CP1303338-Howe Hall-Room 1200 Remodel
****THIS BID HAS BEEN CANCELLED****
This project will remodel room 1200 in Howe Hall. Work includes, but is not limited to: demolition of existing cubicles; construction of two offices and a front reception space; associated mechanical and electrical improvements; painting; carpeting; and lighting.
| 04/02/2026 07:01 PM UTC |
|
CP1300765-Town Engineering Building-Rooms 142, 148 and 156 Remodel
This project includes interior renovations to two existing lab spaces (Rooms 142 and 148) and one storage room (Room 156) at the west end of Town Engineering along the existing loading dock, totaling 3,000 square feet. The existing labs will be renovated to better support existing space uses and the existing storage room will be renovated into a cleaning and storage space. Demolition work includes but is not limited to; demolition of two existing concrete masonry walls, concrete slab, casework, and exterior access doors. New work includes but is not limited to: exterior wall patching and finishes. Mechanical scope includes but is not limited to: demolition of existing gas lines, new dust collection system, and replacement of existing grilles and diffusers. Electrical scope includes but is not limited to: renovations to power and lighting systems.
| 04/07/2026 07:01 PM UTC |
|
CP1295340-Institutional Roads 2026-Pavement Preservation
Planned work includes, but is not limited to, asphalt and concrete improvements on various Institutional Roads segments across campus.
| 04/14/2026 07:01 PM UTC |
|
CP1248808-Lake LaVerne-Improvements
The project consists of, but is not limited to, dewatering, excavation and disposal of lakebed sediment from Lake LaVerne as well as pavement removal, regrading of the lakebed, reshaping the lake edge, bank stabilization, placement of limestone outcropping and fieldstone along the lake edge, cut limestone walls, extending lake overflow channel, PCC sidewalks, railing replacement, site lighting, and seeding.
| 04/16/2026 07:01 PM UTC |
|
CP1300581-Memorial Union-Roof Sections B, C, G, J, K, W, Z and 1 Replacement
MEMORIAL UNION-ROOF REPLACEMENT-SECTIONS G, Z, 1
This project will replace Memorial Union roof sections G, Z, and 1. The scope of work includes, but is not limited to, demolishing existing roof systems and replacing them with new roofing systems.
| 04/21/2026 07:01 PM UTC |
|
CP1289859-Beardshear Hall-Rooms 0530, 0810, 0880, 3410 Improvement
Scope for Accounts Receivable, ID Card Office, Treasury, and a shared space in 3410 Beardshear for Accounts Receivable and Financial Aid. Accounts Receivable 0810 Beardshear: Reconfigure space to accommodate the ID Card Office 0810A: Reconfigure current Conference Room into two workstations and a small kitchenette 0810C: Reconfigure current office into two work stations to support ID Card 0880: Reconfigure AR Front Office to move kitchenette out and add small student workstations 0530 Beardshear: Remodel current card office for Treasury space 3410 Beardshear: Update paint and carpet, in addition to office furniture for 3410A, 3410C to allow for shared workspace offices
| 04/23/2026 07:01 PM UTC |
|
CP1275129-Linden Residence Hall-North Retaining Wall-Repairs
This project will repair and replace segments of the retaining wall and replace stairs on the north side of Linden Residence Hall. The scope of work includes, but is not limited to, retaining wall footing and masonry replacement, site lighting, concrete stairs, sidewalk replacement, landscaping, and site drainage improvements. An accessible pedestrian and equipment access route will be provided to the plaza level.
| 04/28/2026 07:01 PM UTC |
| Number | Deadline |
|---|---|
|
CP1259884-Stephens Auditorium-Utility Lines-Repair
This project will make corrections to certain sanitary drains currently tied-in to the storm sewer system. The scope of work includes, but is not limited to, permanently sealing or rerouting drains from an electrical room, two mechanical rooms, and one air handling unit.
| 05/29/2025 07:01 PM UTC |
|
CP1119832-Beardshear Hall-Window Repairs-Phases 1 and 2-Phase 2
This project includes, but is not limited to, the restoration of existing wood windows and door frames at Beardshear Hall. All loose paint will be scraped off and any holes, splits, and damage to the existing wood frames will be patched and repaired to match existing shapes and sizes. The restoration includes professional repainting with premium exterior wood primer and paint. The existing original paint on the frames contains lead so all contractors working on this project will be required to adhere to the EPA Renovation, Repair, and Painting rule, which requires Lead Safe Work Practices.
| 05/22/2025 07:01 PM UTC |
|
CP1253073-Communications Building-Suite 1200-Remodel
This project will remodel approximately 4,100 GSF in Communications Building Suite 1200, including rooms 1211, 1226, and 1227. Work includes, but is not limited to, demolition, construction, mechanical and electrical improvements, paint, carpet, lighting, and furniture.
| 05/13/2025 07:01 PM UTC |
|
CP1173440-Kildee Hall-AHU4 and AHU5-Replacement
This project consists of making modifications to complete a phased replacement of AHU4
and AHU5 in Kildee Hall. The work shall include, but is not necessarily limited to,
demolition of existing systems and components indicated to be removed, relocate
ductwork and piping to accommodate new AHU, providing new electrical feeds to new
AHU and existing equipment, adding a new dedicated outdoor AHU4K to serve the east
laboratory area, along with associated ductwork and piping, providing new controls for
added mechanical equipment, and electrical equipment installation, etc.
| 04/17/2025 07:01 PM UTC |
|
CP002439-East of University Boulevard Site Improvements-Recreation Services-Foot Wash
Project scope includes adding a foot wash station to the sand volleyball courts.
| 04/10/2025 07:01 PM UTC |
|
CP1251558-Parking Lots 2025-Pavement Preservation
This project includes, but is not limited to, reconstruction and utility improvements in Parking Lots 8, 16 and 36. Parking lot work will include concrete lot reconstruction, sidewalks, parking lot lighting, and site restoration. We will also work with Utilities to coordinate necessary steam tunnel repairs and replacement of a high voltage electric line in Lot 8 and a new watermain and services in Lot 36. Utilities will provide funding for these improvements after preliminary design and estimates are complete.
| 04/01/2025 07:01 PM UTC |
|
CP1200878-Beyer Hall-Swimming Pool-Electrical Repairs
Replacement of steel conduits affected by corrosion. Replacement of existing RW insulation conductors with modern grounded circuits. Replacement of antiquated panelboards with new counterparts rated for their locations (NEMA 1 and NEMA 4X SS).
| 03/27/2025 07:01 PM UTC |
|
CP1261458-Utilities-Power Plant-Pressure Reducing Valve-Replacement
This project will increase the current capacity to directly convert 400 psi steam to heating steam by 100,000 pounds per hour. This project includes, but is not limited to, scanning the current plant piping, design solution for new piping arrangement, replacement of Pressure Reducing Valve and Desuperheater Valve, and the reconfiguration of pipe directly towards heating header.
| 03/18/2025 07:01 PM UTC |
|
CP1233198-Pearson Hall-Electrical Panel-Replacement
This project includes, but is not limited to, removing existing electrical panelboards and replacing them with new equipment in different locations. New electrical branch circuit panelboards, panelboard feeders, and branch circuits to be provided. Stairwell and corridor modifications will be provided to secure electrical panel enclosures.
| 03/11/2025 07:01 PM UTC |
|
CP1004288-CYTown-Parking and Infrastructure Improvements-Parking Lot B5
The project consists of, but is not limited to, construction of parking lot B5 including storm sewer, subgrade preparation, PCC paving, HMA paving, parking lot lighting and surface restoration.
| 02/27/2025 08:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.