Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
CP1303338-Howe Hall-Room 1200 Remodel
****THIS BID HAS BEEN CANCELLED****
This project will remodel room 1200 in Howe Hall. Work includes, but is not limited to: demolition of existing cubicles; construction of two offices and a front reception space; associated mechanical and electrical improvements; painting; carpeting; and lighting.
| 04/02/2026 07:01 PM UTC |
|
CP1300765-Town Engineering Building-Rooms 142, 148 and 156 Remodel
This project includes interior renovations to two existing lab spaces (Rooms 142 and 148) and one storage room (Room 156) at the west end of Town Engineering along the existing loading dock, totaling 3,000 square feet. The existing labs will be renovated to better support existing space uses and the existing storage room will be renovated into a cleaning and storage space. Demolition work includes but is not limited to; demolition of two existing concrete masonry walls, concrete slab, casework, and exterior access doors. New work includes but is not limited to: exterior wall patching and finishes. Mechanical scope includes but is not limited to: demolition of existing gas lines, new dust collection system, and replacement of existing grilles and diffusers. Electrical scope includes but is not limited to: renovations to power and lighting systems.
| 04/07/2026 07:01 PM UTC |
|
CP1295340-Institutional Roads 2026-Pavement Preservation
Planned work includes, but is not limited to, asphalt and concrete improvements on various Institutional Roads segments across campus.
| 04/14/2026 07:01 PM UTC |
|
CP1248808-Lake LaVerne-Improvements
The project consists of, but is not limited to, dewatering, excavation and disposal of lakebed sediment from Lake LaVerne as well as pavement removal, regrading of the lakebed, reshaping the lake edge, bank stabilization, placement of limestone outcropping and fieldstone along the lake edge, cut limestone walls, extending lake overflow channel, PCC sidewalks, railing replacement, site lighting, and seeding.
| 04/16/2026 07:01 PM UTC |
|
CP1300581-Memorial Union-Roof Sections B, C, G, J, K, W, Z and 1 Replacement
MEMORIAL UNION-ROOF REPLACEMENT-SECTIONS G, Z, 1
This project will replace Memorial Union roof sections G, Z, and 1. The scope of work includes, but is not limited to, demolishing existing roof systems and replacing them with new roofing systems.
| 04/21/2026 07:01 PM UTC |
|
CP1289859-Beardshear Hall-Rooms 0530, 0810, 0880, 3410 Improvement
Scope for Accounts Receivable, ID Card Office, Treasury, and a shared space in 3410 Beardshear for Accounts Receivable and Financial Aid. Accounts Receivable 0810 Beardshear: Reconfigure space to accommodate the ID Card Office 0810A: Reconfigure current Conference Room into two workstations and a small kitchenette 0810C: Reconfigure current office into two work stations to support ID Card 0880: Reconfigure AR Front Office to move kitchenette out and add small student workstations 0530 Beardshear: Remodel current card office for Treasury space 3410 Beardshear: Update paint and carpet, in addition to office furniture for 3410A, 3410C to allow for shared workspace offices
| 04/23/2026 07:01 PM UTC |
|
CP1275129-Linden Residence Hall-North Retaining Wall-Repairs
This project will repair and replace segments of the retaining wall and replace stairs on the north side of Linden Residence Hall. The scope of work includes, but is not limited to, retaining wall footing and masonry replacement, site lighting, concrete stairs, sidewalk replacement, landscaping, and site drainage improvements. An accessible pedestrian and equipment access route will be provided to the plaza level.
| 04/28/2026 07:01 PM UTC |
| Number | Deadline |
|---|---|
|
CP002343 - Institutional Roads 2018-Union Drive & Welch Road Reconstruction
The project consists of, but is not limited to, full roadway reconstruction of Union Drive and Welch Road, between Lincoln Way and Bissell Road on the Iowa State University campus. Work to be completed includes full-depth pavement reconstruction, curbs, pedestrian sidewalks and ramps, minor parking lot improvements, storm sewer piping and structures, pavement markings and street lighting.
| 12/19/2017 08:01 PM UTC |
|
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 2-BID PACKAGE 2.01-GENERAL CONSTRUCTION (PHASE 2B)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Roberts and Lyon Residence Halls.
