General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKINGS, SEWER WORK, WATER WORK, ETC.; TD08584031 – West Pierce Street - South 6th Street to South 9th Street West Virginia Street - South 6th Street to South 9th Street TD09484011 – South 5th Place - South Chase Avenue to West Burnham Street South 6th Street - West Hayes Avenue to South Chase Avenue West Maple Street - South 2nd Street to South 4th Street
05/06/2025 03:30 PM UTC
OFFICIAL NOTICE 35-1-2025
LS-38: LINCOLN ELECTRICAL UPGRADES PROJECT ELECTRICAL WORK TO REPLACE MEDIUM VOLTAGE SWITCHGEAR LINE-UP, AUTOMATION CONTROLS CABINET, AND RESTROOM RELOCATION AT THE MILWAUKEE WATER WORKS (MWW) LINCOLN STATION
05/13/2025 03:30 PM UTC
OFFICIAL NOTICE 56-1-2025
Election Operations Center & Southwest Shop – Boiler Replacement(s)
05/14/2025 03:30 PM UTC
OFFICIAL NOTICE 32-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8 REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: TD11584013 – In East Michigan Street – North Cass Street to North Lincoln Memorial Drive
05/15/2025 03:30 PM UTC
OFFICIAL NOTICE 13-1-2025
South 20th Street Culvert Rehabilitation
05/21/2025 03:30 PM UTC
OFFICIAL NOTICE 4-1-2025
Street Lighting LED upgrades CRP Area C: ST320240910 – South City Limits to East/West Oklahoma Avenue, Lake Michigan to West City of Milwaukee Limits Street Lighting Upgrades (Wisconsin Department of Transportation ID No. 2984-55-74)
05/22/2025 03:30 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 59-1-2018
NW-50 Florist Tank No.1 Rehabilitation and Appurtenance Modifications
04/26/2018 03:30 PM UTC
OFFICIAL NOTICE 68-1-2018
ERADICATE AND INSTALL PAVEMENT MARKINGS.
04/25/2018 03:30 PM UTC
OFFICIAL NOTICE 4-1-2018
STORM SEWER MAIN RELAY, STORM AND COMBINED SEWER MAIN LINING, & MANHOLE REPAIR AND LINING in: Located at: W. Ridge Ct. – N. Sherman Blvd. to A Point 140’ W. of N. Sherman Blvd. N. Sherman Blvd. – W. Wright St. to W. Hadley St. N. Sherman Blvd (E/S) – Alley N. of W. Roosevelt Dr. to 115’ N. of W. Ridge Ct. N. Sherman Blvd. (W/S) – W. Roosevelt Dr. to 550’ N. of W. Ridge Ct.
04/24/2018 03:30 PM UTC
OFFICIAL NOTICE 004-2-2018
COMBINED SEWER MAIN RELAY: Located at: N. 5th St. – N. Dr Martin Luther King Jr Dr. to W. Keefe Ave. N. 5th St. – W. Chambers St. to W. Ring St. N. 6th St. – W. Chambers St. to W. Burleigh St. W. Burleigh St. – N. Dr Martin Luther King Jr Dr. to N. 7th St.
04/24/2018 03:30 PM UTC
OFFICIAL NOTICE 004-3-2018
SANITARY MANHOLE REHABILITATION AT VARIOUS LOCATIONS
04/24/2018 03:30 PM UTC
OFFICIAL NOTICE 42-1-2018
INSTALLATION OF LIGHT EMITTING DIODE (LED) TRAFFIC SIGNAL MODULES 12-INCH.
04/23/2018 03:30 PM UTC
OFFICIAL NOTICE 48-1-2018
WATER MAIN RELAYS AND LEAD SERVICE LINE REPLACEMENTS at the following locations: N. Marshall St. (WT410150669), E. Pleasant St. to E. Brady St. (49 working days); W. Orchard St. (WT410150673), S. 13th St. to S. 15th St. (58 working days); S. 15th St. (WT410150674), W. Greenfield Ave. to W. Lapham Blvd. (59 working days); W. Lapham Blvd. (WT410110630), S. 12th St. to S. 15th Pl. (16 working days); N. 23rd St. (WT410160683), W. Fairmount Ave. to W. Lincoln Creek Pkwy. (66 working days); N. 22nd St. (WT410160684), W. Stark St. to W. Fairmount Ave. (16 working days). (Note: Contractor to furnish and install approximately 4,910 lin. ft. of 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/20/2018 03:30 PM UTC
OFFICIAL NOTICE 70-1-2018
LEAD SERVICE LINE REPLACEMENT, at 50 locations, by qualified City of Milwaukee licensed and bonded contractors. Qualified bidders shall have the necessary equipment and experience to replace lead service lines using trenchless methods. All locations will be emergency service line replacements due to a leak or failure. Each location will require either the full replacement of the water service line from the municipal water main up to the interior water meter setting, or, at locations where a portion of the service line was previously replaced with copper, the replacement of the remaining lead portion of the service line. When the existing water meter setting is not code compliant, work will also include a new meter setting. Work may include, but is not limited to, the procurement of all necessary permits, a site visit prior to work beginning, scheduling the installation with the property owner, traffic control, erosion control, saw-cutting, excavation, installation of a new copper service line utilizing trenchless technology (MWW approval is required for open cut installation), tapping of the water main, abandonment of the lead service line, installation of an updated water meter setting up to and including the outlet valve, reconnection to the interior building piping, code-compliant restoration of the electrical ground wire, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Locations will be at various sites throughout the City of Milwaukee. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
04/18/2018 03:30 PM UTC
OFFICIAL NOTICE 47-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 8” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.
04/17/2018 03:30 PM UTC
OFFICIAL NOTICE 49-1-2018
COUNTING, PROCESSING AND DEPOSITING PARKING METER COIN COLLECTIONS FOR THE CITY'S APRROXIMATELY 7,000+ PAID PARKING METER SPACES
04/10/2018 03:30 PM UTC
781 - 790 of 1449 Solicitations
1 2 75 76 77 79 81 82 83 144 145