General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 120-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, 8” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211070132 – S. 91st St. - 300'+/- s/o W. Adler St. to W. Adler St. ST211180114 – W. Verona Ct. - S. 77th St. to S. 70th St. ST211180115 – S. 28th St. - W. National Ave. to W. Pierce St. ST211180106 – S. 54th ST. - W. Midland Dr. to W. Forest Home Ave. (Incl: W. Midland Dr. – S. 54th St. to Greenfield City Limits)
10/30/2018 03:30 PM UTC
OFFICIAL NOTICE 108-1-2018
Rehabilitation of the Kilbourn Tunnels.
10/25/2018 03:30 PM UTC
OFFICIAL NOTICE 111-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: N. 73rd St. - W. Capitol Dr. to W. Congress St. N. 80th St. – W. Townsend St. to W. Keefe Ave. (Incl. N. Walton Pl. -W. Lisbon Av. to W. Townsend St.)
10/19/2018 03:30 PM UTC
OFFICIAL NOTICE 112-1-2018
CONSTRUCTION OF 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, CUC WORK, WATER WORK, ETC.; Located at: ST211180118 - W. Locust St. - N. 29th St. to W. Fond Du Lac Ave.
10/11/2018 03:30 PM UTC
OFFICIAL NOTICE 127-1-2018
100 LEAD SERVICE LINE REPLACEMENTS at various locations within the City of Milwaukee.
10/08/2018 03:30 PM UTC
OFFICIAL NOTICE 126-1-2018
SANITARY SEWER MAIN RELAY in: S. 41st St. - W. Morgan Ave. to S. Cherokee Way; W. Morgan Ave. - S. 35th St. to S. 41st St.
10/02/2018 03:30 PM UTC
OFFICIAL NOTICE 126-2-2018
STORM SEWER OUTFALL REHABILITATION Located at: S. 57th St. – 160’ +/- N. of W. Holt Ave. to Lyons Creek Outfall N. 79th St. – W. Mt. Vernon Ave. to Honey Creek Outfall N. 80th St. – W. Mt. Vernon Ave. to Honey Creek Outfall W. Sumac Pl. (Ext) – W. Kinnickinnic River Pkwy to Kinnickinnic River Outfall
10/02/2018 03:30 PM UTC
OFFICIAL NOTICE 124-1-2018
MITCHELL STREET LOT RECONSTRUCTION 1640 SOUTH 10TH STREET MILWAUKEE, WI
09/28/2018 03:30 PM UTC
OFFICIAL NOTICE 118-1-2018
2018 SANITARY BYPASS PUMP REHABILITATION
09/28/2018 03:30 PM UTC
OFFICIAL NOTICE 96-1-2018
CONSTRUCTION OF 7” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, CUC WORK, WATER WORK, ETC.; Located at: ST211180103 - N. 38th St. – N. Elmhurst Rd. to N. Montreal St. ST211180111 - W. Hope Ave. - N. Sherman Blvd. to N. 51st Blvd.
09/27/2018 03:30 PM UTC
741 - 750 of 1476 Solicitations
1 2 71 72 73 75 77 78 79 147 148