General Info

Business Logo

Ohio Department of Rehabilitation and Correction

4545 Fisher Rd, Columbus, OH 43228-8923
(614) 971-9347

Mission: Reduce Recidivism Among Those We Touch

Standard Documents

Name * Description
f110-06-equalemploymentopportunityrequirements.docx (28.6 KB)
Equal Employment Opportunity Requirements Form
m140-00_45_39-edge_affidavit_fillable.pdf (31.7 KB)
EDGE Affidavit
m140-00_45_13-bidders_qualifications.pdf (13.9 KB)
Bidder’s Qualifications
m140-00_43_13-bid_security_form.pdf (28.8 KB)
Bid Security Form
supplier_new.pdf (311 KB)
Supplier Information Form - New Supplier
irs_w-9.pdf (117 KB)
Request for Taxpayer Identification Number and Certification
eft_payment_authorization.pdf (584 KB)
Authorization Agreement for Direct Deposit of EFT Payments
m160-00_21_13.ebv0713-instructionstobidders.pdf (75.5 KB)
General Contracting Instructions to Bidders
m160-00_10_00.ebv0713-solicitation.docx (63.3 KB)
General Contracting Solicitation template
ohio_revised_code_section_153.08.pdf (33.3 KB)
Statute permitting electronic bidding in Ohio
ohio_administrative_code_section_153.1-8-01.pdf (37.2 KB)
Administrative rule on electronic bidding in Ohi
m299-03v0313-publicbidadvertisement-ebid.docx (27 KB)
Public Bid Advertisement template
12 Documents

Upcoming Solicitations

Number Deadline
DRC-25L207
LorCI Separation Fence & Server Room HVAC 2075 South Avon Beldon Rd, Grafton, OH 44704 Lorain Co. Pre-Bid Meeting: 06/18/2025 @ 10 AM on site
07/02/2025 02:00 PM UTC
DRC-23L075-02-01
NCI Sally Port Noble Correctional Institution 15708 McConnelsville Rd, Caldwell, OH 43724 Replacement of northern vehicle gate, crash barrier, fence line and pedestrian gate from the Sally Port into the facility. Alternate #01 – Demolition of the original southern vehicle gate, crash barrier, fence line and pedestrian gate once the northern gate is operational.
07/08/2025 02:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
DRC-19L040
Pickaway Correctional Institution WWTP Wastewater Renovations. Filters 4 and 5 shall have media and clay tile block underdrains replaced or rehabilitated. Solids Contact Units shall be rehabilitated. Gravity Thickener rehabilitated and installation of one additional gravity thickener. Demo of and new Digester Pump.
01/23/2020 03:00 PM UTC
DRC-19L072
MCI Air Balance HVAC Upgrades, Marion Correctional Institution
01/17/2020 07:00 PM UTC
DRC-19L041 Rebid
Provide all labor, equipment and materials as indicated in the Contract Documents. All necessary items in the project shall be included within this bid package, surface preparation, new finishes, equipment removal and reinstallation. Work Hours: 7:00 am to 5:00 pm; Owner prefers 4-10 hour shifts to reduce clearance time through sallyport. However, 5-8 hour shifts can be accommodated.
01/15/2020 07:00 PM UTC
DRC-19L007
Reference 01 10 00 Summary: The work includes replacing 2 entry man swing gates and associated lock mechanisms (not the wiring), cutting and repairing concrete surfaces by gates only as possible (dowel to existing remaining concrete), and clean and paint existing crash bar. No extra razor wire or controls are needed. Replace drivethru gate frame and fencing fabric and gate drive and guide mounting angle mechanism replacement (not structurally mounted posts).
12/26/2019 07:00 PM UTC
DRC-19L081
Grafton Correctional Institute Greenhouse Project
12/18/2019 06:00 PM UTC
DRC-19L080
Lorain (LORCI) Showers Renovation, Phase 2 The Project consists of replacing 39 showers in a total of five Housing Units located in two buildings at the Lorain Correctional Institution. The Work includes selective demolition of finishes and plumbing systems, ceramic tile finishes, painted finishes, and shower plumbing fixtures, related plumbing, and other Work indicated in the Contract Documents.
12/16/2019 10:00 PM UTC
DRC-19L106
PCI Meat Packing Plant Roof Repair Demo and Replace Roofing system, 2 new ladders, new gutters, new downspouts, etc.
12/16/2019 03:30 PM UTC
DRC-19L041
Provide all labor, equipment and materials as indicated in the Contract Documents. All necessary items in the project shall be included within this bid package, surface preparation, new finishes, equipment removal and reinstallation. Work Hours: 7:00 am to 5:00 pm; Owner prefers 4-10 hour shifts to reduce clearance time through sallyport. However, 5-8 hour shifts can be accommodated.
12/12/2019 05:00 PM UTC
DRC-19L052
Door replacement and door control upgrade at Lima Allen-Oakwood Correctional Facility
12/06/2019 05:00 PM UTC
DRC-19L067
CTA Plumbing Upgrade Phase II Orient, Pickaway County, Ohio
10/04/2019 06:00 PM UTC
141 - 150 of 234 Solicitations
1 2 11 12 13 15 17 18 19 23 24