General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 78-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; Street Lighting Upgrades for: ST3202318100 – Street Lighting Improvement for Carbon Reduction Program @ Various Locations
08/15/2025 03:30 PM UTC
OFFICIAL NOTICE 90-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
08/19/2025 03:30 PM UTC
OFFICIAL NOTICE 76-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” AND 8” CONCRETE BASE, 8” CONCRETE PAVEMENT, 8” HIGH EARLY STRENGTH COLORED CONCRETE, 7” AND 8” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, SEALING PAVEMENT JOINTS AND CRACKS, VARIOURS TRAFFIC SIGNAGE ASSEMBLY AND INSTALLATION, GRAVEL FILLING, CONCRETE REMOVALS, VARIOUS PAVEMENT MARKINGS, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, ETC.; Located at: ST211220233 – In West Adler Street - South Hawley Road to South 68th Street
08/26/2025 03:30 PM UTC
OFFICIAL NOTICE 66-1-2025
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded By (ABB): ST212240108 - West Congress Street, West Marion Street, North 75th Street, & North 76th Street ST212180109 - East Brady Street, North Cass Street, East Kewaunee Street, & North Marshall Street ST212250101 - West Auer Avenue, West Burleigh Street, North 88th Street, & North 89th Street ST21200101 - West Atkinson Avenue, West Finn Place, North 10th Street, & North 11th Street ST212230107 - South Honey Creek Drive, South Lorene Drive, South Melinda Street, & West Wanda Avenue ST212220119 - West Cypress Street, West Fond Du Lac Avenue, West Monroe Street, West Wright Street, & North 24th Street
08/27/2025 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 3-1-2015
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216150102) Asphalt Overlays: W. Green Tree Rd. – N. 43rd St. to N. 60th St.; N. 55th St. – W. Lisbon Ave. to W. Burleigh St.; N. 84th St. – W. Mill Road to N. Burbank Ave.; W. Keefe Ave. – N. 94th St. to N. 100th St. Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 5, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/05/2015 04:30 PM UTC
OFFICIAL NOTICE NUMBER 11-1-2015
COMBINED SEWER MAINS RELAY, LINING, AND MANHOLE REPAIR & LINING
01/29/2015 04:30 PM UTC
OFFICIAL NOTICE NUMBER 19-1-2015
2015 Sanitary Bypass Pump & Sanitary Lift Station Inspection and Bypass Pump Testing at various locations.
01/16/2015 04:30 PM UTC
OFFICIAL NOTICE 139-1-2014
2015 SANITARY MANHOLE INSPECTION, SEWER STRUCTURES INSPECTION AND CITY UNDERGROUND CONDUIT MANHOLE INSPECTION PROJECT
01/12/2015 04:30 PM UTC
Official Notice 10-1-2015
SANITARY SEWER MAINS LINING, STORM SEWER MAINS LINING AND RELAY, AND MANHOLE REPAIR & LINING in: N. Teutonia Avenue. – W. Capitol Drive. to W. Ruby Avenue. W. Congress Street. -- 180' +/- East of N.Teutonia Avenue. to N.Teutonia Avenue.
01/09/2015 04:30 PM UTC
Official Notice 10-2-2015
COMBINED SEWER MAINS LINING, AND MANHOLE REPAIR & LINING as follows in: S. 20th Street. – W. Pierce Street. to W. National Avenue. W. National Avenue. – S. 20th Street. to S. 23rd Street. W. Orchard Street. – S. 21st Street. to S. 23rd Street. W. Pierce Street. – W. Reynolds Place. to S. 20th Street.
01/09/2015 04:30 PM UTC
OFFICIAL NOTICE 134-1-2014
2015 North 27th Street Bioretention Project in: N. 27th St. between W. Capitol Dr. and W. Roosevelt Dr.
12/30/2014 04:30 PM UTC
OFFICIAL NOTICE 132-1-2014
2015 BIO-RETENTION FACILITY MAINTENANCE CONTRACT in: Various locations at the City
12/03/2014 04:30 PM UTC
OFFICIAL NOTICE 131-1-2014
SANITARY SEWER MAINS LINING & REPAIR AND SANITARY MANHOLE LINING & REPAIR IN: N. 27th St. – 160’ + North of W. Villard Ave. to W. Custer Ave. N. 41st St. – W. Lancaster Ave. to 345’ + North of W. Lancaster Ave. Area bounded by W. Hampton Ave. to W. Lincoln Creek Pkwy., N. 23rd St. to N. Teutonia Ave.
11/26/2014 04:30 PM UTC
OFFICIAL NOTICE 131-2-2014
2014 MEDIUM/LARGE DIAMETER SEWER MAIN EXAMINATIONS #2
11/26/2014 04:30 PM UTC
1251 - 1260 of 1492 Solicitations
1 2 122 123 124 126 128 129 130 149 150