General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Commons Window Replacement Phase 1
Remove and dispose of select exterior windows. Install new windows and repair/restore interior finishes and exterior masonry as required. Interior finishes include stone and wood sills, drywall, plaster and tile jambs. Exterior masonry includes brick and limestone masonry.
05/06/2025 07:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Strayer-Wood Theatre Seating Replacement
Replacement of all theatre seating which includes permanently fixed row seating & all of the telescoping seating.
04/15/2021 07:00 PM UTC
Curris Business Building - Hydraulic Elevator Modernization
Upgrades and modernization of an existing hydraulic elevator in Curris Business Building.
04/14/2021 07:00 PM UTC
Maucker Exterior Wall Repair
Demolish the north parapet wall. Rebuild in place and tuckpoint the remaining parapet walls. Regrade and repair turf area damaged through construction efforts.
04/13/2021 07:00 PM UTC
Institutional Roads 2021
Reconstruction of Center for Energy Environmental Education Drive, reconstruction of Nebraska Street, Jennings Drive Lighting System Replacement Phase 2 and Pavement/Maintenance W. 30th Street
03/25/2021 07:00 PM UTC
Kamerick Art Building Kiln Replacement
Removal of six existing kilns along with removal of one kiln exhaust stack. Installation, assembly & final connections of 4 new Owner supplied kilns.
03/23/2021 07:00 PM UTC
Student Health Center Updates Rooms 005, 016, & 103A
Renovation of the ground floor reception area and Room 005. Enclose Room 103A.
03/11/2021 08:00 PM UTC
Power Plant Roof Replacements
Replace roofs 3, 4, and 6 on the Power Plant building. Include addition of Roof Safety items. Bid alternates will include roofs 8 and 10.
02/11/2021 08:00 PM UTC
Power Plant Boiler #3 Electrical Infrastructure
Removal of the existing motor control centers panels, transformers and equipment feeders and their replacement with new distribution equipment, feeders and wiring. Removal and replacement of existing main Boiler #3 switchgear, its feeders, and its branch feeders.
01/21/2021 08:00 PM UTC
Power Plant Cooling Tower Condenser Piping Replacement
Replacing aging 24-inch cooling tower condenser water supply & return piping headers from the cooling towers to the steam turbine surface condenser.
12/22/2020 08:00 PM UTC
Steam Distribution System Replacement Phase 2C - South Campus and Tunnel T5 Vault Repairs
Installation of direct-buried, pre-insulated, steam and condensate piping. Additionally, work includes the construction of two(2) new utility vaults.
12/17/2020 08:00 PM UTC
81 - 90 of 138 Solicitations
1 2 5 6 7 9 11 12 13 14