General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
Steam Distribution System Tunnel T-2 Piping Repairs
Miscellaneous steam distribution system piping repairs in utility Tunnel T-2. Repairs include removal, replacement, installation, and relocation of expansion joints and isolation valves, installation and modifications to pipe anchors, guides, and support structures. Remove and replace pipe insulation and jacketing as required.
04/01/2025 07:00 PM UTC
Campbell Hall Utility Relocation
This project will relocate existing utilities around the building. The project will relocate 8” high pressure steam and 4” condensate around the building footprint. A new power duct bank will be installed along 23rd Street. A new communications duct bank will also be installed along Campus Street.
03/13/2025 07:00 PM UTC
Innovative Teaching and Technology Center Renovation for Nursing, Phase 3
The project will renovate the ground floor of the Innovative Teaching and Technology Center (ITTC) for use of advanced nursing courses. This renovation will provide advanced simulation spaces for education in the nursing program targeted at improving competency of nursing students. Students will receive hands-on experience with patients as well as high fidelity simulation experiences necessary to prepare them for real world experience.
03/13/2025 07:00 PM UTC
Institutional Roads 2025
Beeline + Blue. Copies may be downloaded at no charge from www.cgaplanroom.com or a printed copy may be obtained by contacting Beeline + Blue at 2507 Ingersoll Avenue, Des Moines, Iowa 50312, or by phone at (515)-244-1611. A $50.00 refundable deposit is required for all printed copies. This fee is REFUNDABLE, provided the following conditions are met: 1) The plans and specifications are returned to CGA complete and in good usable condition and 2) they are returned to the above address within fourteen (14) calendar days after the award of the project.
03/06/2025 08:00 PM UTC
Redeker Center Entrances and Skywalk Exterior Painting
This project involves preparation, rust treatment and repainting of exterior steel for Hagemann Hall, Rider Hall, Shull Hall and Noehren Hall Skywalks connecting the residence halls to the Redeker Center. Additional work includes preparation, rust treatment and repainting of the North and South Entry Canopies and structure on Redeker Hall. Miscellaneous additional work includes replacement of ADA door remote operator mounting plate, select insect screen replacement and installation of bird deterrent wire mesh screens. Preparation work for repainting may include pressure washing, hand and power tool preparation and commercial blast preparation of exterior surfaces. New paint installation included sealant replacement, priming and finish coat application.
02/25/2025 08:00 PM UTC
Tower Center and Redeker Center Mailroom Renovation
To better respond to the myriad of delivery services that are available to students and staff, parcel delivery lockers are being added to Redeker and the Towers student centers. In Redeker, space is captured from an existing open office area and adjacent student lounge. In Towers, an existing conference area is being re-purposed. Both configurations allow for package delivery at various times while the buildings are open.
02/20/2025 08:00 PM UTC
Lang Hall Gutter Repairs
Project includes the removal and replacement of existing gutter liner with a new EPDM gutter liner and associated sheet metal flashings as well as minor tie-in with adjacent EPDM roof membrane. Removal and reinstallation of electric heat tape will be required to accomplish this work. Project also includes the cleaning of efflorescence from approximately 50 SF of existing brick.
02/20/2025 08:00 PM UTC
Bender Hall Exterior Envelope Repairs
The project includes full roof replacement, full roof replacement of the skywalk link, application of a water repellant onto the precast concrete wall panels and exterior joint sealant replacement at the precast concrete wall panels.
02/06/2025 08:00 PM UTC
UNI-Dome Modernization Phase 2.1
The Phase 2.1 of this project includes new general and premium seating throughout the Dome, in addition to new Suites. Total seating count will approximately be about 12,000 seats. Aisles will be widened with handrails, and seats will be wider. Seating counts and accessibility will be in compliance with ADA. There will be structural, architectural and some infrastructure design in the premium seating areas. This phase will also include an elevator on the west side of the Dome.
02/04/2025 08:00 PM UTC
ITC Modernization-Parking Lot
This project will remove and replace all the concrete parking surface of Lot 403. Adjacent Sidewalks will be replaced and alignments improved to the AEB and tunnel access. There will be several overgrown tree removals with new plant material, amended soils and mulch installed to enhance the site. Site electrical, Site utilities and Stormwater engineering will be part of the project.
01/30/2025 08:00 PM UTC
11 - 20 of 143 Solicitations
2 4 5 6 7 8 9 14 15