CP1253073-Communications Building-Suite 1200-Remodel
This project will remodel approximately 4,100 GSF in Communications Building Suite 1200, including rooms 1211, 1226, and 1227. Work includes, but is not limited to, demolition, construction, mechanical and electrical improvements, paint, carpet, lighting, and furniture.
05/13/2025 07:01 PM UTC
CP1259884-Stephens Auditorium-Utility Lines-Repair
This project will make corrections to certain sanitary drains currently tied-in to the storm sewer system. The scope of work includes, but is not limited to, permanently sealing or rerouting drains from an electrical room, two mechanical rooms, and one air handling unit.
05/22/2025 07:01 PM UTC
CP1119832-Beardshear Hall-Window Repairs-Phases 1 and 2-Phase 2
This project includes, but is not limited to, the restoration of existing wood windows and door frames at Beardshear Hall. All loose paint will be scraped off and any holes, splits, and damage to the existing wood frames will be patched and repaired to match existing shapes and sizes. The restoration includes professional repainting with premium exterior wood primer and paint. The existing original paint on the frames contains lead so all contractors working on this project will be required to adhere to the EPA Renovation, Repair, and Painting rule, which requires Lead Safe Work Practices.
05/22/2025 07:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP1118655-Memorial Union-Bookstore-Lighting Replacement
This project includes, but is not limited to, replacing the lighting throughout the University Bookstore with new fixtures, LED lighting and controllers, converting to 120 Volts, and adding battery packs.
12/07/2023 08:01 PM UTC
CP002439-East of University Blvd-Site Improvements-Recreation Svcs & Field Lighting-Foot Wash
Project scope includes adding a foot wash station to the sand volleyball courts.
12/05/2023 08:01 PM UTC
CP1159926-Maple Willow Larch Commons-Seasons Marketplace-Remodel
The project will remodel portions of the back of house in the Seasons Marketplace dining facility at the Maple Willow Larch Commons. Back of house restrooms and food preparation areas will be updated due to deteriorating finishes, code and standards compliance, equipment upgrades, and improved workflows.
11/16/2023 08:01 PM UTC
CP1161151-Utilities-Veenker Memorial Golf Course-Well Installation
The project will install a water well and associated small pump house on Veenker Memorial Golf Course to provide water for course irrigation. The new well will replace a recently failed water line running between the main campus and the golf course irrigation pond.
11/09/2023 08:01 PM UTC
CP1164931-Armstrong Memorial Research and Demonstration Farm-Machine Storage Building
The project consists of, but is not limited to, design and construction of a machine storage building. The building will be approximately 7,200 gsf, will be post frame construction, and will have metal roofing and siding.
10/24/2023 07:01 PM UTC
CP1119386-Student Innovation Center-Administration Suite-Remodel
The project consists of, but is not limited to, the remodeling of rooms 2117, 2119, and 2120 to accommodate the expansion of the existing administration office suite currently located in rooms 2118 and 2118A of the Student Innovation Center. Work includes demolition of interior space including walls and finishes. New work includes new walls, finishes, and modified mechanical and electrical work to support the remodel.
10/19/2023 07:01 PM UTC
CP1161151-Utilities-Veenker Memorial Golf Course-Well Installation
The project consists of, but is not limited to, the installation of an irrigation well, pump, electrical service and associated piping.
08/10/2023 07:01 PM UTC
CP1095296-Beardshear Hall-Room 1350-Remodel
This project includes, but is not limited to, remodeling the existing office suite and adjacent treasurer's office. The existing conference room will be expanded, individual office spaces will be created, and the interior finishes updated.
08/08/2023 07:01 PM UTC
CP1001182-Town Engineering Building-Facility and Infrastructure-Improvements-480V Electrical and Chilled Water
This project consists of, but is not limited to, tap existing chilled water mains in basement and install chilled water piping to new heat exchanger in the basement mechanical room. Install pump, air/dirt separator, expansion tank and process water loop piping for two electrohydraulic pumps. Tap existing 480V service, install new disconnect, two new panels, conduit, wiring and hook-ups for concrete robot, two stud welders, two hydraulic pumps and one process chilled water pump and VFD.
08/01/2023 07:01 PM UTC
CP1166074-Reiman Gardens-Dunlap Courtyard-Pavement Improvement
The project consists of, but is not limited to, removal of existing gravel walks; installation of new PCC paving and concrete pavers, installation of perforated tiles, irrigation, and finish grading/topsoil.
07/27/2023 07:01 PM UTC