General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 34-1-2019
COMBINED SEWER MAIN RELAY & NEW STORM SEWER MAIN & PERMEABLE PAVERS IN: S. 11th St. – W. Montana St. to W. Dakota St. W. Montana St. - S. 9th Pl. to 130’ +/- W. of S. 12th St.
07/24/2019 03:30 PM UTC
OFFICIAL NOTICE 34-2-2019
SANITARY AND STORM SEWER MAIN RELAY IN: S. 60th St. – 115’+/- N. of W. Dixon St. to W. Adler St. S. 61st St. – 340’+/- N. of W. Main St. to W. Main St. S. 62nd St. - 350’+/- N. of W. Adler St. to 400’+/- S. of W. Adler St. N. 66th St. - W. Mt. Vernon Ave. to 590’+/- N. of W. Mt. Vernon Ave. W. Adler St. – S. 62nd St. to 190’ W. of S. 62nd St. W. Dixon St. – 140’+/- E. of S. 60th St. to S. 60th St.
07/24/2019 03:30 PM UTC
OFFICIAL NOTICE 34-3-2019
SANITARY AND COMBINED SEWER MAIN RELAY IN: S. Griffin Ave. - E. Bolivar Ave. to E. Van Norman Ave. E. Van Norman Ave. – S. Austin St. to S. Griffin Ave. S. Austin St. – E. Bolivar Ave. to E. Van Norman Ave. S. Clement Ave. – E. Manitoba St. to E. Oklahoma Ave. S. Delaware Ave. – 250’ +/- NW of E. Estes St. to E. Estes St. S. Kinnickinnic Ave. – 200’+/- S. of E. Lincoln Ave. to E. Smith St. E. Manitoba St. – S. Herman St. to S. Clement Ave. E. Trowbridge St. – S. Delaware Ave. to S. Mabbett Ave.
07/24/2019 03:30 PM UTC
OFFICIAL NOTICE 85-1-2019
Provide Labor, Services and Materials to provide Retail Lock Box Services to the Milwaukee Water Works
07/23/2019 03:30 PM UTC
OFFICIAL NOTICE 91-1-2019
DOWNSPOUT DISCONNECTION AREA 1 - NORTHWEST
07/18/2019 03:30 PM UTC
OFFICIAL NOTICE 91-2-2019
DOWNSPOUT DISCONNECTION AREA 2 - NORTHEAST
07/18/2019 03:30 PM UTC
OFFICIAL NOTICE 91-3-2019
DOWNSPOUT DISCONNECTION AREA 3 - CENTRAL
07/18/2019 03:30 PM UTC
OFFICIAL NOTICE 91-4-2019
DOWNSPOUT DISCONNECTION AREA 4 - SOUTH
07/18/2019 03:30 PM UTC
OFFICIAL NOTICE 92-1-2019
Milwaukee Forestry Nursery HVAC System Replacement 8423 South 51st Street Franklin, WI 53132
07/17/2019 03:30 PM UTC
OFFICIAL NOTICE 84-1-2019
WATER MAIN RELAYS at the following locations: S. 15th St.(WT410180600), W. Halsey St. to W. Holmes St.(11 working days); S. 13th St.(WT410180602), W. Holmes Av. to W. Abbott Av.(47 working days); W. Henry Av.(WT410180668), S. 18th St. to S. 20th St.(16 working days); S. 87th St.(WT410190687), W. Morgan Av. to W. Tripoli Av.(60 working days); S. 86th St.(WT410190688), W. Morgan Av. to 275’ S/O W. Wilbur Av.(45 working days); S. 85th St.(WT410190689), W. Morgan Av. to W. Wilbur Av.(37 working days). (Note: Contractor to furnish and install approximately 8,124 lin. Ft. of 12”, 8”, 6”, and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
07/12/2019 03:30 PM UTC
761 - 770 of 1601 Solicitations
1 2 73 74 75 77 79 80 81 160 161