General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1279411-Durham Center-Heating Water Piping-Replacement
This project will replace the heating system piping throughout the Durham Center. The scope of work includes, but is not limited to, the removal of existing piping, risers, valves and supports. Included is the replacement of all materials, including new riser valves to enhance system control and efficiency. Any abatement of hazardous materials will be handled by the university.
06/26/2025 07:01 PM UTC
CP1280467-Agronomy Hall-Room G0525-Renovation
The scope of work includes, but is not limited to, classroom renovation involving demolition of existing built-in island, shelving and pegboards, and installation of new light fixtures with dimming capabilities, new rubber flooring, painting, and new classroom furniture.
07/01/2025 07:01 PM UTC
CP1275701-Durham Center-Room 0139-Remodel
This project will remodel a previously occupied computer lab space to include both open office space and private office spaces. This project includes, but is not limited to, new walls, flooring, paint, and furniture; additional mechanical equipment and controls for private offices; existing mechanical modifications; sprinkler modifications; and new lighting and lighting controls.
07/08/2025 07:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP1233198-Pearson Hall-Electrical Panel-Replacement
This project includes, but is not limited to, removing existing electrical panelboards and replacing them with new equipment in different locations. New electrical branch circuit panelboards, panelboard feeders, and branch circuits to be provided. Stairwell and corridor modifications will be provided to secure electrical panel enclosures.
03/11/2025 07:01 PM UTC
CP1004288-CYTown-Parking and Infrastructure Improvements-Parking Lot B5
The project consists of, but is not limited to, construction of parking lot B5 including storm sewer, subgrade preparation, PCC paving, HMA paving, parking lot lighting and surface restoration.
02/27/2025 08:01 PM UTC
CP1260883-Administrative Services Building-First and Second Floor-Remodel
This project will remodel approximately 42,500 square feet of office and conference room space on the first and second levels of the Administrative Services Building, as well as replace furniture in more than half of the building. The scope of the remodel work includes, but is not limited to, the removal of existing pendant light fixtures, drywall partitions, doors, and transom windows, as well as the removal of the existing ceiling systems. New improvements include creating three additional offices, six team collaboration rooms, and a dedicated lactation room; updating finishes and furniture; and modifying mechanical, electrical, plumbing, and technology MEPT systems as required.
02/25/2025 08:01 PM UTC
CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
02/20/2025 08:01 PM UTC
CP1044573-Lloyd Veterinary Medical Center-Large Animal Ward 3-Expansion
This project will add 22,043 square feet of space to the existing facility. The project includes four building extensions and one free-standing structure. The additions are enhanced reproduction, critical care, horse rehabilitation, theriogenology, and a free-standing feeding and bedding facility. The new building will comprise of modest demolition of the existing wards and large animal hospital, as well as the construction of three expansions and infill between wards one and two, using materials and structures that are compatible with the current facilities. To support the additions, new services such as plumbing, HVAC, electrical power, lighting, fire protection, telecommunications, and security will be implemented. The present hospital and wards will continue to operate during the construction period, and any disruptions to services, deliveries, and daily operations must be managed with the ISU construction manager and the College of Veterinary Medicine Staff.
02/20/2025 08:01 PM UTC
CP1172827-State Gymnasium-Front Entry-Improvements
This project includes, but is not limited to, improvements to the front entry lobby, front checkout desk, and associated access control systems serving the east and west buildings of the State Gymnasium.
02/13/2025 08:01 PM UTC
CP1159926-Maple Willow Larch Commons-Seasons Marketplace-Remodel-Venues
This phased project will update the front-of-house food service venues, circulation areas, and main entrance of the Seasons Marketplace at Maple Willow Larch Commons. Renovations include updating food service venue lines, food service equipment, and dining spaces. Work also includes associated modifications to mechanical, electrical, plumbing, and communications systems to accommodate food service venue upgrades.
01/16/2025 08:01 PM UTC
CP965415-Scheman Building-Freight Elevators-Improvements
This project will upgrade the freight elevators in the Scheman Building. The scope of work includes, but is not limited to replacement of the doors, controllers, and door operating equipment in accordance with current code requirements.
01/16/2025 08:01 PM UTC
CP1187632-Howe Hall-Roof Replacement-Section M
This project will remove the existing roof system down to the deck and replace with a new roofing system. The scope of work includes, but is not limited to, an EPDM (ethylene propylene diene monomer rubber) system designed for a minimum life expectancy of 25 years; new roof insulation to meet current energy codes; and roof access improvements to meet university standards
01/14/2025 08:01 PM UTC
CP1146935-Utilities-Switchgear Vault 24 and 25-Replacement
This project replaces two high-voltage electrical Switches, 24 and 25, with new switches near Estes Hall and Carver Hall, respectively. The new Switch 24 will be located at an above-ground pad north of Estes Hall. The new Switch 25 will be located in a new underground vault west of the existing vault. In both cases, the existing vaults will remain, repurposed to aid future cable installations. New underground conduit will also be added to each of the new vaults, and a new high-voltage cable will be installed between Switch 25 and Estes Hall.
01/14/2025 08:01 PM UTC
11 - 20 of 367 Solicitations
2 4 5 6 7 8 9 36 37