General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 12-1-2026
The general work requested is: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC. Located at: ST216260101 – 2026 HIP Group 2 (North-West) N. 74th St. - W. Beckett Av. to W. Congress St. N. 79th St. - W. Vienna Av. to W. Melvina St. N. 84th St. - W. Cheyenne St. to W. Helena St. N. 99th St. - W. Appleton Av. to Point north of W. Carmen Av. W. Caldwell Ct. - W. Medford Av. to a Point West of W. Medford Av. W. Fairmount Av. - N. Green Bay Av. to N. Teutonia Av. (retain speed humps) N. Granville Rd. - W. Bradley Rd. to N. 107th St. (paved pedestrian lane on one side) W. Helena St. - N. 84th St. to N. 86th St. W. Lancaster Av. - N. 37th St. to N. Hopkins St. W. Leon Tr. - N. 76th St. to W. Silver Spring Dr. W. Medford Av. - W. Villard Av. to W. Sheridan Av. W. Park Pl. - N. 107th St. to N. 110th St. W. Stark St. - N. Sherman Bl. to N. 47th St.
05/11/2026 03:30 PM UTC
OFFICIAL NOTICE 52-1-2026
CONCRETE SURFACE REPAIRS AND PAINTING OF THE LOWER LEVEL OF MACARTHUR SQUARE PARKING STRUCTURE.
05/12/2026 03:30 PM UTC
OFFICIAL NOTICE 13-1-2026
The general work requested is: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC. Located at: ST216260102 – 2026 HIP Group 3 (East) N. 6th St. - N. Dr. Martin L. King Jr. Dr. to point north of W. Melvina St. N. 33rd St. - W. Center St. to W. Locust St. N. 33rd St. - W. North Av. to W. Meinecke Av. (retain speed humps) N. 42nd St. - W. Congress St. to W. Courtland Av. E. Albion St. - N. Farwell Av. to N. Warren Av. E. Concordia Av. - N. Humboldt Bl. to N. Pierce St. N. Hackett Av. - E. Kenwood Bl. to E. Hartford Av. N. Jefferson St. - E. Knapp St. to E. Ogden Av. (retain speed hump) W. Kilbourn Av. - N. 35th St. to point west of N. 38th St. E. Knapp St. - N. Jefferson St. to N. Broadway (retain speed hump) W. Mc. Kinley Av. - N. 21st St. to N. 26th St. (retain speed humps) W. Nash St. - W. Scranton Pl. to N. 51st Bl. E. Park Pl. - N. Lake Dr. to N. Downer Av. W. Richardson Pl. - N. 27th St. to N. 29th St. (retain speed humps) N. Summit Av. - E. Kane Pl. to E. North Av. W./N. Toronto St. - N. 35th St. to W. Hope Av. W. Wright St. - N. Teutonia Av. to N. 19th St.
05/13/2026 03:30 PM UTC
OFFICIAL NOTICE 40-1-2026
Granville Station Public Water Main Extension/Private Water Loop Extension - West Menard Road/North 80TH Street/8110 & 8120 West Brown Deer Road/Former Northridge Mall Property, Milwaukee, WI.
05/15/2026 03:30 PM UTC
OFFICIAL NOTICE 59-1-2026
Remote Bridge Upgrades at Multiple Structures over Milwaukee River
05/19/2026 03:30 PM UTC
OFFICIAL NOTICE 54-1-2026
PROJECT NO.1: SANITARY SEWER LATERAL AND LEAD SERVICE LINE REPLACEMENT & SUMP PUMP INSTALLATION IN: Area Bounded by North 54th Street to North 58th Street and West Vienna Avenue to West Capitol Drive
05/20/2026 03:30 PM UTC
OFFICIAL NOTICE 54-2-2026
PROJECT NO.2: SANITARY SEWER MANHOLE INSPECTION: Located at: Various Locations within the City of Milwaukee
05/20/2026 03:30 PM UTC
OFFICIAL NOTICE 31-1-2026
The general work requested is: THE INSTALLATION OF NON-INTRUSIVE DETECTION CAMERAS AT EXISTING SIGNALIZED INTERSECTIONS. Non-Intrusive Detection Grant 4 – ST320233401 Located at: 15 INTERSECTIONS, NORTH SIDE IN THE CITY OF MILWAUKEE (Wisconsin Department of Transportation ID No. 2984-29-94)
05/27/2026 03:30 PM UTC
OFFICIAL NOTICE 56-1-2026
46TH AND STATE STREET – RETAINING WALL REPLACEMENT
05/28/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
06/02/2026 03:30 PM UTC
10 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 52-1-2019
WATER MAIN RELAYS at the following locations: W. Daphne St. (WT410190660), N. Hastings St to N. 89th St. (26 working days); N. Hastings St. (WT410190659), W. Acacia St. to W. Kiehnau Ave. (7 working days); W. Acacia St. (WT410190658), N. Hastings St. to N. 89th St. (18 working days); W. Kiehnau Ave. (WT410190657), N. Hastings St. to N. 89th St. (24 working days); W. Brentwood Ave. (WT410190656), N. 83rd St. to N. 89th St. (46 working days); N. Fresno St. (WT410190655), W. Brentwood Ave. to N. 89th St. (26 working days) Note: Contractor to furnish and install approximately 5,690 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.
