CP1271058-Hamilton Hall-Room 0002-Remodel
This project will remodel the existing studio space. The scope of work includes, but is not limited to, removing a window from the vestibule wall and installing it in the control room wall; cutting an opening in the vestibule wall for a new window; cutting a large view window into the interior vestibule wood door; and painting all walls, door and window frames. This project also includes numerous lighting additions and upgrades, as well as a large amount of AV equipment.
| 08/21/2025 07:01 PM UTC |
Number | Deadline |
---|---|
CP002439-East of University Blvd-Site Improvements-Recreation Svcs & Field Lighting-Foot Wash
Project scope includes adding a foot wash station to the sand volleyball courts.
| 12/05/2023 08:01 PM UTC |
CP1159926-Maple Willow Larch Commons-Seasons Marketplace-Remodel
The project will remodel portions of the back of house in the Seasons Marketplace dining facility at the Maple Willow Larch Commons. Back of house restrooms and food preparation areas will be updated due to deteriorating finishes, code and standards compliance, equipment upgrades, and improved workflows.
| 11/16/2023 08:01 PM UTC |
CP1161151-Utilities-Veenker Memorial Golf Course-Well Installation
The project will install a water well and associated small pump house on Veenker Memorial Golf Course to provide water for course irrigation. The new well will replace a recently failed water line running between the main campus and the golf course irrigation pond.
| 11/09/2023 08:01 PM UTC |
CP1164931-Armstrong Memorial Research and Demonstration Farm-Machine Storage Building
The project consists of, but is not limited to, design and construction of a machine storage building. The building will be approximately 7,200 gsf, will be post frame construction, and will have metal roofing and siding.
| 10/24/2023 07:01 PM UTC |
CP1119386-Student Innovation Center-Administration Suite-Remodel
The project consists of, but is not limited to, the remodeling of rooms 2117, 2119, and 2120 to accommodate the expansion of the existing administration office suite currently located in rooms 2118 and 2118A of the Student Innovation Center. Work includes demolition of interior space including walls and finishes. New work includes new walls, finishes, and modified mechanical and electrical work to support the remodel.
| 10/19/2023 07:01 PM UTC |
CP1161151-Utilities-Veenker Memorial Golf Course-Well Installation
The project consists of, but is not limited to, the installation of an irrigation well, pump, electrical service and associated piping.
| 08/10/2023 07:01 PM UTC |
CP1095296-Beardshear Hall-Room 1350-Remodel
This project includes, but is not limited to, remodeling the existing office suite and adjacent treasurer's office. The existing conference room will be expanded, individual office spaces will be created, and the interior finishes updated.
| 08/08/2023 07:01 PM UTC |
CP1001182-Town Engineering Building-Facility and Infrastructure-Improvements-480V Electrical and Chilled Water
This project consists of, but is not limited to, tap existing chilled water mains in basement and install chilled water piping to new heat exchanger in the basement mechanical room. Install pump, air/dirt separator, expansion tank and process water loop piping for two electrohydraulic pumps. Tap existing 480V service, install new disconnect, two new panels, conduit, wiring and hook-ups for concrete robot, two stud welders, two hydraulic pumps and one process chilled water pump and VFD.
| 08/01/2023 07:01 PM UTC |
CP1166074-Reiman Gardens-Dunlap Courtyard-Pavement Improvement
The project consists of, but is not limited to, removal of existing gravel walks; installation of new PCC paving and concrete pavers, installation of perforated tiles, irrigation, and finish grading/topsoil.
| 07/27/2023 07:01 PM UTC |
CP1008416-ISU Child Care Center at Veterinary Medicine-Improvements
This project includes, but is not limited to, the replacement of heating and cooling units, installation of a switch for garbage disposal, and updating of HVAC controls.
| 07/20/2023 07:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.