General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 81-1-2025
PROJECT NO.1: ROADWAY NARROWING, PAVING, GREEN INFRASTRUCTURE, AND TRAFFIC SAFETY PROJECT IN: S. 1ST St. – S. Chase Ave. to W. Lincoln Ave.
08/07/2025 03:30 PM UTC
OFFICIAL NOTICE 91-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
08/08/2025 03:30 PM UTC
OFFICIAL NOTICE 78-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; Street Lighting Upgrades for: ST3202318100 – Street Lighting Improvement for Carbon Reduction Program @ Various Locations
08/15/2025 03:30 PM UTC
OFFICIAL NOTICE 90-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
08/19/2025 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 107-1-2018
INSTALLATION OF LED TRAFFIC SIGNAL MODULES 12 - INCH
07/30/2018 03:30 PM UTC
OFFICIAL NOTICE 97-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211150108 – S. 19th St. - W. Edgerton Ave. to 100’ n/o W. Halsey Ave. ST211150107 – S. 16th St. – W. Edgerton Ave. to 300’ n/o W. Holmes Ave.
07/26/2018 03:30 PM UTC
OFFICIAL NOTICE 82-1-2018
Sealed bids will be opened on WEDNESDAY, JULY 25, 2018 at 10:30 A.M. for PAVING WORK, in the following locations: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, 8” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211070132 – S. 91st St. - 300'+/- s/o W. Adler St. to W. Adler St. ST211180114 – W. Verona Ct. - S. 77th St. to S. 70th St. ST211180115 – S. 28th St. - W. National Ave. to W. Pierce St. ST211180106 – S. 54th ST. - W. Midland Dr. to W. Forest Home Ave.
07/25/2018 03:30 PM UTC
OFFICIAL NOTICE 106-1-2018
50 LEAD SERVICE LINE REPLACEMENTS at various locations within the City of Milwaukee.
07/24/2018 03:30 PM UTC
OFFICIAL NOTICE 95-1-2018
CONSTRUCTION OF 7” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, CUC WORK, WATER WORK, ETC.; Located at: ST211180117 - S. Clement Ave. - S. Kinnickinnic Ave. to E. Russell Ave.
07/23/2018 03:30 PM UTC
OFFICIAL NOTICE 018-1-2018
REMOVAL OF ACCUMULATED MATERIALS AND SEDIMENT FROM THE LINCOLN YARDS STORM WATER POND Located at: 3801 West Lincoln Avenue
07/20/2018 03:30 PM UTC
OFFICIAL NOTICE 84-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211180105 – N. 49th St. - W. Villard Ave. to W. Custer Ave.
07/20/2018 03:30 PM UTC
OFFICIAL NOTICE 83-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 7” CONCRETE PAVEMENT, 6” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211150112 – N. 87th St. - W. Silver Spring Dr. to W. Fond Du Lac Ave.
07/19/2018 03:30 PM UTC
OFFICIAL NOTICE 80-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 8” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211140127 – W. Carmen Ave. – N. 68th St. to N. 76th St.
07/18/2018 03:30 PM UTC
OFFICIAL NOTICE 72-1-2018
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, INSTALLATION OF PERMEABLE PAVERS, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT (1/2), VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT (3/8), VARIABLE THICKNESS CONCRETE WALKS AND/OR CONCRETE DRIVEWAYS, REMOVE AND SALVAGE GRANITE PAVERS, CRACKING AND SEATING CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at: ST212140103 – Alley Bounded By: W. Fairmount Ave., W. Villard Ave., N. 51st Blvd., & N. 53rd St. (Permeable Alley) ST212160101 – Alley Bounded By: W. Auer Ave., W. Hopkins St., N. 23rd St., N. 24th St.
07/13/2018 03:30 PM UTC