General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
Nielsen Field House Roof Replacement Phase 1
Tear off existing membrane and any wet insulation that is discovered. Replacement with additional insulation to achieve energy code requirements and installation of new membrane.
03/22/2022 07:00 PM UTC
Roth Roof Replacement & Exterior Improvements
Full replacement of the existing standing seam metal roof. The new roof shall be a prefinished standing seam metal roof system over the existing roof deck material. Includes new roof insulation, flashings, gutters, masonry tuckpointing of selected areas and re-caulk of masonry window joints.
03/22/2022 07:00 PM UTC
Maucker Union Room 113 International Engagement Updates
Modifications to Maucker Union Suite 113 including, but not limited to: new walls, ceilings, finishes and modifications to existing casework, electrical, plumbing, and mechanical systems.
03/17/2022 07:00 PM UTC
Power Plant Fuel Oil Piping Replacement
Replace compromised piping system, aging equipment, and improve reliability for the Power Plant No. 2 Fuel Oil system. Project will also upgrade associated auxiliary systems, including instrumentation, electrical service, and the process control system.
03/15/2022 07:00 PM UTC
Curris Business Building Rooms 19 & 21 HVAC Upgrades Phase 1
Installation of computer room air conditioning unit for Room 21, including roof mounted air cooled condensing unit and associated refrigeration piping and power.
02/22/2022 08:00 PM UTC
Industrial Technology Center Modernization (Applied Engineering Building) - Asbestos Abatement
Asbestos abatement of asbestos-containing drywall, sinks, flooring, and transite ceilings
02/22/2022 08:00 PM UTC
Football Practice Field Synthetic Turf Conversion Phase 2
A new entry sign monument, football video and power and data infrastructure.
02/10/2022 08:00 PM UTC
Rod Library Upgrade Two Elevators
The upgrade and modernization of existing traction elevators 'East' and 'West' within the Rod Library.
06/24/2021 07:00 PM UTC
27th Street Corridor Site Work
A pedestrian plaza improvement. Demolition of existing paving, grading, placement of new paving, ADA ramps with handrails, removal & relocation of pedestrian area lighting, planting beds, overstory & ornamental trees, and stormwater service improvements
06/22/2021 07:00 PM UTC
Facilities Management Overhead Doors
Removal & replacement of multiple overhead doors and operators at the Facilities Management Building. Scope of work includes new overhead & entrance doors & associated framing & exterior panels.
06/17/2021 07:00 PM UTC
71 - 80 of 143 Solicitations
1 2 3 4 5 6 8 10 11 12 13 14 15