Upcoming Solicitations

Number Deadline
CP1253073-Communications Building-Suite 1200-Remodel
This project will remodel approximately 4,100 GSF in Communications Building Suite 1200, including rooms 1211, 1226, and 1227. Work includes, but is not limited to, demolition, construction, mechanical and electrical improvements, paint, carpet, lighting, and furniture.
05/13/2025 07:01 PM UTC
CP1259884-Stephens Auditorium-Utility Lines-Repair
This project will make corrections to certain sanitary drains currently tied-in to the storm sewer system. The scope of work includes, but is not limited to, permanently sealing or rerouting drains from an electrical room, two mechanical rooms, and one air handling unit.
05/22/2025 07:01 PM UTC
CP1119832-Beardshear Hall-Window Repairs-Phases 1 and 2-Phase 2
This project includes, but is not limited to, the restoration of existing wood windows and door frames at Beardshear Hall. All loose paint will be scraped off and any holes, splits, and damage to the existing wood frames will be patched and repaired to match existing shapes and sizes. The restoration includes professional repainting with premium exterior wood primer and paint. The existing original paint on the frames contains lead so all contractors working on this project will be required to adhere to the EPA Renovation, Repair, and Painting rule, which requires Lead Safe Work Practices.
05/22/2025 07:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP1234052-Frederiksen Court Building 72-Fire Alarm Upgrade
This project includes, but is not limited to, fire alarm system upgrade including replacement of the fire alarm panel and all wiring according to Department of Residence standards, and replacement of the apartment devices with addressable devices.
04/02/2024 07:01 PM UTC
CP1201476-Hixson-Lied Student Success Center-Rooms 2242 and 2280-Remodel
This project includes, but is not limited to, the remodeling of rooms 2242 and 2280 of the Hixson-Lied Student Success Center to accommodate the relocation of the Center for Excellence in Learning and Teaching (CELT) testing center. Work includes demolition of interior space including existing casework, chair rails, doors, flooring, and wall base. New work includes patching and repairing walls, new paint, doors, lockers, security cameras, testing station furniture, and mechanical and electrical work to support the remodel. New office furniture for the staff is also included.
03/28/2024 07:01 PM UTC
CP943347-Scheman Building-Renovation
The project will renovate portions of the ground floor main entrances, entry lobby, and restrooms and the first floor event and circulation spaces, and restrooms. The existing Benton Auditorium will be remodeled into a flexible event space with stage and seating areas. The project will also provide new food and beverage amenities and improvements to wayfinding and signage to improve the guest experience. The project will also upgrade existing mechanical and electrical systems to meet exiting codes and the requirements of the renovated spaces. No existing occupants will be relocated during construction or after the project is completed.
03/21/2024 07:01 PM UTC
CP1175457-Sweeney Hall-Room 1058-Remodel
This project will remodel an existing research lab space to accommodate the needs and usage of Chemical and Biological Engineering and to make space for the new Biomedical Engineering major program. This project includes, but is not limited to, the demolition of existing wall-mounted items, patching and repairing of walls, new flooring, a new water line, compressed air, and reconfiguring power to accommodate new lab usage.
03/21/2024 07:01 PM UTC
CP1201187-Agronomy Hall-Room B0515-Dehumidification Unit-Replacement
This project includes, but is not limited to, the replacement of the existing single dehumidification unit with two new dehumidification units to provide a 100% redundant system. Dehumidifiers will be racked on the floor in a similar arrangement to the condensing units on the third floor.
03/14/2024 07:01 PM UTC
CP1119832-Beardshear Hall-Window Repairs-Phase 1
This project includes, but is not limited to, the restoration of existing wood windows and door frames at Beardshear Hall. All loose paint will be scraped off and any holes, splits, and damage to the existing wood frames will be patched and repaired to match existing shapes and sizes. The restoration includes professional repainting with premium exterior wood primer and paint. The existing original paint on the frames contains lead so all contractors working on this project will be required to adhere to the EPA Renovation, Repair, and Painting rule, which requires Lead Safe Work Practices.
03/07/2024 08:01 PM UTC
CP1119681-Veterinary Diagnostic Laboratory-Phase 2
This project proposes an addition to the currently authorized and under-construction Veterinary Diagnostic Laboratory (VDL) Building, providing approximately 78,500 gsf of additional space to co-locate the remaining testing sections of the laboratory, diagnostic research activities, and administrative staff with the front-end sample processing and receiving functions of the lab.
03/05/2024 08:01 PM UTC
CP965420-Jack Trice Stadium-Press Box Elevator-Improvements
This project includes, but is not limited to, modernizing the elevator controller, hoisting equipment, and door operations.
02/22/2024 08:01 PM UTC
CP1197515-Farm House-Roof Replacement
This project includes, but is not limited to, the replacement of the existing cedar shake shingles and ridge vent, painting the wood soffits and fascia, new gutters, flashing at the chimney, wood trim replacement at the dormer, and restoring wood trim and accent railings and both the North, West, and South porches, all in compliance with historical preservation practices and methods. Work will include lead abatement and architectural work.
02/08/2024 08:01 PM UTC
CP1000679-Friley Residence Hall-Courtyard Roof-Improvements
The Friley Residence Hall courtyard is both an outdoor seating area and a structural roof over food service and dining areas below the courtyard. The courtyard consists of a concrete deck, which is now deteriorated. This project includes, but is not limited to, repairs to the deck and installing a new protective waterproof membrane. A new pedestal-mounted paver system will be installed over the membrane to provide a courtyard walking surface.
02/06/2024 08:01 PM UTC