General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 104-1-2019
TRANSPORTING AND RECYCLING OF WHITE GOODS CONTAINING REFRIGERANTS
08/27/2019 03:30 PM UTC
OFFICIAL NOTICE 102-1-2019
WITKOWIAK PARK RECONSTRUCTION 1648 SOUTH 4TH STREET MILWAUKEE WI 53204
08/26/2019 03:30 PM UTC
OFFICIAL NOTICE 105-1-2019
LINCOLN AVE REPAIR GARAGE HVAC SYSTEM REPLACEMENT 3921 W LINCOLN AVE MILWAUKEE WI 53215
08/23/2019 03:30 PM UTC
OFFICIAL NOTICE 88-1-2019
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” REINFORCED CONCRETE PAVEMENT, 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” TO 9” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, TRACK ZONE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: TD03784003 – N. Plankinton Ave. - Menomonee River to W. St. Paul Ave. ST212180117 – Alley Bounded By: W. Clybourn St., W. St. Paul Av., N. 28th St., & N. 29th St. RE52311225 – N. 28th St. @ W. Wells St. (Street Closure for Vacation)
08/22/2019 03:30 PM UTC
OFFICIAL NOTICE 95-1-2019
WATER MAIN RELAYS at the following locations: S. 67th St. (WT410190620), W. Fremont Pl. to W. Dakota St. (26 working days); S. 64th St. (WT410190627), W. Arthur Av. to W. Cleveland Av. (28 working days); S. Logan Av. (WT410190628), E. Howard Av. to E. Norwich St. (16 working days); S. 26th St. (WT410190639), W. Barnard Av. to 250’ S/O W. Barnard Av. (10 working days); W. Barnard Av. (WT410190641), S. 26th St. to S. 27th St. (10 working days); S. 21st St. (WT410190643), 300’ N/O W. Barnard Av. to W. Barnard Av. (11 working days); W. Barnard Av. (WT410190644), S. 20th St. to S. 21st St. (10 working days); S. 36th St. (WT410190677), W. Lakefield Dr. to W. Ruskin St. (18 working days); W. Ruskin St. (WT410190678), S. 36th St. to S. 38th St. (15 working days); S. 38th St. (WT410190679), W. Euclid Av. to W. Ruskin St. (12 working days). (Note: Contractor to furnish and install approximately 5,751 lin. ft. of 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
08/06/2019 03:30 PM UTC
OFFICIAL NOTICE 97-1-2019
53 LEAD SERVICE LINE REPLACEMENTS at child care facilities within the City of Milwaukee
08/02/2019 03:30 PM UTC
OFFICIAL NOTICE 94-1-2019
WATER MAIN RELAYS at the following locations:N. 66th St.(WT410190618), W. Lancaster Av. to W. Villard Av.(21 working days); W. Lancaster Av.(WT410190619), N. 64th St. to N. 69th St.(38 working days); N. 74th St.(WT410190652), W. Hampton Av. to W. Medford Av.(57 working days); W. Fairmount Av.(WT410190653), W. Medford Av. to N. 76th St.(26 working days). (Note: Contractor to furnish and install approximately 5,770 lin. ft. of 12”, 8”, and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
08/01/2019 03:30 PM UTC
OFFICIAL NOTICE 87-1-2019
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211180110 – W. Denver Ave. - N. Burbank Ave. to N. 91st St. ST211130123 – N. 37th St. - W. Florist Ave. to W. Douglas Ave.
07/31/2019 03:30 PM UTC
OFFICIAL NOTICE 103-1-2019
DOWNSPOUT DISCONNECTION IN THE COMBINED SEWER AREA
07/30/2019 03:30 PM UTC
OFFICIAL NOTICE 96-1-2019
Lincoln Avenue Repair Garage HVAC System Replacement 3921 West Lincoln Avenue Milwaukee WI 53215
07/26/2019 03:30 PM UTC
751 - 760 of 1601 Solicitations
1 2 72 73 74 76 78 79 80 160 161