General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 81-1-2025
PROJECT NO.1: ROADWAY NARROWING, PAVING, GREEN INFRASTRUCTURE, AND TRAFFIC SAFETY PROJECT IN: S. 1ST St. – S. Chase Ave. to W. Lincoln Ave.
08/07/2025 03:30 PM UTC
OFFICIAL NOTICE 91-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
08/08/2025 03:30 PM UTC
OFFICIAL NOTICE 78-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; Street Lighting Upgrades for: ST3202318100 – Street Lighting Improvement for Carbon Reduction Program @ Various Locations
08/15/2025 03:30 PM UTC
OFFICIAL NOTICE 90-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
08/19/2025 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 117-1-2018
WATER MAIN RELAYS AND LEAD SERVICE LINE REPLACEMENTS at the following locations: N. 51st Blvd. (WT410180628), W. Hope Ave. to W. Congress St (40 working days); W. Marion St. (WT410180629), N. 50th St to N. 51st Blvd. (10 working days); N. 48th St. (WT410180630), W. Capitol Dr. to W. Marion St. (52 working days); W. Vance Pl. (WT410180635), N. 56th St. to W. Fond Du Lac Ave. (8 working days); N. 56th St. (WT410180636), W. Leon Trail to 400’ north of W. Congress St. (17 working days); N. 52nd St. (WT410180637), W. Hope Ave to W. Congress St. (38 working days); N. 81st St. (WT410180679), W. Villard Ave. to W. Custer Ave. (9 working days). (Note: Contractor to furnish and install approximately 6,511 lin. ft. of 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
08/24/2018 03:30 PM UTC
OFFICIAL NOTICE 110-1-2018
MILWAUKEE CITY HALL THIRD FLOOR RENOVATIONS, MECHANICAL AND PLUMBING 200 EAST WELLS STREET MILWAUKEE WI 53202
08/22/2018 03:30 PM UTC
OFFICIAL NOTICE 73-1-2018
CONSTRUCTION OF 5 INCH CONCRETE WALKS, 7 INCH CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, DETECTABLE WARNING FIELDS, AND CONCRETE WALKS, DRIVEWAYS, AND CONCRETE CURB AND GUTTER REMOVALS, ETC.; Located at: ST230180156: Scatter Sites Sidewalk Replacements – 2018 At Various Locations City Wide
08/15/2018 03:30 PM UTC
OFFICIAL NOTICE 109-1-2018
MILWAUKEE FIRE DEPARTMENT ENGINE HOUSE #12-REROOFING 2130 WEST OKLAHOMA AVENUE MILWAUKEE WI
08/13/2018 03:30 PM UTC
OFFICIAL NOTICE 114-1-2018
WATER MAIN RELAYS at the following locations: N. 84th St. (E/S) (WT410180605), W. Hope Av. to W. Marion St. (19 working days); N. 77th St./ W. Potomac Av. (WT410180667), W. Fiebrantz Av. to N. 80th St. (57 working days); W. Hope Av. (WT410180672), N. 60th St. to N. 61st St. (14 working days); N. 61st St. (WT410180673), W. Fiebrantz Av. to W. Congress St. (59 working days); N. 74th St. (WT410180690), W. Marion St. to W. Congress St. (18 working days); W. Marion St. (WT410180691), N. 73rd St. to N. 74th St. (8 working days). (Note: Contractor to furnish and install approximately 6,143 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
08/08/2018 03:30 PM UTC
OFFICIAL NOTICE 67-1-2018
WP-324: NE & NW COAGULATION BASIN FLOCCULATOR UPGRADES LOCATED AT LINNWOOD WATER TREATMENT PLANT, 3000 NORTH LINCOLN MEMORIAL DRIVE, MILWAUKEE, WI 53211
08/03/2018 03:30 PM UTC
OFFICIAL NOTICE 79-1-2018
CONSTRUCTION OF 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST21100102 - S. 3rd St. - W. Maple St. to W. Lapham Blvd.
08/02/2018 03:30 PM UTC
OFFICIAL NOTICE 115-1-2018
78 LEAD SERVICE LINE REPLACEMENTS at childcare facilities within the City of Milwaukee.
08/02/2018 03:30 PM UTC
OFFICIAL NOTICE 93-1-2018
GREEN STREET BIOSWALES IN: West Good Hope Road from 595’ +/- West of North 51st Street to 50’ +/- East of North 90th Boulevard.
08/01/2018 03:30 PM UTC
OFFICIAL NOTICE 7-1-2018
COMBINED AND STORM SEWER MAIN RELAY AND COMBINED SEWER MAIN LINING: Located at: S. 25th St. – W. Becher St. to W. Grant St. S. 29th St. – W. Grant St. to W. Lincoln Ave. S. 30th St. – W. Grant St. to W. Lincoln Ave. W. Grant St. – S. 25th St. to S. 30th St. W. Harrison Ave. – S. 27th St. to S. 28th St. W. Lincoln Ave. – S. 28th St. to S. 31st St.
07/31/2018 03:30 PM UTC
771 - 780 of 1490 Solicitations
1 2 74 75 76 78 80 81 82 148 149