General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
Maucker Union Rooms 011 and 027 Renovation
Selective demolition and reconfiguration of two areas in Maucker Union. The first area (011) involves selective demolition of partitions, ceilings, finishes, casework and related mechanical and electrical systems. New work includes installation of painted drywall walls (steel stud), new doors, ACT ceiling, carpet tile, and extension and revision of mechanical, electrical, data and fire protection systems to support the new offices. The Student Services counter will be relocated to the circulation area and will include new drywall partitions, casework, solid surface countertops and electrical and data to support function of the space. Power and data for a furniture-based desk system will be via floor box cut into existing concrete waffle slab floor. The second area (027) involves select demolition of built-in casework, acoustic tile ceilings, carpet tile flooring and mechanical, electrical and data systems. New work includes installation of full height drywall and steel stud partitions to create three new areas (Panther Pantry, Student Government, and Storage). Panther Pantry area will receive LVP flooring, Student Government will receive carpet tile, and storage area will have adhesives from existing tile removed to leave sealed concrete flooring. Panther Pantry and Student Government areas to receive new ACT ceilings. Mechanical, electrical, fire protection and data systems to be revised to accommodate new space functions. Minor plumbing work includes capping abandoned washing machine drain and the addition of a bottle filler to existing water cooler.
09/23/2025 07:00 PM UTC
Rod Library Exterior Envelope Repairs
This project will complete several exterior envelope repairs to the Rod Library. Work to done includes patching and repair of the existing roof membrane, replacement of insulated glass units at the south pavilion, wet sealing at the exterior curtainwall glazing, replacing sealant at exterior curtainwalls, cleaning building exterior, repairing brick and mortar at selected locations and repainting selected exposed structural steel.
06/12/2025 07:00 PM UTC
Rod Library Academic Advising Office Renovation
Renovation of a suite of office and student spaces in the Rod Library. This shall include reception space, office spaces, and student collaboration spaces.
06/05/2025 07:00 PM UTC
Power Plant Boiler #3 Baghouse Repairs Phase 1
This project will replace a section of breeching from the outlet of the Boiler #3 Baghouse to the vertical breeching section above Boiler #3 ID Fan. The section of ductwork includes replacement of a flex joint and access catwalk in addition to the breeching.
05/29/2025 07:00 PM UTC
Wright Hall Gutter Repairs
This project will include demolition and disposal of existing membrane gutter lining and accessories, repair/replacement of any degraded underlayment and blocking and installation of new membrane gutter liner, terminations and sheet metal drip edge. Additional work includes selective replacement of damaged clay roof tiles, hip cap grouting, and cleaning of brick masonry.
05/29/2025 07:00 PM UTC
Commons Window Replacement Phase 1
Remove and dispose of select exterior windows. Install new windows and repair/restore interior finishes and exterior masonry as required. Interior finishes include stone and wood sills, drywall, plaster and tile jambs. Exterior masonry includes brick and limestone masonry.
05/06/2025 07:00 PM UTC
Russell Hall Bengtson Auditorium Lighting Update
This project will replace the theatrical dimming and control systems as well as the existing house lighting fixtures in Russell Hall’s Bengtson Auditorium.
04/29/2025 07:00 PM UTC
Gilchrist Hall Pedestrian Bridge Remediation
Removal and replacement of the existing concrete topping slab for the Gilchrist Hall Pedestrian Bridge. Work also includes miscellaneous repairs of bridge precast tee beams. Removal and reinstallation of existing light poles and hand railings will be required. Installation of new electrical service to bridge lighting is also included.
04/29/2025 07:00 PM UTC
Schindler Education Center Exterior Envelope Repairs Phase 1
This project will repair brick masonry expansion joints, provide brick tuckpointing as necessary, repair steel lintels and repair soffit cracks all at the 6th floor exterior locations.
04/24/2025 07:00 PM UTC
Commons Roof Replacement
Project involves a complete roof replacement including drain bowls, roof insulation, roof membrane, walkway pads, and perimeter flashings. Also included is the removal of selective rooftop mechanical equipment and associated electrical and mechanical scope, removal of existing mechanical curbs, modification of exiting masonry chimneys, infilling of abandoned roof openings, and the removal/replacement of existing copper roof pans and stepped flashing at breezeway roofs
04/08/2025 07:00 PM UTC
21 - 30 of 164 Solicitations
1 3 5 6 7 8 9 16 17