General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1303338-Howe Hall-Room 1200 Remodel
****THIS BID HAS BEEN CANCELLED**** This project will remodel room 1200 in Howe Hall. Work includes, but is not limited to: demolition of existing cubicles; construction of two offices and a front reception space; associated mechanical and electrical improvements; painting; carpeting; and lighting.
04/02/2026 07:01 PM UTC
CP1300765-Town Engineering Building-Rooms 142, 148 and 156 Remodel
This project includes interior renovations to two existing lab spaces (Rooms 142 and 148) and one storage room (Room 156) at the west end of Town Engineering along the existing loading dock, totaling 3,000 square feet. The existing labs will be renovated to better support existing space uses and the existing storage room will be renovated into a cleaning and storage space. Demolition work includes but is not limited to; demolition of two existing concrete masonry walls, concrete slab, casework, and exterior access doors. New work includes but is not limited to: exterior wall patching and finishes. Mechanical scope includes but is not limited to: demolition of existing gas lines, new dust collection system, and replacement of existing grilles and diffusers. Electrical scope includes but is not limited to: renovations to power and lighting systems.
04/07/2026 07:01 PM UTC
CP1295340-Institutional Roads 2026-Pavement Preservation
Planned work includes, but is not limited to, asphalt and concrete improvements on various Institutional Roads segments across campus.
04/14/2026 07:01 PM UTC
CP1248808-Lake LaVerne-Improvements
The project consists of, but is not limited to, dewatering, excavation and disposal of lakebed sediment from Lake LaVerne as well as pavement removal, regrading of the lakebed, reshaping the lake edge, bank stabilization, placement of limestone outcropping and fieldstone along the lake edge, cut limestone walls, extending lake overflow channel, PCC sidewalks, railing replacement, site lighting, and seeding.
04/16/2026 07:01 PM UTC
CP1300581-Memorial Union-Roof Sections B, C, G, J, K, W, Z and 1 Replacement
MEMORIAL UNION-ROOF REPLACEMENT-SECTIONS G, Z, 1 This project will replace Memorial Union roof sections G, Z, and 1. The scope of work includes, but is not limited to, demolishing existing roof systems and replacing them with new roofing systems.
04/21/2026 07:01 PM UTC
CP1289859-Beardshear Hall-Rooms 0530, 0810, 0880, 3410 Improvement
Scope for Accounts Receivable, ID Card Office, Treasury, and a shared space in 3410 Beardshear for Accounts Receivable and Financial Aid. Accounts Receivable 0810 Beardshear: Reconfigure space to accommodate the ID Card Office 0810A: Reconfigure current Conference Room into two workstations and a small kitchenette 0810C: Reconfigure current office into two work stations to support ID Card 0880: Reconfigure AR Front Office to move kitchenette out and add small student workstations 0530 Beardshear: Remodel current card office for Treasury space 3410 Beardshear: Update paint and carpet, in addition to office furniture for 3410A, 3410C to allow for shared workspace offices
04/23/2026 07:01 PM UTC
CP1275129-Linden Residence Hall-North Retaining Wall-Repairs
This project will repair and replace segments of the retaining wall and replace stairs on the north side of Linden Residence Hall. The scope of work includes, but is not limited to, retaining wall footing and masonry replacement, site lighting, concrete stairs, sidewalk replacement, landscaping, and site drainage improvements. An accessible pedestrian and equipment access route will be provided to the plaza level.
04/28/2026 07:01 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 1 - BID PACKAGE 1.05-MECHANICAL (PHASE 2A)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Birch, Welch, Roberts, and Lyon Residence Halls. The project will be bid through two bid issuances. B. Issuance 1: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. Both Phase 2A and 2B would be completed simultaneously with the phase identifying the buildings/locations of work for that specific bid package, of which the general description is as follows: 1. “Phase 2A” will generally include work for the respective scope in Birch and Welch Halls only. 2. “Phase 2A & 2B” would include work for the respective scope in all four buildings (Birch, Welch, Roberts and Lyon Halls).
12/07/2017 08:01 PM UTC
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 1 - BID PACKAGE 1.06-ELECTRICAL (PHASE 2A)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Birch, Welch, Roberts, and Lyon Residence Halls. The project will be bid through two bid issuances. B. Issuance 1: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. Both Phase 2A and 2B would be completed simultaneously with the phase identifying the buildings/locations of work for that specific bid package, of which the general description is as follows: 1. “Phase 2A” will generally include work for the respective scope in Birch and Welch Halls only. 2. “Phase 2A & 2B” would include work for the respective scope in all four buildings (Birch, Welch, Roberts and Lyon Halls).
12/07/2017 08:01 PM UTC
CP002357 - Osborn Drive Sidewalk Widening-Phase Three-East Corridor
The project consists of, but is not limited to, curb and sidewalk removal, PCC sidewalk install, colored sidewalk install, major and minor manhole adjustments, installation of electrical conduit and wire, curb and gutter install, light pole installation and electrical vault lid replacement.
12/07/2017 08:01 PM UTC
CP002385 - Maple-Willow-Larch Recreation Fields Improvements-Site Electrical and Lighting
The project consists of, but is not limited to, installation of electrical service, field lighting and lighting controls associated with recreation playing fields.
12/05/2017 08:01 PM UTC
CP002435
Knoll-Exterior Repairs-Roof Replacement - The project consists of, but is not limited to, replacement of the roof to maintain the integrity of the Knoll.
11/30/2017 08:01 PM UTC
CP002445
Zaffarano Physics Addition-Fan Coil Replacement-Phase 2 The project consists of, but is not limited to, the removal and replacement of forty-four (44) fan coil units and accessories.
11/14/2017 08:01 PM UTC
CP002225
Student Innovation Ctr-Issuance 4-Rebid Pkgs - BP4.01 GENERAL TRADES- The project consists of, but is not limited to, a 138,973 sf new building, that includes a basement and four (4) floors above grade. Work includes membrane roof and green roofs, building interior rough in and finishes, and a raised access flooring system.
11/09/2017 08:01 PM UTC
CP002225
Student Innovation Ctr-Issuance 4-Rebid Pkgs - BP4.02 METAL FRAMING, GYP, and ACP - The project consists of, but is not limited to, a 138,973 sf new building, that includes a basement and four (4) floors above grade. Work includes membrane roof and green roofs, building interior rough in and finishes, and a raised access flooring system.
11/09/2017 08:01 PM UTC
CP002225
Student Innovation Ctr-Issuance 4-Rebid Pkgs - BP4.03 ACCESS FLOORING - The project consists of, but is not limited to, a 138,973 sf new building, that includes a basement and four (4) floors above grade. Work includes membrane roof and green roofs, building interior rough in and finishes, and a raised access flooring system.
11/09/2017 08:01 PM UTC
CP002225
Student Innovation Ctr-Issuance 4-Rebid Pkgs - BP4.04 SHEETMETAL and ROOFING - The project consists of, but is not limited to, a 138,973 sf new building, that includes a basement and four (4) floors above grade. Work includes membrane roof and green roofs, building interior rough in and finishes, and a raised access flooring system.
11/09/2017 08:01 PM UTC
381 - 390 of 395 Solicitations