CP1303338-Howe Hall-Room 1200 Remodel
****THIS BID HAS BEEN CANCELLED****
This project will remodel room 1200 in Howe Hall. Work includes, but is not limited to: demolition of existing cubicles; construction of two offices and a front reception space; associated mechanical and electrical improvements; painting; carpeting; and lighting.
| 04/02/2026 07:01 PM UTC |
|
CP1300765-Town Engineering Building-Rooms 142, 148 and 156 Remodel
This project includes interior renovations to two existing lab spaces (Rooms 142 and 148) and one storage room (Room 156) at the west end of Town Engineering along the existing loading dock, totaling 3,000 square feet. The existing labs will be renovated to better support existing space uses and the existing storage room will be renovated into a cleaning and storage space. Demolition work includes but is not limited to; demolition of two existing concrete masonry walls, concrete slab, casework, and exterior access doors. New work includes but is not limited to: exterior wall patching and finishes. Mechanical scope includes but is not limited to: demolition of existing gas lines, new dust collection system, and replacement of existing grilles and diffusers. Electrical scope includes but is not limited to: renovations to power and lighting systems.
| 04/07/2026 07:01 PM UTC |
|
CP1295340-Institutional Roads 2026-Pavement Preservation
Planned work includes, but is not limited to, asphalt and concrete improvements on various Institutional Roads segments across campus.
| 04/14/2026 07:01 PM UTC |
|
CP1248808-Lake LaVerne-Improvements
The project consists of, but is not limited to, dewatering, excavation and disposal of lakebed sediment from Lake LaVerne as well as pavement removal, regrading of the lakebed, reshaping the lake edge, bank stabilization, placement of limestone outcropping and fieldstone along the lake edge, cut limestone walls, extending lake overflow channel, PCC sidewalks, railing replacement, site lighting, and seeding.
| 04/16/2026 07:01 PM UTC |
|
CP1300581-Memorial Union-Roof Sections B, C, G, J, K, W, Z and 1 Replacement
MEMORIAL UNION-ROOF REPLACEMENT-SECTIONS G, Z, 1
This project will replace Memorial Union roof sections G, Z, and 1. The scope of work includes, but is not limited to, demolishing existing roof systems and replacing them with new roofing systems.
| 04/21/2026 07:01 PM UTC |
|
CP1289859-Beardshear Hall-Rooms 0530, 0810, 0880, 3410 Improvement
Scope for Accounts Receivable, ID Card Office, Treasury, and a shared space in 3410 Beardshear for Accounts Receivable and Financial Aid. Accounts Receivable 0810 Beardshear: Reconfigure space to accommodate the ID Card Office 0810A: Reconfigure current Conference Room into two workstations and a small kitchenette 0810C: Reconfigure current office into two work stations to support ID Card 0880: Reconfigure AR Front Office to move kitchenette out and add small student workstations 0530 Beardshear: Remodel current card office for Treasury space 3410 Beardshear: Update paint and carpet, in addition to office furniture for 3410A, 3410C to allow for shared workspace offices
| 04/23/2026 07:01 PM UTC |
|
CP1275129-Linden Residence Hall-North Retaining Wall-Repairs
This project will repair and replace segments of the retaining wall and replace stairs on the north side of Linden Residence Hall. The scope of work includes, but is not limited to, retaining wall footing and masonry replacement, site lighting, concrete stairs, sidewalk replacement, landscaping, and site drainage improvements. An accessible pedestrian and equipment access route will be provided to the plaza level.
| 04/28/2026 07:01 PM UTC |
| Number | Deadline |
|---|---|
|
CP002394 - Beardshear Hall-Air Handling Unit Replacement
The project consists of, but is not limited to, the removal and demolition of the existing air-handling unit in the mechanical space and the installation of a new air-handling unit in the same location
| 01/30/2018 08:01 PM UTC |
|
CP002443 - Welch Avenue-CyRide Turnaround
The project consists of, but is not limited to, sidewalk removal, street & sidewalk lights removal/replacement, electrical circuit installation, stripping/spreading of topsoil, excavation, subgrade preparation, PCC sidewalk, PCC curb and gutter, PCC street paving, traffic control and other associated work for a bus turnaround project near the intersection of Welch Avenue and Storm Street in Ames, Iowa on the Iowa State University campus.
| 01/30/2018 08:01 PM UTC |
|
CP002436 - Friley Residence Hall Window Replacement
The project consists of, but is not limited to the installation of new aluminum windows throughout Friley Hall to replace existing windows removed under separate abatement contract, (exceptions noted in documents). New accessory items to the window installation are included as well as patch, repair and painting of existing wall construction to facilitate installation of new window assemblies. Construction will be completed during multiple phases during summers only – see Construction Progress Schedule and substantial completion dates.
| 01/25/2018 08:01 PM UTC |
|
CP002409 - Barton-Lyon-Freeman-Roof Replacements
The project consists of roof replacement work at Barton, Freeman and Lyon Residence Halls. Work consists of, but is not limited to, removal of slate roof system, slate dormer sidewall tiles, dispose. Remove metal gutters and downspouts, dispose. Install new metal gutter and downspouts. Install new asphalt shingle roof system over ice and water shield membrane and roofing accessories. Repair and/or replace damaged wood items as indicated in documents.
| 01/23/2018 08:01 PM UTC |
|
CP002249 - MacKay Hall-Center Wing Window Replacement
The project consists of, but is not limited to, the replacement of 23 window assemblies and 3 door assemblies on the south side, center wing of MacKay Hall. Windows are on the basement, first, and second floors and shall be replaced with metal clad wood windows.
| 01/18/2018 08:01 PM UTC |
|
CP002324 - Utilities-Chilled Water West Campus Distribution Improvements
The project consists of, but is not limited to, installing new underground utilities consisting of 24 inch chilled water supply and return piping, 12 inch to 42 inch storm sewer system with associated roadway intakes, 10 inch domestic water main, 10 inch sanitary sewer, a steam tunnel extension and underground electrical system for site lighting all under Bissell Road and the adjacent sidewalks from Osborn Drive to Union Drive. Additionally the project includes complete replacement Bissell Road, adjacent sidewalks and all new site lighting for areas affected by the underground utilities.
| 01/18/2018 08:01 PM UTC |
|
CP002415 - Veterinary Medicine-Stereotactic Radiation Therapy Addition
The project consists of, but is not limited to, demolition of existing partitions, mechanical, electrical and plumbing modifications, ceiling, lighting, flooring, new partitions, site utility modifications, and installation of a concrete footing system.
| 01/11/2018 08:01 PM UTC |
|
CP002387 - Utilities-Lied Recreation Athletic Facility-Steam Supply Replacement
The project consists of, but is not limited to, demolition of existing steam service associated equipment and piping. Installation of new interior gas distribution, gas fired boilers, heating piping, reheat water circulation system, pumps, and misc. electrical and general construction.
| 01/09/2018 08:01 PM UTC |
|
CP002355 - Wallace and Wilson Residence Halls-Window Replacement-Phase 2
The project consists of, but is not limited to, provide operable and fixed aluminum-framed windows with trim package as indicated in drawings in dens and select student rooms in Wallace and Wilson Residence Halls. The work includes ten residential floors, the mezzanine and the ground floors in each of the two buildings.
| 01/04/2018 08:01 PM UTC |
|
CP002437-Linden Residence Hall-Window Replacement
The project consists of, but is not limited to, providing new aluminum windows throughout building to replace existing windows removed under separate abatement contract, exceptions noted. Provide complete removal and replacement of exterior entrance assemblies. New aluminum entrance assemblies to include new hardware.
| 12/19/2017 08:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.