General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 62-1-2025
Milwaukee Fire Department, Engine House #4, 7, 16, 18, & 36 Roof & Metal Cladding Replacement Located at: Various Fire Station Locations, Milwaukee, Wisconsin.
06/18/2025 03:30 PM UTC
OFFICIAL NOTICE 57-1-2025
WATER MAIN RELAYS, at the following locations: S. 20TH ST (WT410220709), W COLLEGE AV TO W WOOD AVE, (53 working days); W. CARRINGTON AV. (WT410220710), S. 19TH ST. TO S. 20TH ST. , (7 working days); S. 86TH ST. (WT410240629), 250' N/O W. BURDICK AV. TO W. OHIO AV., (11 working days); S. 85TH ST. (WT410240630), 560' N/O W. OHIO AV. TO W. OHIO AV., (12 working days); W. OHIO AV. (WT410240631), S. 84TH ST. TO S. 86TH ST., (10 working days); N. JACKSON ST. (WT410240632), E. MICHIGAN ST. TO E. WISCONSIN AV., (9 working days); W. KIEHNAU AV. (WT410240659), N. 40TH ST. TO N 43RD ST., (17 working days); N. 42ND ST. (WT410240660), W. KIEHNAU AV. TO 910' N/O W. KIEHNAU AV., (17 working days); W. HEMLOCK RD. (WT410240661), N. 51ST BL. TO W. GREENWOOD TR., (26 working days); N. 52ND ST. (WT410240662), W. HEMLOCK RD. TO W. CALUMET RD., (21 working days); W. PORTAGE AV. (WT410240663), N. 53RD ST. TO N. 55TH ST., (12 working days); (Note: Contractor to furnish and install approximately 10,430.00 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/20/2025 03:30 PM UTC
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 120-2-2014
COMBINED SEWER MAINS RELAY AND LINING, AND MANHOLE LINING AND REPAIR IN: E. Auer Ave. – 25’+/- West of N. Booth St. to N. Humboldt Blvd. (various locations), N. Bremen St. – E. North Ave. to E. Meinecke Ave., and E. Meinecke Ave. – N. Fratney St. to N. Weil St.
09/30/2014 03:30 PM UTC
OFFICIAL NOTICE 107-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, SODDING, ETC. located at (ST211060141) S. Burrell St. – A point 275’+/- South of E. Ohio Av. to E. Ohio Av.; (ST211140159) S. Kinnickinnic Av. southeast of S. California St. (Sijan Playfield) (Ped Crossing); (ST211140160) S. 43rd St. at W. Montana St. (Ped Crossing); (ST211140155) E. Rosedale Av. – east of S. Chase Av. (Kinnickinnic Bike Trail bridge over S. Chase Av. ADA access point); (ST211140172) S. 6th St. at W. Hayes Av. (Traffic Calming)
09/29/2014 03:30 PM UTC
OFFICIAL NOTICE 106-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, PAVEMENT REMOVAL, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, SODDING, ETC. located at (ST211140123) N. 52nd St. – W. Nash St. to W. Capitol Dr.
09/26/2014 03:30 PM UTC
OFFICIAL NOTICE 113-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, ROADWAY CUTTING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, SODDING, ETC. located at (ST211130183) N. 55th St. – W. Vienna Ave. to W. Melvina St.
09/25/2014 03:30 PM UTC
OFFICIAL NOTICE 120-1-2014
COMBINED SEWER MAINS RELAY IN: S. 31st St. – W. Scott St. to W. Greenfield Ave. and S. 33rd St. – W. Greenfield Ave. to W. Branting Ln.
09/24/2014 03:30 PM UTC
OFFICIAL NOTICE 108-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, ETC. located at (ST211140119) W. Spokane St. – N. 60th St. to N. 64th St.; (ST211140147) N. 91st St. – W. Locust St. to W. Burliegh St.; (ST211140148) W. Florist Ave. – N. 55th St. to N. 60th St.
09/23/2014 03:30 PM UTC
OFFICIAL NOTICE 105-1-2014
CONSTRUCTION OF 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC PAVEMENT, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, ETC. located at (ST211140150) E. Erie St. at E. Menomonee St., E. Menomonee St. – N. Broadway to E. Erie St.; (ST211140156) N. Water St. at E. Pearson St. (Marsupial bridge area access); (ST211140158) W. Clybourn St. – a point east of N. 16th St. to N. 16th St. (median)
09/22/2014 03:30 PM UTC
OFFICIAL NOTICE 84-1-2014
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, PAVEMENT REMOVAL, CUTTING, CRUSHED STONE BASE, PERMEABLE PAVERS, ETC. located at (ST212140127) Alley betw W. Hope Ave, W. Marion St., N. 61st St, and N. 62nd St (Permeable alley); (ST212020110) Alley betw W. Appleton Av, W. Congress St, W. Hope Ave, W. Potomac Ave and N. 80th St (N/S Leg) (Permeable alley); (ST212140124) Alley betw W. Hadley St, W. Locust St, N. 81st St and N. 82nd St. (Permeable alley); (ST212140120) Alley betw W. Center St, N. Grant Bl, W. Hadley St and N. Sherman Bl. (Permeable alley)
09/18/2014 03:30 PM UTC
OFFICIAL NOTICE 109-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, PAVEMENT REMOVAL, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, 6” POROUS WALK, ETC. located at (ST211140126) N. Pinecrest St. – N. Story Pkwy to N. 49th St. (Permeable Sidewalk)
09/17/2014 03:30 PM UTC
OFFICIAL NOTICE 119-1-2014
COMBINED SEWER MAINS RELAY AND LINING AND MANHOLE LINING AND REPAIR IN: E. Knapp St. - N. Van Buren St. to N. Astor St. & N. Van Buren St. - 100'+/- S. of E. Juneau Ave. to E. Knapp St.
09/16/2014 03:30 PM UTC
1251 - 1260 of 1474 Solicitations
1 2 122 123 124 126 128 129 130 147 148