General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1271058-Hamilton Hall-Room 0002-Remodel
This project will remodel the existing studio space. The scope of work includes, but is not limited to, removing a window from the vestibule wall and installing it in the control room wall; cutting an opening in the vestibule wall for a new window; cutting a large view window into the interior vestibule wood door; and painting all walls, door and window frames. This project also includes numerous lighting additions and upgrades, as well as a large amount of AV equipment.
08/21/2025 07:01 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
CP002422 - Hilton Coliseum Parking Expansion
The project consists of, but is not limited to, removal of existing HMA and PCC pavement, new HMA pavement with PCC curb and gutter and reclaimed HMA base, PCC sidewalks, storm sewer structures and piping, bioswale, parking lot and sidewalk lighting as well as upgrades to the lighting distribution system, telecom panel and raceway for TV truck connections on site, wayfinding and parking stall signage, gate installation, pavement markings and finish grading/topsoil.
03/13/2018 07:01 PM UTC
CP002404 - Parking Lot 96-Expansion
The project consists of, but is not limited to, sidewalk removal, street lights removal/replacement, pedestrian lights removal/replacement, electrical circuit installation, stripping/spreading of topsoil, excavation, subgrade preparation, electric vault lid replacement, storm sewer intakes, storm sewer piping, PCC sidewalk, PCC curb and gutter, HMA parking lot paving, traffic control and other associated work for a parking lot expansion project on the west side of the Veterinary Medicine campus at Iowa State University in Ames, Iowa.
03/08/2018 08:01 PM UTC
CP002379-Parks Library-Restroom Renovations
The project consists of, but is not limited to, renovation of existing restroom facilities within the 1960’s portion of Parks Library. Renovation includes two (2) stacks of restrooms, with restrooms located on four floors. New restrooms will be inserted into locations on First and Fourth floors which are not currently restrooms. Project also includes reconfiguration of underground sanitary sewer, connection of piping to new owner furnished water heater, and tie-in of existing water softener to new water heater.
03/06/2018 08:01 PM UTC
CP002363 - Reiman Gardens-Southwest Corner Improvements-Landscaping
The project consists of, but is not limited to, construction of plant gardens, connecting paths, water features, a single restroom building with mechanical space, a 40’ tall steel and wood tower, and associated earth work and utility services.
03/01/2018 08:01 PM UTC
CP002385 - Maple-Willow-Larch Recreation Fields Improvements-Irrigation and Turf
The project consists of, but is not limited to, installation of athletic field irrigation system, removal of existing field organic material, installation and establishment of new natural turf.
02/22/2018 08:01 PM UTC
CP002447 - Hamilton Hall-Window Replacement-Phase 2
The project consists of, but is not limited to, furnish and install new aluminum window system at areas indicated. Windows will be removed and disposed of by Owner’s abatement contractor. Coordinate removal of existing window assemblies and installation of new windows with Owner’s abatement contractor. Remove and reinstall existing window shades/blinds. Patch and paint adjacent walls as needed due to window replacement.
02/15/2018 08:01 PM UTC
CP002394 - Beardshear Hall-Air Handling Unit Replacement
The project consists of, but is not limited to, the removal and demolition of the existing air-handling unit in the mechanical space and the installation of a new air-handling unit in the same location
01/30/2018 08:01 PM UTC
CP002443 - Welch Avenue-CyRide Turnaround
The project consists of, but is not limited to, sidewalk removal, street & sidewalk lights removal/replacement, electrical circuit installation, stripping/spreading of topsoil, excavation, subgrade preparation, PCC sidewalk, PCC curb and gutter, PCC street paving, traffic control and other associated work for a bus turnaround project near the intersection of Welch Avenue and Storm Street in Ames, Iowa on the Iowa State University campus.
01/30/2018 08:01 PM UTC
CP002436 - Friley Residence Hall Window Replacement
The project consists of, but is not limited to the installation of new aluminum windows throughout Friley Hall to replace existing windows removed under separate abatement contract, (exceptions noted in documents). New accessory items to the window installation are included as well as patch, repair and painting of existing wall construction to facilitate installation of new window assemblies. Construction will be completed during multiple phases during summers only – see Construction Progress Schedule and substantial completion dates.
01/25/2018 08:01 PM UTC
CP002409 - Barton-Lyon-Freeman-Roof Replacements
The project consists of roof replacement work at Barton, Freeman and Lyon Residence Halls. Work consists of, but is not limited to, removal of slate roof system, slate dormer sidewall tiles, dispose. Remove metal gutters and downspouts, dispose. Install new metal gutter and downspouts. Install new asphalt shingle roof system over ice and water shield membrane and roofing accessories. Repair and/or replace damaged wood items as indicated in documents.
01/23/2018 08:01 PM UTC
331 - 340 of 371 Solicitations
1 2 30 31 32 34 36 37 38