Number Deadline
CP1279411-Durham Center-Heating Water Piping-Replacement
This project will replace the heating system piping throughout the Durham Center. The scope of work includes, but is not limited to, the removal of existing piping, risers, valves and supports. Included is the replacement of all materials, including new riser valves to enhance system control and efficiency. Any abatement of hazardous materials will be handled by the university.
06/26/2025 07:01 PM UTC
CP1280467-Agronomy Hall-Room G0525-Renovation
The scope of work includes, but is not limited to, classroom renovation involving demolition of existing built-in island, shelving and pegboards, and installation of new light fixtures with dimming capabilities, new rubber flooring, painting, and new classroom furniture.
07/01/2025 07:01 PM UTC
CP1275701-Durham Center-Room 0139-Remodel
This project will remodel a previously occupied computer lab space to include both open office space and private office spaces. This project includes, but is not limited to, new walls, flooring, paint, and furniture; additional mechanical equipment and controls for private offices; existing mechanical modifications; sprinkler modifications; and new lighting and lighting controls.
07/08/2025 07:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP1146627-Agronomy Hall-Room 2050-Remodel
This project includes, but is not limited to, remodeling of flooring, lighting, walls, ceilings, and furniture in the existing classroom. Also included are new diffusers, ductwork, and technology upgrades.
12/14/2023 08:01 PM UTC
CP1004288-CYTown-Parking and Infrastructure-Phase 2
This project includes, but is not limited to, construction of replacement parking with new lighting and installation of underground infrastructure, which would include new water, power, gas, telecommunications, storm sewer, and sanitary lines to support future development. The project would also relocate the CyRide Transit Hub and raise a portion of the site above 100-year flood plain of Ioway Creek.
12/14/2023 08:01 PM UTC
CP002724-Friley Residence Hall-Bathroom Improvements-Stack E & Stack F
This project title is now - FRILEY RESIDENCE HALL-BATHROOM IMPROVEMENTS-STACK E, STACK F & STACK G The project consists of, but is not limited to, remodel of bathrooms in stacks E, F and G. The bathrooms will be converted from mass, shared bathrooms to private, accessible units. The work includes mechanical, electrical, and plumbing system modifications, interior finish updates, and layout changes.
12/12/2023 08:01 PM UTC
CP1167539-Parking Lots 2023-Pavement Preservation
This project will perform approximately 1,550 SY of concrete patching intended to extend the life of the pavement and improve the overall pavement condition index (PCI) of Parking Lots on the ISU Campus. Improvements are included in the Five-Year Parking Lot Improvement Plan.
12/12/2023 08:01 PM UTC
CP1175253-Carrie Chapman Catt Hall-Rooms 0102 and 0129-Remodel
This project includes, but is not limited to, the remodeling and repurposing of existing administrative and storage spaces to create an updated and welcoming student lounge and program space that includes one admin workstation. This remodel includes new flooring, ceiling, lighting, windows, doors, paint, a new VAV box, and associated ductwork and controls.
12/07/2023 08:01 PM UTC
CP1118655-Memorial Union-Bookstore-Lighting Replacement
This project includes, but is not limited to, replacing the lighting throughout the University Bookstore with new fixtures, LED lighting and controllers, converting to 120 Volts, and adding battery packs.
12/07/2023 08:01 PM UTC
CP002439-East of University Blvd-Site Improvements-Recreation Svcs & Field Lighting-Foot Wash
Project scope includes adding a foot wash station to the sand volleyball courts.
12/05/2023 08:01 PM UTC
CP1159926-Maple Willow Larch Commons-Seasons Marketplace-Remodel
The project will remodel portions of the back of house in the Seasons Marketplace dining facility at the Maple Willow Larch Commons. Back of house restrooms and food preparation areas will be updated due to deteriorating finishes, code and standards compliance, equipment upgrades, and improved workflows.
11/16/2023 08:01 PM UTC
CP1161151-Utilities-Veenker Memorial Golf Course-Well Installation
The project will install a water well and associated small pump house on Veenker Memorial Golf Course to provide water for course irrigation. The new well will replace a recently failed water line running between the main campus and the golf course irrigation pond.
11/09/2023 08:01 PM UTC
CP1164931-Armstrong Memorial Research and Demonstration Farm-Machine Storage Building
The project consists of, but is not limited to, design and construction of a machine storage building. The building will be approximately 7,200 gsf, will be post frame construction, and will have metal roofing and siding.
10/24/2023 07:01 PM UTC