04/10/2019 03:30 PM UTC
OFFICIAL NOTICE 45-1-2019
PROJECT NO. 1: BIOSWALES IN: Located at: W. Bradley Rd. – 20’ +/- west of N. 51st St. to 198’ +/- east of Dretzka Park Roadway
04/09/2019 03:30 PM UTC
OFFICIAL NOTICE 53-1-2019
WATER MAIN RELAYS at the following locations: N. 70th St. (WT410190661), W. Silver Spring Dr. to W. Bobolink Av. (46 working days); N. 65th St. (WT410190662), W. Silver Spring Dr. to W. Carmen Av. (31 working days); N. 66th St. (WT410190663), W. Silver Spring Dr. to W. Thurston Av. (17 working days); N. 68th St. (WT410190664), W. Silver Spring Dr. to W. Florist Av. (71 working days); N. 61st St. (WT410190665), W. Carmen Av. to W. Kaul Av. (46 working days); N. 62nd St. (WT410190666), W. Bobolink Av. to W. Kaul Av. (31 working days); N. 63rd St. (WT410190667), W. Florist Av. to W. Kaul Av. (14 working days); W. Kaul Av. (WT410190668), N. 60th St. to N. 64th St. (26 working days); W. Bobolink Av. (WT410190669), N. 61st St. to N. 63rd St. (13 working days). (Note: Contractor to furnish and install approximately12,627 LIN. FT. 12", 8", 6" ductile iron pipe. city to furnish miscellaneous materials as shown on plans and proposed form.)
04/08/2019 03:30 PM UTC
OFFICIAL NOTICE 47-1-2019
WATER MAIN RELAYS at the following locations: W. Brentwood Av. (WT410180653), 40’ N/O W. Mill Rd. to N. 78th St. (14 working days); N. 44th St. (WT410180675), W. Green Tree Rd. to 530’ N/O W. Green Tree Rd. (13 working days); W. Parkland Av. (WT410180684), N. 51st Blvd. to N. Edgeworth Dr. (18 working days); N. Fairway Pl. (WT410180685), W. Parkland Av. to N. 55th St. (24 working days); N. 57th St. (WT410180686), N. Edgeworth Dr. to W. Luebbe La. (18 working days); N. Edgeworth Dr. (WT410180687), N. Highview Dr. to W. Luebbe La. (39 working days). (Note: Contractor to furnish and install approximately 5,658 lin. ft. of 8”, 6” and 16” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/05/2019 03:30 PM UTC
OFFICIAL NOTICE 19-1-2019
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, ETC.; Located at: ST216190107 – N. 35th St. - W. Wisconsin Ave. to W. Highland Blvd. N. Farwell Ave. - E. Locust St. to E. Kenwood Blvd. N. Holton St. - E. Keefe Ave. to E. Capitol Dr. N. Hopkins St. - N. 35th St. to 200' n/o W. Hampton Ave. N. Humboldt Bd. - E. Brady St. to E. Kane Pl. E. Kane Pl. - N. Warren Ave. to N. Humboldt Ave. N. Prospect Ave. - E. Locust St. to E. Kenwood Blvd. N. Water St. - E. Brady St. to N. Humboldt Ave.
04/04/2019 03:30 PM UTC
OFFICIAL NOTICE 56-1-2019
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, ETC.; Located at: ST216190101 – 2019 ADA Ramps for High Impact Paving Projects at Various Northside Locations
04/04/2019 03:30 PM UTC
OFFICIAL NOTICE 49-1-2019
2019 SANITARY MANHOLE REHABILITATION PROJECT
04/03/2019 03:30 PM UTC
OFFICIAL NOTICE 49-2-2019
SANITARY MANHOLE AND SEWER STRUCTURES INSPECTION: Located at: Various Locations
04/03/2019 03:30 PM UTC
OFFICIAL NOTICE 23-1-2019
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211180112 – S. Massachusetts Ave. - W. Duluth Ave. to W. Morgan Ave. ST211150136 – W. Eden Pl. - S. 8th St. to S. 11th St.
04/02/2019 03:30 PM UTC
OFFICIAL NOTICE 59-1-2019
100 LEAD SERVICE LINE REPLACEMENTS at various locations within the City of Milwaukee.
04/02/2019 03:30 PM UTC
781 - 790 of 1568 Solicitations
1 2 75 76 77 79 81 82 83 156 157