B. Issuance 2: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. “Phase 2B” will generally include work for the respective scope in Roberts and Lyon Halls. The “Phase 2B” work associated with Issuance 2 would be completed simultaneously with the previous Issuance 1 “Phase 2A” and Issuance 1 “Phase 2A & 2B” work.
| 12/14/2017 08:01 PM UTC |
|
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 2-BID PACKAGE 2.02-FRAMING, GYPSUM BOARD & ACT CEILINGS & PAINTING (PHASE 2B)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Roberts and Lyon Residence Halls.
B. Issuance 2: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. “Phase 2B” will generally include work for the respective scope in Roberts and Lyon Halls. The “Phase 2B” work associated with Issuance 2 would be completed simultaneously with the previous Issuance 1 “Phase 2A” and Issuance 1 “Phase 2A & 2B” work.
| 12/14/2017 08:01 PM UTC |
|
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 2-BID PACKAGE 2.03-MECHANICAL (PHASE 2B)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Roberts and Lyon Residence Halls.
B. Issuance 2: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. “Phase 2B” will generally include work for the respective scope in Roberts and Lyon Halls. The “Phase 2B” work associated with Issuance 2 would be completed simultaneously with the previous Issuance 1 “Phase 2A” and Issuance 1 “Phase 2A & 2B” work.
| 12/14/2017 08:01 PM UTC |
|
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 2-BID PACKAGE 2.04-ELECTRICAL (PHASE 2B)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Roberts and Lyon Residence Halls.
B. Issuance 2: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. “Phase 2B” will generally include work for the respective scope in Roberts and Lyon Halls. The “Phase 2B” work associated with Issuance 2 would be completed simultaneously with the previous Issuance 1 “Phase 2A” and Issuance 1 “Phase 2A & 2B” work.
| 12/14/2017 08:01 PM UTC |
|
CP002429 - East Hall-Electrical Panels & Disconnect Replacement
The project consists of, but is not limited to, the replacement of the East Hall Electrical Panels and Disconnects, including the replacement of a 4,160-volt line within Heady Hall and East Hall.
| 12/12/2017 08:01 PM UTC |
|
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 1-BID PACKAGE 1.01-DEMOLITION (PHASE 2A & 2B)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Birch, Welch, Roberts, and Lyon Residence Halls. The project will be bid through two bid issuances.
B. Issuance 1: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. Both Phase 2A and 2B would be completed simultaneously with the phase identifying the buildings/locations of work for that specific bid package, of which the general description is as follows:
1. “Phase 2A” will generally include work for the respective scope in Birch and Welch Halls only.
2. “Phase 2A & 2B” would include work for the respective scope in all four buildings (Birch, Welch, Roberts and Lyon Halls).
| 12/07/2017 08:01 PM UTC |
|
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 1 - BID PACKAGE 1.02-GENERAL CONSTRUCTION (PHASE 2A)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Birch, Welch, Roberts, and Lyon Residence Halls. The project will be bid through two bid issuances.
B. Issuance 1: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. Both Phase 2A and 2B would be completed simultaneously with the phase identifying the buildings/locations of work for that specific bid package, of which the general description is as follows:
1. “Phase 2A” will generally include work for the respective scope in Birch and Welch Halls only.
2. “Phase 2A & 2B” would include work for the respective scope in all four buildings (Birch, Welch, Roberts and Lyon Halls).
| 12/07/2017 08:01 PM UTC |
|
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 1 - BID PACKAGE 1.03-FRAMING, GYPSUM BOARD & ACT CEILINGS & PAINTING (PHASE 2A)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Birch, Welch, Roberts, and Lyon Residence Halls. The project will be bid through two bid issuances.
B. Issuance 1: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. Both Phase 2A and 2B would be completed simultaneously with the phase identifying the buildings/locations of work for that specific bid package, of which the general description is as follows:
1. “Phase 2A” will generally include work for the respective scope in Birch and Welch Halls only.
2. “Phase 2A & 2B” would include work for the respective scope in all four buildings (Birch, Welch, Roberts and Lyon Halls).
| 12/07/2017 08:01 PM UTC |
|
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 1 - BID PACKAGE 1.04-FIRE SPRINKLER (PHASE 2A & 2B)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Birch, Welch, Roberts, and Lyon Residence Halls. The project will be bid through two bid issuances.
B. Issuance 1: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. Both Phase 2A and 2B would be completed simultaneously with the phase identifying the buildings/locations of work for that specific bid package, of which the general description is as follows:
1. “Phase 2A” will generally include work for the respective scope in Birch and Welch Halls only.
2. “Phase 2A & 2B” would include work for the respective scope in all four buildings (Birch, Welch, Roberts and Lyon Halls).
| 12/07/2017 08:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.