General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Commons Window Replacement Phase 1
Remove and dispose of select exterior windows. Install new windows and repair/restore interior finishes and exterior masonry as required. Interior finishes include stone and wood sills, drywall, plaster and tile jambs. Exterior masonry includes brick and limestone masonry.
05/06/2025 07:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Power Plant Transfer House Floor Replacement
General Contractor’s Scope of Work includes but is not limited to steel floor replacement including support angles, exterior metal panel infill, and replacing a damaged metal stair tread.
09/17/2024 07:00 PM UTC
Maucker Union Generator Replacement
Replace existing 30kW NG generator with new unit located at exterior loading dock. Provide new automatic transfer switch and reconnect to existing generator power distribution system.
08/29/2024 07:00 PM UTC
Sabin Hall Exterior Repairs Phase 1
Construction services to repair selected brick masonry, new joint sealant and repair of the existing roof top skylight. Also included is repair of selected areas of the clay tile roof and tuckpointing the stone masonry surrounds at three (3) entrances. Work includes bidding the project and construction administration.
06/06/2024 07:00 PM UTC
Seerley Hall Gutter and Clay Tile Roof Repairs
This project will include demolition and disposal of existing membrane gutter lining and accessories, repair/replacement of any degraded underlayment and blocking and installation of new membrane gutter liner, terminations and sheet metal drip edge. Additional work includes selective replacement of damaged clay roof tiles.
05/30/2024 07:00 PM UTC
Curris Business Building Exterior Envelope Repairs Phase 1
A study has been completed that identified several exterior envelope items requiring attention. This project provides construction services to repair/replace selected stone masonry, repair of selected brick masonry, install new sealant at windows, replace selected glazing gaskets at windows, and repair concrete walls and deck at the loading dock. Work also includes bidding and construction administration.
05/30/2024 07:00 PM UTC
Gilchrist Hall Roof Replacement
As indicated on the project drawings, remove existing EPDM membrane, remove existing insulation, mechanically attach new insulation into metal/concrete deck, adhere new coverboard and install new adhered Fleecebacked KEE membrane.
05/21/2024 07:00 PM UTC
West Gym Demolition
The complete deconstruction, demolition, and removal of the West Gymnasium facility from the UNI campus. Multiple site utilities will be affected, including a steam utility tunnel, and will be partially modified and removed. Utilities will be restored to support adjacent campus facilities. Site will be cleaned of all building materials, cleared, finish graded, and sodded for possible future building site.
05/07/2024 07:00 PM UTC
Wellness Recreation Center Roof Replacement Phase 2
Remove existing roof system down to roof deck and replace with a new roof system with insultation that meets energy code requirements.
04/30/2024 07:00 PM UTC
Institutional Roads 2024
As part of the 2024 Institutional Roads program, this project includes but is not limited to: 1) Partial reconstruction of Jennings Drive, 2) Reconstruction of the intersection of Ohio St. and Redeker Drive.
04/11/2024 07:00 PM UTC
Innovative Teaching and Technology Center Renovation for Nursing, Phase 2
As part of the new Nursing program, an area on the ground floor is remodeled to provide flexible simulation environments allowing for a diversity of high-fidelity scenarios leading to increase outcomes by students.
03/21/2024 07:00 PM UTC
21 - 30 of 138 Solicitations
1 3 5 6 7 8 9 13 14