General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1279411-Durham Center-Heating Water Piping-Replacement
This project will replace the heating system piping throughout the Durham Center. The scope of work includes, but is not limited to, the removal of existing piping, risers, valves and supports. Included is the replacement of all materials, including new riser valves to enhance system control and efficiency. Any abatement of hazardous materials will be handled by the university.
06/26/2025 07:01 PM UTC
CP1280467-Agronomy Hall-Room G0525-Renovation
The scope of work includes, but is not limited to, classroom renovation involving demolition of existing built-in island, shelving and pegboards, and installation of new light fixtures with dimming capabilities, new rubber flooring, painting, and new classroom furniture.
07/01/2025 07:01 PM UTC
CP1275701-Durham Center-Room 0139-Remodel
This project will remodel a previously occupied computer lab space to include both open office space and private office spaces. This project includes, but is not limited to, new walls, flooring, paint, and furniture; additional mechanical equipment and controls for private offices; existing mechanical modifications; sprinkler modifications; and new lighting and lighting controls.
07/08/2025 07:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 1 - BID PACKAGE 1.03-FRAMING, GYPSUM BOARD & ACT CEILINGS & PAINTING (PHASE 2A)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Birch, Welch, Roberts, and Lyon Residence Halls. The project will be bid through two bid issuances. B. Issuance 1: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. Both Phase 2A and 2B would be completed simultaneously with the phase identifying the buildings/locations of work for that specific bid package, of which the general description is as follows: 1. “Phase 2A” will generally include work for the respective scope in Birch and Welch Halls only. 2. “Phase 2A & 2B” would include work for the respective scope in all four buildings (Birch, Welch, Roberts and Lyon Halls).
12/07/2017 08:01 PM UTC
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 1 - BID PACKAGE 1.04-FIRE SPRINKLER (PHASE 2A & 2B)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Birch, Welch, Roberts, and Lyon Residence Halls. The project will be bid through two bid issuances. B. Issuance 1: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. Both Phase 2A and 2B would be completed simultaneously with the phase identifying the buildings/locations of work for that specific bid package, of which the general description is as follows: 1. “Phase 2A” will generally include work for the respective scope in Birch and Welch Halls only. 2. “Phase 2A & 2B” would include work for the respective scope in all four buildings (Birch, Welch, Roberts and Lyon Halls).
12/07/2017 08:01 PM UTC
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 1 - BID PACKAGE 1.05-MECHANICAL (PHASE 2A)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Birch, Welch, Roberts, and Lyon Residence Halls. The project will be bid through two bid issuances. B. Issuance 1: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. Both Phase 2A and 2B would be completed simultaneously with the phase identifying the buildings/locations of work for that specific bid package, of which the general description is as follows: 1. “Phase 2A” will generally include work for the respective scope in Birch and Welch Halls only. 2. “Phase 2A & 2B” would include work for the respective scope in all four buildings (Birch, Welch, Roberts and Lyon Halls).
12/07/2017 08:01 PM UTC
CP002277-Richardson Court Residence Halls-Bathroom Remodeling-Phase 2-Issuance 1 - BID PACKAGE 1.06-ELECTRICAL (PHASE 2A)
A. The project consists of, but is not limited to, the interior demolition, reconfiguration and remodeling of restrooms at Birch, Welch, Roberts, and Lyon Residence Halls. The project will be bid through two bid issuances. B. Issuance 1: Some of the bid packages have been divided amongst pairs of buildings to provide some division of the amount of work. Both Phase 2A and 2B would be completed simultaneously with the phase identifying the buildings/locations of work for that specific bid package, of which the general description is as follows: 1. “Phase 2A” will generally include work for the respective scope in Birch and Welch Halls only. 2. “Phase 2A & 2B” would include work for the respective scope in all four buildings (Birch, Welch, Roberts and Lyon Halls).
12/07/2017 08:01 PM UTC
CP002357 - Osborn Drive Sidewalk Widening-Phase Three-East Corridor
The project consists of, but is not limited to, curb and sidewalk removal, PCC sidewalk install, colored sidewalk install, major and minor manhole adjustments, installation of electrical conduit and wire, curb and gutter install, light pole installation and electrical vault lid replacement.
12/07/2017 08:01 PM UTC
CP002385 - Maple-Willow-Larch Recreation Fields Improvements-Site Electrical and Lighting
The project consists of, but is not limited to, installation of electrical service, field lighting and lighting controls associated with recreation playing fields.
12/05/2017 08:01 PM UTC
CP002435
Knoll-Exterior Repairs-Roof Replacement - The project consists of, but is not limited to, replacement of the roof to maintain the integrity of the Knoll.
11/30/2017 08:01 PM UTC
CP002445
Zaffarano Physics Addition-Fan Coil Replacement-Phase 2 The project consists of, but is not limited to, the removal and replacement of forty-four (44) fan coil units and accessories.
11/14/2017 08:01 PM UTC
CP002225
Student Innovation Ctr-Issuance 4-Rebid Pkgs - BP4.01 GENERAL TRADES- The project consists of, but is not limited to, a 138,973 sf new building, that includes a basement and four (4) floors above grade. Work includes membrane roof and green roofs, building interior rough in and finishes, and a raised access flooring system.
11/09/2017 08:01 PM UTC
CP002225
Student Innovation Ctr-Issuance 4-Rebid Pkgs - BP4.02 METAL FRAMING, GYP, and ACP - The project consists of, but is not limited to, a 138,973 sf new building, that includes a basement and four (4) floors above grade. Work includes membrane roof and green roofs, building interior rough in and finishes, and a raised access flooring system.
11/09/2017 08:01 PM UTC
351 - 360 of 367 Solicitations