CP1289828-Communications Building-Rooms 1115 and 1154-Remodel
This project will remodel approximately 2,550 GSF in the Communications Building Suite 1115 and Room 1154. Work includes, but is not limited to, demolition, construction, mechanical and electrical improvements, paint, carpet, and lighting.
| 10/16/2025 07:01 PM UTC |
CP1015970-Human Nutritional Sciences Building-Textiles Science Teaching Laboratory-Remodel
This project proposes to remodel rooms 2003, 2110, 2116, 2118, 2124, and 2126 of the Human Nutritional Sciences Building (HNSB) to accommodate a Textiles Science Teaching Laboratory. A future project will include a first-floor remodel of HNSB to accommodate a Tearoom/Student-Run Restaurant (SRR). This project proposed to remodel approximately 2,417 gross square feet of the second floor of HNSB to a Textiles Science Teaching Laboratory (TSL). The TSL, temporarily located in Bessey Hall due to the rebuild of LeBaron Hall, will relocate to the new space. Work consists of demolition of interior space including existing walls, casework, equipment, and finishes. New work will include new walls, casework, fume hoods, finishes, and updated mechanical and electrical work to support the remodel.
| 10/30/2025 07:01 PM UTC |
CP1239249-Patterson Hall-Laboratory Speaker Strobe-Installation
This Project consists of replacement of fire alarm notification appliances throughout Area G first floor and second floor of the Patterson Hall Building.
| 11/04/2025 08:01 PM UTC |
CP1290583-Patterson Hall-Rooms 1107, 1220, 1222F, 1222G and 1222H-Remodel
This project will remodel rooms 1107, 1220, 1222F, 1222G, and 1222H. The scope of work includes, but is not limited to: removing a wall; patch and painting all walls; new flooring; new lighting; installing new sinks; demolishing existing casework and installing new casework and benching; relocating electrical receptacles; and modifying HVAC ductwork.
| 11/06/2025 08:01 PM UTC |
Number | Deadline |
---|---|
CP002385 - Maple-Willow-Larch Recreation Fields Improvements-Site Electrical and Lighting
The project consists of, but is not limited to, installation of electrical service, field lighting and lighting controls associated with recreation playing fields.
| 12/05/2017 08:01 PM UTC |
CP002435
Knoll-Exterior Repairs-Roof Replacement - The project consists of, but is not limited to, replacement of the roof to maintain the integrity of the Knoll.
| 11/30/2017 08:01 PM UTC |
CP002445
Zaffarano Physics Addition-Fan Coil Replacement-Phase 2
The project consists of, but is not limited to, the removal and replacement of forty-four (44) fan coil units and accessories.
| 11/14/2017 08:01 PM UTC |
CP002225
Student Innovation Ctr-Issuance 4-Rebid Pkgs - BP4.01 GENERAL TRADES- The project consists of, but is not limited to, a 138,973 sf new building, that includes a basement and four (4) floors above grade. Work includes membrane roof and green roofs, building interior rough in and finishes, and a raised access flooring system.
| 11/09/2017 08:01 PM UTC |
CP002225
Student Innovation Ctr-Issuance 4-Rebid Pkgs - BP4.02 METAL FRAMING, GYP, and ACP - The project consists of, but is not limited to, a 138,973 sf new building, that includes a basement and four (4) floors above grade. Work includes membrane roof and green roofs, building interior rough in and finishes, and a raised access flooring system.
| 11/09/2017 08:01 PM UTC |
CP002225
Student Innovation Ctr-Issuance 4-Rebid Pkgs - BP4.03 ACCESS FLOORING - The project consists of, but is not limited to, a 138,973 sf new building, that includes a basement and four (4) floors above grade. Work includes membrane roof and green roofs, building interior rough in and finishes, and a raised access flooring system.
| 11/09/2017 08:01 PM UTC |
CP002225
Student Innovation Ctr-Issuance 4-Rebid Pkgs - BP4.04 SHEETMETAL and ROOFING - The project consists of, but is not limited to, a 138,973 sf new building, that includes a basement and four (4) floors above grade. Work includes membrane roof and green roofs, building interior rough in and finishes, and a raised access flooring system.
| 11/09/2017 08:01 PM UTC |
CP002427
College Creek-Bank Erosion Repair -
The project consists of, but is not limited to, bank grading, excavation, and installation of rip rap to stabilize eroding creek bank. Work includes storm sewer piping, intake installation, sidewalk removal, sidewalk replacement and all associated erosion control measures required to protect slopes.
| 10/17/2017 07:01 PM UTC |
CP002425
Veterinary Medicine-Domestic Water Line Replacement-Phase 3 - The project consists of, but is not limited to, extensions of the domestic water service and additional piping to facilitate future work to the existing domestic water service. Provide new valves, piping, piping accessories, insulation and other items required to complete the system.
| 10/12/2017 07:01 PM UTC |
CP002435
Knoll-Exterior Repairs-Masonry - The project consists of, but is not limited to, repair of exterior masonry walls to maintain the integrity of the Knoll.
| 10/05/2017 07:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.