General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1253073-Communications Building-Suite 1200-Remodel
This project will remodel approximately 4,100 GSF in Communications Building Suite 1200, including rooms 1211, 1226, and 1227. Work includes, but is not limited to, demolition, construction, mechanical and electrical improvements, paint, carpet, lighting, and furniture.
05/13/2025 07:01 PM UTC
CP1259884-Stephens Auditorium-Utility Lines-Repair
This project will make corrections to certain sanitary drains currently tied-in to the storm sewer system. The scope of work includes, but is not limited to, permanently sealing or rerouting drains from an electrical room, two mechanical rooms, and one air handling unit.
05/22/2025 07:01 PM UTC
CP1119832-Beardshear Hall-Window Repairs-Phases 1 and 2-Phase 2
This project includes, but is not limited to, the restoration of existing wood windows and door frames at Beardshear Hall. All loose paint will be scraped off and any holes, splits, and damage to the existing wood frames will be patched and repaired to match existing shapes and sizes. The restoration includes professional repainting with premium exterior wood primer and paint. The existing original paint on the frames contains lead so all contractors working on this project will be required to adhere to the EPA Renovation, Repair, and Painting rule, which requires Lead Safe Work Practices.
05/22/2025 07:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP1243948-Patterson Hall-Rooms 1140, 1142, and 1144-Remodel
This project will remodel rooms 1140, 1142, and 1144 into a new lab space. Work includes, but is not limited to, new flooring, cabinetry, lights, and finish upgrades.
09/05/2024 07:01 PM UTC
CP1241528-Parks Library-Tiers-Lighting Replacement
This project includes, but is not limited to replacing the ceiling mounted light fixture interiors and lamps on each of the seven (7) floors in the tiers within the I.S.U. Parks Library with new “LED retrofit kits” as detailed on the plan sheets. Light fixture and building wiring will also be replaced as indicated on the plan sheets. ALTERNATE ONE BID: In lieu of LED retrofit kits, replace the ceiling mounted light fixtures (housing, interior and lamps) with new light fixtures as detailed on the plan sheets.
08/15/2024 07:01 PM UTC
CP002660-Curtiss Farm-Plant and Seed Facility-Remodel
This project will consist of an addition to or partitioning of space currently used by the Plant Sciences Institute in order to separate critical drying activities for research. The project includes, but is not limited to, finish, mechanical, and equipment upgrades as needed.
08/13/2024 07:01 PM UTC
CP1243665-Frederiksen Court Community Center-RTU-Replacement
This project includes, but is not limited to, the replacement of six RTUs at the Frederiksen Court Community Center.
07/09/2024 07:01 PM UTC
CP1240383-Utilities-Power Plant-Service Water Pump-Replacement
This project includes, but is not limited to, replacing the current 2 service water pumps with 4 service water pumps with VFDs (variable frequency drive), modified piping, manual valves, and new control valves.
06/25/2024 07:01 PM UTC
CP1226590-Institutional Roads 2024-University Boulevard and 6th Street-Signal Replacement
This project will replace the existing traffic signals with new signals that meet current traffic control standards. Scope of work includes, but is not limited to, new signal poles, heads, controllers, countdown timers on the crosswalks, radar-based vehicle and bicycle detection, left turn flashing arrows, leading pedestrian interval phasing, ADA compliant crosswalk controls, and concrete patching in the intersection.
06/18/2024 07:01 PM UTC
CP1200333-Sweeney Hall-Rooms 2038 and 2058-Remodel
This project includes, but is not limited to, remodeling two adjacent laboratories to connect them and add the infrastructure needed for research. Work will include new data, lighting, ceilings, finish patch and repair as needed, corrected water and air locations, and new lab casework.
06/11/2024 07:01 PM UTC
CP1175069-ISU Child Care Center at Veterinary Medicine-Remodel
This project includes, but is not limited to, replacement of flooring and wall base, countertops, and an exterior door. Work also includes replacing wood trim at five windows and replacement of thirteen window units.
05/30/2024 07:01 PM UTC
CP1234647-Patterson Hall-Rooms 2119 and 2119A-Remodel
This project will remodel an existing research lab to accommodate new equipment for needed research. This project includes, but is not limited to, abatement of the existing floor and replacing it with new floors, replacing existing casework including wall cabinets, new lighting, and updating lab safety features to accommodate the new layout.
05/23/2024 07:01 PM UTC
CP1232074-Black Engineering-Room 1056-Remodel
This project will remodel room 1056 in Black Engineering to remove obsolete equipment and install the air handler unit being removed from LeBaron Hall. The project includes, but is not limited to, new ductwork and electrical, a new exhaust fan, gas connections, a toxic gas cabinet, and refinishing the floor.
05/16/2024 07:01 PM UTC
31 - 40 of 362 Solicitations
1 2 4 6 7 8 9 36 37