General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1271058-Hamilton Hall-Room 0002-Remodel
This project will remodel the existing studio space. The scope of work includes, but is not limited to, removing a window from the vestibule wall and installing it in the control room wall; cutting an opening in the vestibule wall for a new window; cutting a large view window into the interior vestibule wood door; and painting all walls, door and window frames. This project also includes numerous lighting additions and upgrades, as well as a large amount of AV equipment.
08/21/2025 07:01 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
CP002477 - Human Nutritional Sciences Building-AHU 1-Humidification System Replacement
The project consists of, but is not limited to, replacing the existing chilled water coil, replacing existing corroded ductwork, installing new humidification unit, and new electrical wiring for controls.
05/31/2018 07:01 PM UTC
CP002457 - Hub-Retail Dining Services Renovation
The project consists of, but is not limited to, renovation of the existing Hub’s interior. Renovation will include seating/dining area, back-of-house space, grille venue and coffee venue. The coffee venue will be relocated and separated from the grille.
05/10/2018 07:01 PM UTC
CP002387-Utilities-Lied Recreation Athletic Facility-Steam Supply Replacement-Gasket Replacement
The project consists of, but is not limited to, replacement of the existing coupling and gaskets that are a part of the joint and fitting assemblies on all existing grooved piping that is part of the heating water system.
05/08/2018 07:01 PM UTC
CP002055 - Biosciences Facilities-Advanced Teaching & Research Building-Zebra Fish Laboratory
The project consists of, but is not limited to, installation of new drywall partitions, continuation of the roughed in mechanical and electrical services. The installation of the following owner-furnished items: laboratory casework, doors and frames, fan coil units, lighting systems to complete this core support space in the basement of the new Advanced Teaching and Research Building.
04/26/2018 07:01 PM UTC
CP002401 - Armory-Window Replacement-Phase 2
The project consists of, but is not limited to, providing and installing new windows as indicated on construction documents and as required trim and sills.
04/12/2018 07:01 PM UTC
CP002479 - Music-AHU2 Humidification System Replacement
The project consists of, but is not limited to, replacing the existing supply air handling unit including: cooling/dehumidifying coil, heat/reheat coil, blower, and direct-injection humidifier. The project also includes electrical power for new humidifier and new AHU Johnson Controls.
04/10/2018 07:01 PM UTC
CP002458 - Union Drive Community Center-Clyde's Dining Renovation
The project consists of, but is not limited to, renovated seating/dining area, renovated serving stations, renovated back-of-house (BOH) space that includes foodservice kitchen and dry storage, new interior entrances with overhead coiling security grilles from adjacent building spaces, renovated vestibule, of an existing foodservice and dining facility in Union Drive Community Center.
03/29/2018 07:01 PM UTC
CP002418 - Memorial Union-Dining Services Central Space Remodel
The project consists of, but is not limited to, renovation of the central food court space located on the first floor of the Memorial Union. Scope includes a new food service salad bar, counters, POS stations and food service equipment. Finish upgrades to include new flooring tile, wall finishes, and an acoustic ceiling tile cloud. A new security grille will be installed at the main entry. The project includes limited scope within each of the five venues serving the food court. This includes replacement of existing acoustic ceiling tile and grid, minor painting, and patching of fiber reinforced plastic paneling. Scope of work also includes mechanical and electrical construction in adjacent areas to modify services to serve the space. Some services will be routed through excavated tunnels below.
03/27/2018 07:01 PM UTC
CP002446 - Zaffarano Physics Addition-Exterior Repairs
The project consists of, but is not limited to: 1. Cleaning of existing precast and masonry. 2. Removal of all existing sealant and backer rods. 3. Patch precast concrete panels. 4. Masonry tuckpointing. 5. Install new sealant and backer systems. 6. Repair soffits.
03/22/2018 07:01 PM UTC
CP002475 - Utilities-South Campus-No. 1 Feeder Replacement
The project consists of, but is not limited to, installing new 13,800V cable in existing conduits between underground vaults and above ground switchgear, cable splices in existing underground vaults, and cable terminations on above ground switchgear and transformer. Perform hi-pot cable tests on installed cable, splices, and terminations. De-energize and remove existing abandoned cable after new cable is installed.
03/15/2018 07:01 PM UTC
321 - 330 of 371 Solicitations
1 2 29 30 31 33 35 36 37 38