General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKINGS, SEWER WORK, WATER WORK, ETC.; TD08584031 – West Pierce Street - South 6th Street to South 9th Street West Virginia Street - South 6th Street to South 9th Street TD09484011 – South 5th Place - South Chase Avenue to West Burnham Street South 6th Street - West Hayes Avenue to South Chase Avenue West Maple Street - South 2nd Street to South 4th Street
05/06/2025 03:30 PM UTC
OFFICIAL NOTICE 35-1-2025
LS-38: LINCOLN ELECTRICAL UPGRADES PROJECT ELECTRICAL WORK TO REPLACE MEDIUM VOLTAGE SWITCHGEAR LINE-UP, AUTOMATION CONTROLS CABINET, AND RESTROOM RELOCATION AT THE MILWAUKEE WATER WORKS (MWW) LINCOLN STATION
05/13/2025 03:30 PM UTC
OFFICIAL NOTICE 56-1-2025
Election Operations Center & Southwest Shop – Boiler Replacement(s)
05/14/2025 03:30 PM UTC
OFFICIAL NOTICE 32-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8 REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: TD11584013 – In East Michigan Street – North Cass Street to North Lincoln Memorial Drive
05/15/2025 03:30 PM UTC
OFFICIAL NOTICE 13-1-2025
South 20th Street Culvert Rehabilitation
05/21/2025 03:30 PM UTC
OFFICIAL NOTICE 4-1-2025
Street Lighting LED upgrades CRP Area C: ST320240910 – South City Limits to East/West Oklahoma Avenue, Lake Michigan to West City of Milwaukee Limits Street Lighting Upgrades (Wisconsin Department of Transportation ID No. 2984-55-74)
05/22/2025 03:30 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 110-1-2018
MILWAUKEE CITY HALL THIRD FLOOR RENOVATIONS, MECHANICAL AND PLUMBING 200 EAST WELLS STREET MILWAUKEE WI 53202
08/22/2018 03:30 PM UTC
OFFICIAL NOTICE 73-1-2018
CONSTRUCTION OF 5 INCH CONCRETE WALKS, 7 INCH CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, DETECTABLE WARNING FIELDS, AND CONCRETE WALKS, DRIVEWAYS, AND CONCRETE CURB AND GUTTER REMOVALS, ETC.; Located at: ST230180156: Scatter Sites Sidewalk Replacements – 2018 At Various Locations City Wide
08/15/2018 03:30 PM UTC
OFFICIAL NOTICE 109-1-2018
MILWAUKEE FIRE DEPARTMENT ENGINE HOUSE #12-REROOFING 2130 WEST OKLAHOMA AVENUE MILWAUKEE WI
08/13/2018 03:30 PM UTC
OFFICIAL NOTICE 114-1-2018
WATER MAIN RELAYS at the following locations: N. 84th St. (E/S) (WT410180605), W. Hope Av. to W. Marion St. (19 working days); N. 77th St./ W. Potomac Av. (WT410180667), W. Fiebrantz Av. to N. 80th St. (57 working days); W. Hope Av. (WT410180672), N. 60th St. to N. 61st St. (14 working days); N. 61st St. (WT410180673), W. Fiebrantz Av. to W. Congress St. (59 working days); N. 74th St. (WT410180690), W. Marion St. to W. Congress St. (18 working days); W. Marion St. (WT410180691), N. 73rd St. to N. 74th St. (8 working days). (Note: Contractor to furnish and install approximately 6,143 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
08/08/2018 03:30 PM UTC
OFFICIAL NOTICE 67-1-2018
WP-324: NE & NW COAGULATION BASIN FLOCCULATOR UPGRADES LOCATED AT LINNWOOD WATER TREATMENT PLANT, 3000 NORTH LINCOLN MEMORIAL DRIVE, MILWAUKEE, WI 53211
08/03/2018 03:30 PM UTC
OFFICIAL NOTICE 79-1-2018
CONSTRUCTION OF 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST21100102 - S. 3rd St. - W. Maple St. to W. Lapham Blvd.
08/02/2018 03:30 PM UTC
OFFICIAL NOTICE 115-1-2018
78 LEAD SERVICE LINE REPLACEMENTS at childcare facilities within the City of Milwaukee.
08/02/2018 03:30 PM UTC
OFFICIAL NOTICE 93-1-2018
GREEN STREET BIOSWALES IN: West Good Hope Road from 595’ +/- West of North 51st Street to 50’ +/- East of North 90th Boulevard.
08/01/2018 03:30 PM UTC
OFFICIAL NOTICE 7-1-2018
COMBINED AND STORM SEWER MAIN RELAY AND COMBINED SEWER MAIN LINING: Located at: S. 25th St. – W. Becher St. to W. Grant St. S. 29th St. – W. Grant St. to W. Lincoln Ave. S. 30th St. – W. Grant St. to W. Lincoln Ave. W. Grant St. – S. 25th St. to S. 30th St. W. Harrison Ave. – S. 27th St. to S. 28th St. W. Lincoln Ave. – S. 28th St. to S. 31st St.
07/31/2018 03:30 PM UTC
OFFICIAL NOTICE 107-1-2018
INSTALLATION OF LED TRAFFIC SIGNAL MODULES 12 - INCH
07/30/2018 03:30 PM UTC
731 - 740 of 1449 Solicitations
1 2 70 71 72 74 76 77 78 144 145