General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Commons Window Replacement Phase 1
Remove and dispose of select exterior windows. Install new windows and repair/restore interior finishes and exterior masonry as required. Interior finishes include stone and wood sills, drywall, plaster and tile jambs. Exterior masonry includes brick and limestone masonry.
05/06/2025 07:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Industrial Technology Center Modernization (Applied Engineering Building) - Asbestos Abatement
Asbestos abatement of asbestos-containing drywall, sinks, flooring, and transite ceilings
02/22/2022 08:00 PM UTC
Football Practice Field Synthetic Turf Conversion Phase 2
A new entry sign monument, football video and power and data infrastructure.
02/10/2022 08:00 PM UTC
Rod Library Upgrade Two Elevators
The upgrade and modernization of existing traction elevators 'East' and 'West' within the Rod Library.
06/24/2021 07:00 PM UTC
27th Street Corridor Site Work
A pedestrian plaza improvement. Demolition of existing paving, grading, placement of new paving, ADA ramps with handrails, removal & relocation of pedestrian area lighting, planting beds, overstory & ornamental trees, and stormwater service improvements
06/22/2021 07:00 PM UTC
Facilities Management Overhead Doors
Removal & replacement of multiple overhead doors and operators at the Facilities Management Building. Scope of work includes new overhead & entrance doors & associated framing & exterior panels.
06/17/2021 07:00 PM UTC
Facilities Management Selective Roof Replacement
Remove existing rock ballast and EPDM membrane, reuse existing insulation, mechanically attached new insulation as specified, adhered new coverboard & install new adhered fleeceback KEE membrane.
06/08/2021 07:00 PM UTC
Facilities Management North Parking Lot - Phase 2
Reconstruction of the Phase 2 area of the Facilities Management North Parking Lot. Includes pavement removals, new subbase construction, new PC concrete pavement and replacement of the existing lighting system.
06/08/2021 07:00 PM UTC
Football Practice Field Synthetic Turf Conversion
Installation of new synthetic turf football field, sport field lighting, site fencing & utilities.
05/13/2021 07:00 PM UTC
Kamerick Art Building Metal Roof Replacement
Remove existing standing seam metal roof panels, install new 5/8" plywood substrate & self-adhering underlayment overtop of existing structural steel & subgirts, install new T-1238 standing seam metal roof assembly.
05/13/2021 07:00 PM UTC
Power Plant Boiler #4 VFD Installation
Removal and replacement of two existing variable frequency drives and their feeders.
04/20/2021 07:00 PM UTC
71 - 80 of 138 Solicitations
1 2 3 4 5 6 8 10 11 12 13 14