General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 22-1-2020
ADA UPGRADES TO FONDY MARKET AND PORT OF MILWAUKEE FONDY-2200 W FOND DU LAC AVENUE, MILWAUKEE PORT OF MILW-2323 S LINCOLN MEMORIAL DRIVE
02/05/2020 04:30 PM UTC
OFFICIAL NOTICE 31-1-2020
2020 Sanitary Bypass Pump & Sanitary Lift Station Inspection and Bypass Pump Wet Testing
02/04/2020 04:30 PM UTC
Official Notice 1-1-2020
STORM SEWER MAIN RELAY In: N. 21st St. - W. Melvina St. to N. Teutonia Ave. N. Teutonia Ave. - W. Nash St. to N. 21st St. W. Vienna Ave. - N. 19th Pl. to N. 20th St.
01/30/2020 04:30 PM UTC
Official Notice 1-2-2020
COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING IN: Located at: N. 26th St. – W. Walnut St. to W. Vine St. W. Walnut St. – N. 26th St. to N. 27th St.
01/30/2020 04:30 PM UTC
OFFICIAL NOTICE 1-3-2020
SANITARY AND COMBINED SEWER MAIN RELAY & COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING IN: N. 34th St. – W. Walnut St. to W. Lisbon Ave. N. 49th St. – W Galena St. to W. Vine St. N. 53rd St. – W. Chambers St. to W. Burleigh St. W. Vine St. – 160' +/- East of N. 28th St. to N. 28th St.
01/30/2020 04:30 PM UTC
Official Notice 23-1-2020
Municipal Building, 11th Floor AHU-34 Cooling Coil Replacement 841 North Broadway Milwaukee WI 53202
01/29/2020 04:30 PM UTC
Official Notice 7-1-2020
WATER MAIN RELAYS AND LEAD SERVICE RELAYS, at the following locations: W. Melvina Pl.(WT410160606), N. 30th St. to N. Hopkins St.(8 working days); W. Capitol Dr.(WT41060607), N. 29th St. to N. 30th St.(13 working days); N. 30th St.(WT410160608), W. Melvina Pl. to W. Capitol Dr.(27 working days); N. 38th St.(WT410160628), W. North Av. to W. Wright St.(36 working days); N. 16th St.(WT410160634), W. Hadley St. to W. Locust St.(28 working days); E. Belleview Pl.(WT410160687), N. Terrace Av. to N. Wahl Av.(11 working days); E. Belleview Pl.(WT410160688), N. Downer Av. to N. Lake Dr.(22 working days); N. Summit Av.(WT410160689), E. Belleview Pl. to N. Downer Av.(21 working days). (Note: Contractor to furnish and install approximately 4920 lin. ft. of 12”, 8”, and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
01/28/2020 04:30 PM UTC
Official Notice 26-1-2020
REMOVAL/PRUNING OF DEAD AND HAZARD TREES OR BRANCHES. Work performed under this contract shall consist of dead and hazard tree abatement throughout the City of Milwaukee. The CONTRACTOR shall furnish all labor, supervision, administration, materials, equipment, disposal, utility coordination, insurance, licenses, and permits as required for removal/hazard pruning of dead and hazard trees or branches from privately owned properties in violation of City Ordinance 116-53.
01/22/2020 04:30 PM UTC
Official Notice 24-1-2020
Witkowiak Park Reconstruction 1648 South 4th Street Milwaukee WI 53204
01/16/2020 04:30 PM UTC
OFFICIAL NOTICE 116-1-2019
WATER MAIN RELAY AND HYDRANT ALTERATION at the following locations: S. 108TH St.(WT410190008), at W. Layton Av.(4 working days); S. New York Av.(WT410190675), E. Bottsford Av. to E. Van Norman Av.(16 working days); E. Bottsford Av.(WT410190676), S. Pennsylvania Av. to 300’ E/O S. Illinois Av.(33 working days); N. Teutonia Av.(WT410200001), W. Groeling Av. to W. Capitol Dr.(13 working days); N. 60th St.(WT410200003), W. Capitol Dr. to W. Hampton Av.(4 working days) (Note: Contractor to furnish and install approximately 2537 Lin. FT. 16", 12", 8", and 6" ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/19/2019 04:30 PM UTC
721 - 730 of 1601 Solicitations
1 2 69 70 71 73 75 76 77 160 161