General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKINGS, SEWER WORK, WATER WORK, ETC.; TD08584031 – West Pierce Street - South 6th Street to South 9th Street West Virginia Street - South 6th Street to South 9th Street TD09484011 – South 5th Place - South Chase Avenue to West Burnham Street South 6th Street - West Hayes Avenue to South Chase Avenue West Maple Street - South 2nd Street to South 4th Street
05/06/2025 03:30 PM UTC
OFFICIAL NOTICE 35-1-2025
LS-38: LINCOLN ELECTRICAL UPGRADES PROJECT ELECTRICAL WORK TO REPLACE MEDIUM VOLTAGE SWITCHGEAR LINE-UP, AUTOMATION CONTROLS CABINET, AND RESTROOM RELOCATION AT THE MILWAUKEE WATER WORKS (MWW) LINCOLN STATION
05/13/2025 03:30 PM UTC
OFFICIAL NOTICE 56-1-2025
Election Operations Center & Southwest Shop – Boiler Replacement(s)
05/14/2025 03:30 PM UTC
OFFICIAL NOTICE 32-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8 REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: TD11584013 – In East Michigan Street – North Cass Street to North Lincoln Memorial Drive
05/15/2025 03:30 PM UTC
OFFICIAL NOTICE 13-1-2025
South 20th Street Culvert Rehabilitation
05/21/2025 03:30 PM UTC
OFFICIAL NOTICE 4-1-2025
Street Lighting LED upgrades CRP Area C: ST320240910 – South City Limits to East/West Oklahoma Avenue, Lake Michigan to West City of Milwaukee Limits Street Lighting Upgrades (Wisconsin Department of Transportation ID No. 2984-55-74)
05/22/2025 03:30 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 92-1-2018
PROJECT NO. 1: GREEN STREET BIOSWALES: Located at: S. 76th St. – 485' +/- South of W. Van Beck Ave to 190' +/- South of W. Ohio Ave.
07/11/2018 03:30 PM UTC
OFFICIAL NOTICE 102-1-2018
Milwaukee Fire Department Head Quarters Curtain Wall Refinishing 711 West Wells Street Milwaukee WI
07/10/2018 03:30 PM UTC
OFFICIAL NOTICE 90-1-2018
CONSTRUCTION OF 7” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, TRACK ZONE REMOVALS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, CUC WORK, WATER WORK, ETC.; Located at: ST211180104 - N. 41st St. - W. Meinecke Ave. to W. Wright St. ST211180116 - N. 52nd St. – W. Lisbon Ave. to W. Center St.
07/10/2018 03:30 PM UTC
OFFICIAL NOTICE 99-1-2018
WATER MAIN RELAYS at the following locations: S. 18th St (WT410180625), W. Whitaker Ave. to W. Bottsford Ave. (10 working days); W. Whitaker Ave. (WT410180626), 360’ E/O S. 18th St to S 18th St. (10 working days); S. Logan Ave (WT410180632), S. Whitnall Ave to E. Price Ct. (58 working days); E. Van Norman Ave (WT410180633), S. Lenox St to S. Logan Ave. (10 working days). (Note: Contractor to furnish and install approximately 3,856 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
07/09/2018 03:30 PM UTC
OFFICIAL NOTICE 103-1-2018
WATER MAIN RELAYS at the following locations: W. Fairmount Ave. (WT410180646), N. 47th St. to 30 Ft. E/O N. 48th St. (10 working days); N. 47th St. (W/S) (WT410180647), W. Fairmount Ave. to W. Villard Ave. (38 working days); N. 48th St. (WT410180648), W. Luscher Ave. to W. Fairmount Ave. (24 working days); W. Luscher Ave. (WT410180649), N. 48th St. to N. 49th St. (10 working days); N. 49th St. (WT410180650), W. Luscher Ave. to W. Eggert Pl. (69 working days). (Note: Contractor to furnish and install approximately 5,017 lin. ft. of 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
07/03/2018 03:30 PM UTC
OFFICIAL NOTICE 81-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE PAVEMENT, CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, TRACK ZONE REMOVALS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, CUC WORK, WATER WORK, ETC.; Located at: ST211180113 - N. Summit Ave. - E. Locust Ave. to E. Kenwood Blvd.
