University of Northern Iowa
1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961
1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Number | Deadline |
---|---|
Nielsen Field House Roof Replacement Phase 1
Tear off existing membrane and any wet insulation that is discovered. Replacement with additional insulation to achieve energy code requirements and installation of new membrane.
| 03/22/2022 07:00 PM UTC |
Roth Roof Replacement & Exterior Improvements
Full replacement of the existing standing seam metal roof. The new roof shall be a prefinished standing seam metal roof system over the existing roof deck material. Includes new roof insulation, flashings, gutters, masonry tuckpointing of selected areas and re-caulk of masonry window joints.
| 03/22/2022 07:00 PM UTC |
Maucker Union Room 113 International Engagement Updates
Modifications to Maucker Union Suite 113 including, but not limited to: new walls, ceilings, finishes and modifications to existing casework, electrical, plumbing, and mechanical systems.
| 03/17/2022 07:00 PM UTC |
Power Plant Fuel Oil Piping Replacement
Replace compromised piping system, aging equipment, and improve reliability for the Power Plant No. 2 Fuel Oil system. Project will also upgrade associated auxiliary systems, including instrumentation, electrical service, and the process control system.
| 03/15/2022 07:00 PM UTC |
Curris Business Building Rooms 19 & 21 HVAC Upgrades Phase 1
Installation of computer room air conditioning unit for Room 21, including roof mounted air cooled condensing unit and associated refrigeration piping and power.
| 02/22/2022 08:00 PM UTC |
Industrial Technology Center Modernization (Applied Engineering Building) - Asbestos Abatement
Asbestos abatement of asbestos-containing drywall, sinks, flooring, and transite ceilings
| 02/22/2022 08:00 PM UTC |
Football Practice Field Synthetic Turf Conversion Phase 2
A new entry sign monument, football video and power and data infrastructure.
| 02/10/2022 08:00 PM UTC |
Rod Library Upgrade Two Elevators
The upgrade and modernization of existing traction elevators 'East' and 'West' within the Rod Library.
| 06/24/2021 07:00 PM UTC |
27th Street Corridor Site Work
A pedestrian plaza improvement. Demolition of existing paving, grading, placement of new paving, ADA ramps with handrails, removal & relocation of pedestrian area lighting, planting beds, overstory & ornamental trees, and stormwater service improvements
| 06/22/2021 07:00 PM UTC |
Facilities Management Overhead Doors
Removal & replacement of multiple overhead doors and operators at the Facilities Management Building. Scope of work includes new overhead & entrance doors & associated framing & exterior panels.
| 06/17/2021 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.