General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 81-1-2025
PROJECT NO.1: ROADWAY NARROWING, PAVING, GREEN INFRASTRUCTURE, AND TRAFFIC SAFETY PROJECT IN: S. 1ST St. – S. Chase Ave. to W. Lincoln Ave.
08/07/2025 03:30 PM UTC
OFFICIAL NOTICE 91-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
08/08/2025 03:30 PM UTC
OFFICIAL NOTICE 78-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; Street Lighting Upgrades for: ST3202318100 – Street Lighting Improvement for Carbon Reduction Program @ Various Locations
08/15/2025 03:30 PM UTC
OFFICIAL NOTICE 90-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
08/19/2025 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 71-1-2018
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT (1/2), VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT (3/8), VARIABLE THICKNESS CONCRETE WALKS AND/OR CONCRETE DRIVEWAYS, REMOVE AND SALVAGE GRANITE PAVERS, CRACKING AND SEATING CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at: ST 212070113 – Alley Bounded By: W. Forest Home Ave., W. Ohio Ave., W. Oklahoma Ave., S. 43rd St., S. 44th St. - City Limits ST212160109 – Alley Bounded By: W. Hayes Ave., W. Lincoln Ave., S. 7th St., S. 8th St. ST212160108 – Alley Bounded By: W. Hayes Ave., W. Lincoln Ave., S. 8th St., S. 9th St. ST212160107 – Alley Bounded By: W. Cleveland Ave., S. 15th Pl., S. 16th St., KK River.
07/12/2018 03:30 PM UTC
OFFICIAL NOTICE 92-1-2018
PROJECT NO. 1: GREEN STREET BIOSWALES: Located at: S. 76th St. – 485' +/- South of W. Van Beck Ave to 190' +/- South of W. Ohio Ave.
07/11/2018 03:30 PM UTC
OFFICIAL NOTICE 102-1-2018
Milwaukee Fire Department Head Quarters Curtain Wall Refinishing 711 West Wells Street Milwaukee WI
07/10/2018 03:30 PM UTC
OFFICIAL NOTICE 90-1-2018
CONSTRUCTION OF 7” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, TRACK ZONE REMOVALS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, CUC WORK, WATER WORK, ETC.; Located at: ST211180104 - N. 41st St. - W. Meinecke Ave. to W. Wright St. ST211180116 - N. 52nd St. – W. Lisbon Ave. to W. Center St.
07/10/2018 03:30 PM UTC
OFFICIAL NOTICE 99-1-2018
WATER MAIN RELAYS at the following locations: S. 18th St (WT410180625), W. Whitaker Ave. to W. Bottsford Ave. (10 working days); W. Whitaker Ave. (WT410180626), 360’ E/O S. 18th St to S 18th St. (10 working days); S. Logan Ave (WT410180632), S. Whitnall Ave to E. Price Ct. (58 working days); E. Van Norman Ave (WT410180633), S. Lenox St to S. Logan Ave. (10 working days). (Note: Contractor to furnish and install approximately 3,856 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
07/09/2018 03:30 PM UTC
OFFICIAL NOTICE 103-1-2018
WATER MAIN RELAYS at the following locations: W. Fairmount Ave. (WT410180646), N. 47th St. to 30 Ft. E/O N. 48th St. (10 working days); N. 47th St. (W/S) (WT410180647), W. Fairmount Ave. to W. Villard Ave. (38 working days); N. 48th St. (WT410180648), W. Luscher Ave. to W. Fairmount Ave. (24 working days); W. Luscher Ave. (WT410180649), N. 48th St. to N. 49th St. (10 working days); N. 49th St. (WT410180650), W. Luscher Ave. to W. Eggert Pl. (69 working days). (Note: Contractor to furnish and install approximately 5,017 lin. ft. of 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
07/03/2018 03:30 PM UTC
OFFICIAL NOTICE 81-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE PAVEMENT, CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, TRACK ZONE REMOVALS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, CUC WORK, WATER WORK, ETC.; Located at: ST211180113 - N. Summit Ave. - E. Locust Ave. to E. Kenwood Blvd.
06/29/2018 03:30 PM UTC
OFFICIAL NOTICE 006-1-2018
SANITARY AND COMBINED SEWER MAIN RELAY IN: Located at: S. 69th St. – 325' +/- North of W. Cleveland Ave. to 70' +/- North of W. Cleveland Ave. S. Austin St. – E. Norwich St. to 300' +/- South of E. Norwich St. S. Burrell St. – E. Norwich St. to 300' +/- South of E. Norwich St. E. Euclid Ave. – S. Mabbett Ave. to S. Pennsylvania Ave. E. Norwich St. - 100' +/- West of S. Burrell St. to S. Whitnall Ave.
06/26/2018 03:30 PM UTC
OFFICIAL NOTICE 100-1-2018
50 LEAD SERVICE LINE REPLACEMENTS at childcare facilities within the City of Milwaukee.
06/22/2018 03:30 PM UTC
OFFICIAL NOTICE 31-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, ETC.; Construct Asphalt Speed Humps at the Following Locations: (ST211180126) N. 25th St. – W. Melvina St. to W. Capitol Dr. (1 speed hump) (ST211180140) N. 26th St. – W. Auer Ave. to W. Townsend St. (2 speed humps) (ST211170191) N. 26th Sr. – W. Hope Ave. to W. Roosevelt Dr. (1 speed hump) (ST211180147) N. 33rd St. – W. Lloyd St. to W. North Ave. (2 speed humps) (ST211170129) N. 37th St. – W. Lloyd St. to W. Garfield Ave. (1 speed hump) (ST211180151) N. 44th St. – W. Meinecke Ave. to W. Wright St. (1 speed hump) (ST211180152) N 45th St. – W. Glendale Ave. to W. Hampton Ave. (3 speed humps) (ST211170148) N. 47th St. – W. Hampton Ave. to W. Fairmount Ave. (2 speed humps) (ST211180129) N. 48th St. – W. Meinecke Ave. to W. Wright St. (1 speed hump) (ST211180154) N. 48th St. – W. Villard Ave. to W. Rohr Ave. (1 speed hump) (ST211180143) N. 63rd St. – W. Capitol Dr. to W. Fiebrantz Ave. (1 speed hump) (ST211180145) S. 7th St. – W. Becher St. to W. Rogers St. (1 speed hump) (ST211160127) S. 7th St. – W. Lincoln Ave. to W. Becher St. (2 speed humps) (ST211180123) S. 7th St. – W. Holt Ave. to W. Ohio Ave. (1 speed hump) (ST211180138) S. 18th St. – W. Arthur Ave. to W. Hayes Ave. (2 speed humps) (ST211180125) S. 18th St. – W. Hayes Ave. to W. Lincoln Ave. (1 speed hump) (ST211180127) S. 29th St. – W. Lincoln Ave. to W. Grant St. (1 speed hump) (ST211180128) S. 30th St. – W. Hayes Ave. to W. Arthur Ave. (1 speed hump) (ST211180141) S. 31st St. – W. Scott St. to W. National Ave. (2 speed humps) (ST211180130) W. Chambers St. – N. 26th St. to N. 27th St. (1 speed hump) (ST211170163) W. Fairmount Ave. – N. 24th St. to N. 27th St. (4 speed humps) (ST211170164) W. Fairmount Ave. – N. Green Bay Ave. to N. 24th St. (5 speed humps)
06/20/2018 03:30 PM UTC
791 - 800 of 1490 Solicitations
1 2 76 77 78 80 82 83 84 148 149