General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1271058-Hamilton Hall-Room 0002-Remodel
This project will remodel the existing studio space. The scope of work includes, but is not limited to, removing a window from the vestibule wall and installing it in the control room wall; cutting an opening in the vestibule wall for a new window; cutting a large view window into the interior vestibule wood door; and painting all walls, door and window frames. This project also includes numerous lighting additions and upgrades, as well as a large amount of AV equipment.
08/21/2025 07:01 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
CP002439-East of University Boulevard Site Improvements-Recreation Services-Foot Wash
Project scope includes adding a foot wash station to the sand volleyball courts.
04/10/2025 07:01 PM UTC
CP1251558-Parking Lots 2025-Pavement Preservation
This project includes, but is not limited to, reconstruction and utility improvements in Parking Lots 8, 16 and 36. Parking lot work will include concrete lot reconstruction, sidewalks, parking lot lighting, and site restoration. We will also work with Utilities to coordinate necessary steam tunnel repairs and replacement of a high voltage electric line in Lot 8 and a new watermain and services in Lot 36. Utilities will provide funding for these improvements after preliminary design and estimates are complete.
04/01/2025 07:01 PM UTC
CP1200878-Beyer Hall-Swimming Pool-Electrical Repairs
Replacement of steel conduits affected by corrosion. Replacement of existing RW insulation conductors with modern grounded circuits. Replacement of antiquated panelboards with new counterparts rated for their locations (NEMA 1 and NEMA 4X SS).
03/27/2025 07:01 PM UTC
CP1261458-Utilities-Power Plant-Pressure Reducing Valve-Replacement
This project will increase the current capacity to directly convert 400 psi steam to heating steam by 100,000 pounds per hour. This project includes, but is not limited to, scanning the current plant piping, design solution for new piping arrangement, replacement of Pressure Reducing Valve and Desuperheater Valve, and the reconfiguration of pipe directly towards heating header.
03/18/2025 07:01 PM UTC
CP1233198-Pearson Hall-Electrical Panel-Replacement
This project includes, but is not limited to, removing existing electrical panelboards and replacing them with new equipment in different locations. New electrical branch circuit panelboards, panelboard feeders, and branch circuits to be provided. Stairwell and corridor modifications will be provided to secure electrical panel enclosures.
03/11/2025 07:01 PM UTC
CP1004288-CYTown-Parking and Infrastructure Improvements-Parking Lot B5
The project consists of, but is not limited to, construction of parking lot B5 including storm sewer, subgrade preparation, PCC paving, HMA paving, parking lot lighting and surface restoration.
02/27/2025 08:01 PM UTC
CP1260883-Administrative Services Building-First and Second Floor-Remodel
This project will remodel approximately 42,500 square feet of office and conference room space on the first and second levels of the Administrative Services Building, as well as replace furniture in more than half of the building. The scope of the remodel work includes, but is not limited to, the removal of existing pendant light fixtures, drywall partitions, doors, and transom windows, as well as the removal of the existing ceiling systems. New improvements include creating three additional offices, six team collaboration rooms, and a dedicated lactation room; updating finishes and furniture; and modifying mechanical, electrical, plumbing, and technology MEPT systems as required.
02/25/2025 08:01 PM UTC
CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
02/20/2025 08:01 PM UTC
CP1044573-Lloyd Veterinary Medical Center-Large Animal Ward 3-Expansion
This project will add 22,043 square feet of space to the existing facility. The project includes four building extensions and one free-standing structure. The additions are enhanced reproduction, critical care, horse rehabilitation, theriogenology, and a free-standing feeding and bedding facility. The new building will comprise of modest demolition of the existing wards and large animal hospital, as well as the construction of three expansions and infill between wards one and two, using materials and structures that are compatible with the current facilities. To support the additions, new services such as plumbing, HVAC, electrical power, lighting, fire protection, telecommunications, and security will be implemented. The present hospital and wards will continue to operate during the construction period, and any disruptions to services, deliveries, and daily operations must be managed with the ISU construction manager and the College of Veterinary Medicine Staff.
02/20/2025 08:01 PM UTC
CP1172827-State Gymnasium-Front Entry-Improvements
This project includes, but is not limited to, improvements to the front entry lobby, front checkout desk, and associated access control systems serving the east and west buildings of the State Gymnasium.
02/13/2025 08:01 PM UTC
11 - 20 of 371 Solicitations
2 4 5 6 7 8 9 37 38