06/29/2018 03:30 PM UTC
OFFICIAL NOTICE 006-1-2018
SANITARY AND COMBINED SEWER MAIN RELAY IN: Located at: S. 69th St. – 325' +/- North of W. Cleveland Ave. to 70' +/- North of W. Cleveland Ave. S. Austin St. – E. Norwich St. to 300' +/- South of E. Norwich St. S. Burrell St. – E. Norwich St. to 300' +/- South of E. Norwich St. E. Euclid Ave. – S. Mabbett Ave. to S. Pennsylvania Ave. E. Norwich St. - 100' +/- West of S. Burrell St. to S. Whitnall Ave.
06/26/2018 03:30 PM UTC
OFFICIAL NOTICE 100-1-2018
50 LEAD SERVICE LINE REPLACEMENTS at childcare facilities within the City of Milwaukee.
06/22/2018 03:30 PM UTC
OFFICIAL NOTICE 31-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, ETC.; Construct Asphalt Speed Humps at the Following Locations: (ST211180126) N. 25th St. – W. Melvina St. to W. Capitol Dr. (1 speed hump) (ST211180140) N. 26th St. – W. Auer Ave. to W. Townsend St. (2 speed humps) (ST211170191) N. 26th Sr. – W. Hope Ave. to W. Roosevelt Dr. (1 speed hump) (ST211180147) N. 33rd St. – W. Lloyd St. to W. North Ave. (2 speed humps) (ST211170129) N. 37th St. – W. Lloyd St. to W. Garfield Ave. (1 speed hump) (ST211180151) N. 44th St. – W. Meinecke Ave. to W. Wright St. (1 speed hump) (ST211180152) N 45th St. – W. Glendale Ave. to W. Hampton Ave. (3 speed humps) (ST211170148) N. 47th St. – W. Hampton Ave. to W. Fairmount Ave. (2 speed humps) (ST211180129) N. 48th St. – W. Meinecke Ave. to W. Wright St. (1 speed hump) (ST211180154) N. 48th St. – W. Villard Ave. to W. Rohr Ave. (1 speed hump) (ST211180143) N. 63rd St. – W. Capitol Dr. to W. Fiebrantz Ave. (1 speed hump) (ST211180145) S. 7th St. – W. Becher St. to W. Rogers St. (1 speed hump) (ST211160127) S. 7th St. – W. Lincoln Ave. to W. Becher St. (2 speed humps) (ST211180123) S. 7th St. – W. Holt Ave. to W. Ohio Ave. (1 speed hump) (ST211180138) S. 18th St. – W. Arthur Ave. to W. Hayes Ave. (2 speed humps) (ST211180125) S. 18th St. – W. Hayes Ave. to W. Lincoln Ave. (1 speed hump) (ST211180127) S. 29th St. – W. Lincoln Ave. to W. Grant St. (1 speed hump) (ST211180128) S. 30th St. – W. Hayes Ave. to W. Arthur Ave. (1 speed hump) (ST211180141) S. 31st St. – W. Scott St. to W. National Ave. (2 speed humps) (ST211180130) W. Chambers St. – N. 26th St. to N. 27th St. (1 speed hump) (ST211170163) W. Fairmount Ave. – N. 24th St. to N. 27th St. (4 speed humps) (ST211170164) W. Fairmount Ave. – N. Green Bay Ave. to N. 24th St. (5 speed humps)
06/20/2018 03:30 PM UTC
OFFICIAL NOTICE 88-1-2018
COMBINED SEWER MAIN RELAY & COMBINED SEWER MAIN LINING IN: Alley W. of S. 2nd St. – W. Oregon St. to 125’ +/- S. of W. Oregon St.
06/15/2018 03:30 PM UTC
751 - 760 of 1449 Solicitations
1 2 72 73 74 76 78 79 80 144 145