W. Iona Tr.(WT410110658), S. 31st St. to S. Melinda St.; W. Wanda Av.(WT410110659), S. 34th St. to S. Lorene Av.; W. Cold Spring Rd.(WT410140694), S. 28th St. to 370' W/O S. 64th St.
10/01/2014 03:30 PM UTC
1241 - 1250 of 1474 Solicitations
1 2 121 122 123 125 127 128 129 147 148